Q. 2 states of North East India will be connected through Broad Gauge. They are:

Correct Answer

Mizoram and Manipur

More Questions on Indian Railway

  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. Fly shunting will take place in
    A)Flat Yard
    B)Hump Yard
    C)Gravity Yard
    D)None of these
    Answer: Hump Yard
  • Q. Load infringing standard moving dimensions (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
    A)15/10 km/h
    B)25/10 km/h
    C)20/10 km/h
    D)None of these
    Answer: 15/10 km/h
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. Block overlap in multiple aspect signalling system is ________ meters.
    A)180
    B)200
    C)300
    D)208
    Answer: 180
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
    A)2
    B)1.5
    C)1
    D)None of these
    Answer: 1.5
  • Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
    A)Red hand signal
    B)Yellow signal
    C)Green signal
    D)None of these
    Answer: Red hand signal
  • Q. Number of the Nil caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 408
    D)None of these
    Answer: T/A 409
  • Q. During shunting, outer, home and ________ signals are not taken off.
    A)Both
    B)Last stop signal
    C)First stop signal
    D)None of these
    Answer: First stop signal
  • Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. In case of ACP, Guard of EMU shall give ________ bell.
    A)0-00-00
    B)00-00-00
    C)00-0-00
    D)000-0-00
    Answer: 00-0-00
  • Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
    A)0-00
    B)00-00
    C)000-000
    D)None of these
    Answer: 00-00
  • Q. In the enroute, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
    A)Two
    B)Four
    C)Three
    D)Any one
    Answer: Three