Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
A)3 B)1 C)2 D)4
Answer: 3
Q. Normal condition of automatic stop signal is ________.
A)Yellow B)Red C)Green D)None of these
Answer: Green
Q. Material train is a ________ train.
A)Both B)Departmental C)Permanent D)None of these
Answer: Departmental
Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph B)40 kmph C)20 kmph D)None of these
Answer: 40 kmph
Q. Which authority shall be received from station in rear to pass defective home signal?
A)T-409 B)T-369(3b) C)T-369(1) D)Simple memo
Answer: T-369(1)
Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
A)2 & 3 Only B)1 & 2 Only C)3 Only D)1, 2 & 3
Answer: 1, 2 & 3
Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section B)Station diary C)Diary D)None of these
Answer: Station diary
Q. Matheran Hill Railway is located in which state of India?