More Questions on Indian Railway
- Q. Second train during TSL will be dispatched after ________.
A)Both
B)Line clear
C)Without line clear
D)None of these
Answer: Line clear
- Q. Reminder Caution order number is ________.
A)T/C-408
B)T/B-409
C)T/A-409
D)None of these
Answer: T/B-409
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958
- Q. Point indicator shows ________ light when the points are set for loop line.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. When a running line is occupied ________ entry must be made in TSR.
A)Yellow Ink
B)Red Ink
C)Green Ink
D)None of these
Answer: Red Ink
- Q. Introduced ________ in Konkan Railway to help old and disabled passengers.
A)Divyang Express
B)Sahayak Express
C)Viklang Seva Express
D)Sarathi Seva
Answer: Sarathi Seva
- Q. The shuttle train service between Lahore and ________ railway station resumed its operation on 15 December after a gap of 22 years.
A)Amritsar
B)Wagah
C)Islamabad
D)Faridkot
Answer: Wagah
- Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
A)T/369(1)
B)T/369(3b)
C)T/369(2)
D)T/409
Answer: T/409
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
A)25 kmph
B)10 kmph
C)15 kmph
D)30 kmph
Answer: 10 kmph
- Q. During shunting, outer, home and ________ signals are not taken off.
A)Both
B)Last stop signal
C)First stop signal
D)None of these
Answer: First stop signal
- Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85
B)60
C)75
D)90
Answer: 90
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. In context with the Indian railways what is TPWS?
A)Train Protection Warning Stopper
B)Train Passenger Warning System
C)Train Protection Warning System
D)Transmission Protection warning Stopper
Answer: Train Protection Warning System
- Q. ________ percent sub – quota for women under all reserved categories
A)33
B)30
C)35
D)40
Answer: 33
- Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
A)NTPC
B)ONGC
C)GAIL India
D)IOCL
Answer: GAIL India
- Q. The speed of a Trolley is
A)15 kmph
B)20 kmph
C)8 kmph
D)None of these
Answer: 15 kmph