More Questions on Indian Railway
- Q. Which is the following pairs of regional Railways and their headquarters not true?
A)South Railway - Chennai
B)South-Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. How many dead engine can be attached in a goods train?
A)3
B)1
C)2
D)4
Answer: 1
- Q. “C” class ODC is run with the permission of ________.
A)Head Quarter
B)DOM
C)CRS
D)None of these
Answer: CRS
- Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter
B)01 meter
C)02 meter
D)04 meter
Answer: 01 meter
- Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
A)20
B)10
C)15
D)25
Answer: 10
- Q. The headquarter of Central Railway situated at?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw
B)Piyush Goyal
C)Nirmala Sitharaman
D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
- Q. In case of accident, siren is repeated at an interval of ________ minutes.
A)20
B)10
C)15
D)5
Answer: 5
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph
- Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
A)100 meters
B)45 meters
C)50 meters
D)1000 meters
Answer: 45 meters
- Q. Who invented the railway engine?
A)James Watt
B)Charles Babbage
C)Isaac Newton
D)George Stephenson
Answer: George Stephenson
- Q. What is the length of North-Eastern Frontier Railway (NFR)?
A)4290 km
B)4300 km
C)3700 km
D)5298 km
Answer: 3700 km
- Q. Fly shunting will take place in
A)Flat Yard
B)Hump Yard
C)Gravity Yard
D)None of these
Answer: Hump Yard
- Q. The speed of a Trolley is
A)15 kmph
B)20 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. In case of 1 in 100 rising gradient, ________ siding is provided.
A)Slip
B)Long
C)Catch
D)None of these
Answer: Slip
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Q. Maximum speed of B’ class ODC is ________ km/h.
A)60
B)50
C)40
D)75
Answer: 40
- Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
A)6
B)10
C)12
D)None of these
Answer: 6
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State