Q. The form number of authority to proceed without line clear is ________.

Correct Answer

T/1408

More Questions on Indian Railway

  • Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
    A)300/400
    B)500/600
    C)400/500
    D)None of these
    Answer: 500/600
  • Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Second
  • Q. Maximum speed of pushing back is ________ km/h.
    A)45
    B)30
    C)25
    D)40
    Answer: 25
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Speed of second train during temporary single line working is ________.
    A)Both
    B)Normal
    C)Abnormal
    D)None of these
    Answer: Normal
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. How much block overlap is required at the station equipped with MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. S mark on the EMU coach means ________.
    A)Scroll
    B)Release
    C)Spare
    D)None of these
    Answer: Spare
  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. Where was the B.B.C.I locomotive started?
    A)Boriville
    B)Jamalpur
    C)Parel
    D)Hyderabad
    Answer: Parel
  • Q. On which speed BG engine shall be run while speedometer is defective during run?
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)Maximum 10% less of MPS
    Answer: Maximum 10% less of MPS
  • Q. Who is the current director general of Railway Protection Force (RPF)?
    A)Dharmendra Kumar
    B)Brij Mohanty
    C)S H Prakash
    D)Arun Kumar
    Answer: Arun Kumar
  • Q. Block back are used at?
    A)Single/Double line both
    B)On Single line
    C)On Double line
    D)None of these
    Answer: Single/Double line both
  • Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
    A)3
    B)1
    C)2
    D)4
    Answer: 2
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911
  • Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
    A)600
    B)500
    C)400
    D)800
    Answer: 600
  • Q. Goods warning board will be provided from FSS in BG at
    A)560 meters
    B)1400 meters
    C)1000 meters
    D)None of these
    Answer: 1400 meters
  • Q. After how much time Any goods train shall be treated as overdue train?
    A)After 20 minutes
    B)After 10 minutes
    C)After 15 minutes
    D)After 25 minutes
    Answer: After 20 minutes

Leave a Comment