Q. What is the length of North-Eastern Frontier Railway (NFR)?

Correct Answer

3700 km

More Questions on Indian Railway

  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. In which city is the Wheel and Axle Plant of the Indian Railways located?
    A)Bangalore
    B)Kapurthala
    C)Varanasi
    D)Rae Barelly
    Answer: Bangalore
  • Q. passing through station during day when running without brakevan and tail board.
    A)25 kmph
    B)10 kmph
    C)20 kmph
    D)Normal speed
    Answer: 20 kmph
  • Q. Repeating signal shows ________ light in ON condition.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. Weight required minimum for testing IC Apparatus is the
    A)7 - 10 kg
    B)6 kg
    C)10 kg
    D)None of these
    Answer: 7 - 10 kg
  • Q. Dead engine is attached at ________ position on a Mail / Express train.
    A)Both
    B)Engine to engine
    C)Next to engine
    D)None of these
    Answer: Next to engine
  • Q. No passenger train shall be started from a station before the ________ time
    A)Both
    B)Advertised
    C)Non-advertised
    D)None of these
    Answer: Advertised
  • Q. In the enroute, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. Which train in India has the longest route length?
    A)Kanyakumari - Dibrugarh Vivek Express
    B)Howrah - Jammu Tawi Himgiri Express
    C)Kanyakumari - Jammu Tawi Himsagar Express
    D)Guwahati - Tiruvananthapuram Express
    Answer: Kanyakumari - Dibrugarh Vivek Express
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
    A)0000-000
    B)000000-0000 0
    C)00000-0
    D)0000-0000
    Answer: 000000-0000 0
  • Q. Which Zone is the largest in Indian Railways?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Eastern Railway
  • Q. Moped trolley / Scooter trolley treated as ________.
    A)Motor Trolley
    B)Push Trollies
    C)Trolley
    D)None of these
    Answer: Motor Trolley
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
    A)Defective
    B)Caution
    C)Cautiously
    D)None of these
    Answer: Cautiously
  • Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
    A)10
    B)15
    C)20
    D)25
    Answer: 10
  • Q. 400 meters beyond the home signal of a C’ class station is called as ________.
    A)Last stop signal
    B)Block section
    C)Overlapping block section
    D)None of these
    Answer: Overlapping block section
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left