- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. Normally maximum gradient in station yards in BG is (at present)
A)1 in 1000
B)1 in 260
C)1 - 400
D)None of these
Answer: 1 - 400
- Q. Elphinstone Road suburban railway station which was recently renamed as Prabhadevi is situated in?
A)Tamil Nadu
B)Mumbai
C)Bengaluru
D)New Delhi
Answer: Mumbai
- Q. Caution order is carried forward at stations on Monday at ________ hours.
A)12:00
B)10:00
C)11:00
D)09:00
Answer: 09:00
- Q. How many systems of working in Indian Railways for train operation?
A)8
B)6
C)7
D)9
Answer: 6
- Q. What will be the maximum speed of B-Class ODC in Broad guage?
A)40 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 40 kmph
- Q. For extinguished home signal, Loco Pilot will be issued ________ authority form the station in rear in MACLS system.
A)16
B)20
C)12
D)10
Answer: 16
- Q. What is the name of the first train of Indian Railways handed over to private players for operation?
A)Karnataka Express
B)Tejas Express
C)Shatabdi Express
D)Duronto Express
Answer: Tejas Express
- Q. 2 states of North East India will be connected through Broad Gauge. They are:
A)Meghalaya and Assam
B)Manipur and Meghalaya
C)Mizoram and Manipur
D)Mizoram and Arunachal Pradesh
Answer: Mizoram and Manipur
- Q. On which time the watch shall be set by loco pilot with Station masters watch?
A)A & B both
B)At 8.00 Hrs
C)At 16.00 Hrs
D)At the time of on duty
Answer: At the time of on duty
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. What is the speed of second train on double line section running on T/A602?
A)10 kmph
B)20 kmph
C)15 kmph
D)8 kmph
Answer: 8 kmph
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. The maximum distance covered by a patrol man should not normally exceed
A)15 KM
B)10 KM a day
C)12 KM
D)None of these
Answer: 10 KM a day
- Q. Which state to have India’s first privately – run railway station?
A)Kerala
B)Tripura
C)Odisha
D)Madhya Pradesh
Answer: Madhya Pradesh
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red