Q. If the block instrument becomes defective on a double line, ________ signal is also treated as defective.

Correct Answer

Last stop signal

More Questions on Indian Railway

  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. When was the Jammu City appeared on the map of Indian Railway?
    A)1967
    B)1956
    C)1963
    D)1965
    Answer: 1965
  • Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. A jumper is remote control and is used for ________.
    A)Control on Light, Fan etc.
    B)Light
    C)Fans
    D)None of these
    Answer: Control on Light, Fan etc.
  • Q. Which road suburban railway station in Mumbai has been rechristened as Prabhadevi station?
    A)Churchgate
    B)Boisar
    C)Andheri
    D)Elphinstone
    Answer: Elphinstone
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. Maximum of ________ cranes can be attached in a passenger train.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. On which speed BG train should be run while speedometer failed in block section?
    A)No need to reduced speed
    B)10% less of sectional speed
    C)10% less of booked speed
    D)40 kmph
    Answer: 10% less of sectional speed
  • Q. Rajasthan is under which of the following railway zones?
    A)North - Western region
    B)Northern region
    C)Western region
    D)Central Region
    Answer: North - Western region
  • Q. What is the position of the Indian Railway under the zonal system?
    A)Third
    B)First
    C)Second
    D)Forth
    Answer: Second
  • Q. What is the speed of A class ODC in BG?
    A)40 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. Station limit is the portion between ________.
    A)Both
    B)Outermost signal
    C)Innermost signal
    D)None of these
    Answer: Outermost signal
  • Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
    A)One long
    B)Three long
    C)Short one long
    D)None of these
    Answer: Three long
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. EMU train has ________ type of couplings.
    A)Shakuu
    B)Shakau
    C)Shakua
    D)None of these
    Answer: Shakau
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. Which of the gauges is used in the hilly areas?
    A)Narrow gauge
    B)Broad gauge
    C)Meter gauge
    D)Special gauge
    Answer: Narrow gauge
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. Material train is a ________ train.
    A)Both
    B)Departmental
    C)Permanent
    D)None of these
    Answer: Departmental