Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A
15 kmph
B
25 kmph
C
20 kmph
D
None of these
Correct Answer
25 kmph
More Questions on Indian Railway
Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
A)2 gangman B)JE(Pway) C)One gangman D)None of these
Answer: JE(Pway)
Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective B)Caution C)Cautiously D)None of these
Answer: Cautiously
Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200 B)600 C)800 D)None of these
Answer: 600
Q. Which state government has recently signed MoU with Indian Railways to expand green cover?