Q. Accident drill is ordered by DRM and is conducted under the supervision of ________

Correct Answer

ADRM/Sr.DSO/DSO

More Questions on Indian Railway

  • Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Second
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. There is insufficient vacuum/pressure in engine.
    A)_____00
    B)___0___
    C)0___0
    D)00-----
    Answer: 00-----
  • Q. Which is the shortest station name in Indian Railways?
    A)Goa
    B)Pune
    C)Bc
    D)Ib
    Answer: Ib
  • Q. Where is the headquarters of Central Railway situated?
    A)Gwalior
    B)Mumbai (CST)
    C)Mumbai (Church Gate)
    D)Gorakhpur
    Answer: Mumbai (CST)
  • Q. Medical relief van shall be dispatched within ________ minutes from double exit siding.
    A)15
    B)10
    C)20
    D)25
    Answer: 15
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. How an automatic stop signal can be recognized?
    A)Eliminated A marker
    B)A marker on white disk
    C)No mark
    D)Four aspects
    Answer: A marker on white disk
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. Adequate distance means the distance sufficient to ensure ________.
    A)Station Limit
    B)Safety
    C)Non-Safety
    D)None of these
    Answer: Safety
  • Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
    A)Rail Wheel Factory
    B)Modern Coach Factory
    C)Integral Coach Factory
    D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
    Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
  • Q. During single line working of DL the speed of the first train is ________ kmph
    A)15
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. The additional Hours in the case of staff posted at way side stations who are provided with quarters within 0.5kkm will be ________ beyond.
    A)24 Hours
    B)12 Hours
    C)08 Hours
    D)16Hours
    Answer: 24 Hours
  • Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
    A)20
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. TCAS full form is:
    A)Train Collision Avoidance Software
    B)Train Collision Advance System
    C)Train Complement Accident Software
    D)Traffic Collision Avoidance System
    Answer: Traffic Collision Avoidance System
  • Q. By whom the rear portion of train left behind in block section protected?
    A)By engineearing official
    B)By Guard
    C)By LP
    D)No need to protect the load
    Answer: By Guard
  • Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
    A)In Break van
    B)At Facing point
    C)On Engine
    D)At Anyplace
    Answer: In Break van

Leave a Comment