Q. 400 meters beyond the home signal of a C’ class station is called as ________.

Correct Answer

Overlapping block section

More Questions on Indian Railway

  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Train is to be passed through loop line.
    A)30 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Slip siding protects
    A)Station section
    B)Station limit
    C)Block section
    D)None of these
    Answer: Block section
  • Q. Which of the following two countries have largest electrified railway network in the world?
    A)Russia & China
    B)Russia & US
    C)US & China
    D)India & US
    Answer: Russia & China
  • Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
    A)8
    B)10
    C)5
    D)25
    Answer: 25
  • Q. When was the first train in India started?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. To start a train from unsignalled line ________ authority is issued.
    A)T/511
    B)T/512
    C)T/515
    D)T/521
    Answer: T/511
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. Apart from the regular store, Guard of material train must also possess ________.
    A)Third aid box
    B)First aid box
    C)Second aid box
    D)None of these
    Answer: First aid box
  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
    A)Shunt signal
    B)Calling-on Signal
    C)Home Signal
    D)None of these
    Answer: Home Signal
  • Q. Which state has the longest route (in kilometers) of railway line in India?
    A)Rajasthan
    B)Maharashtra
    C)Andhra Pradesh
    D)Uttar Pradesh
    Answer: Uttar Pradesh
  • Q. When was the first train steamed off in India?
    A)1875
    B)1848
    C)1853
    D)1880
    Answer: 1853
  • Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
    A)43
    B)41
    C)42
    D)45
    Answer: 45
  • Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
    A)85
    B)60
    C)75
    D)90
    Answer: 90
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. The speed of lorry shall not exceed
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. At the starting station, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)30 kmph
    Answer: 10 kmph
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters