Q. During failure of signals and communications in DL automatic area the authority to proceed is

Correct Answer

T/B 912

More Questions on Indian Railway

  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year
  • Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
    A)15
    B)20
    C)25
    D)30
    Answer: 30
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. In case of defective head light, ________ bell code is given on block instrument to the station in advance.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-0
  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. ________ brake is not provided in the coach of passenger train.
    A)Minor
    B)Hand
    C)Non-hand
    D)None of these
    Answer: Hand
  • Q. Length of a BG ICF Coach is
    A)21.337 meters
    B)22.089 meters
    C)21.494 meters
    D)None of these
    Answer: 21.337 meters
  • Q. Between which of the destinations the first Indian train was started?
    A)From Mumbai to Surat
    B)From Kolkata to Delhi
    C)From Mumbai to Thane
    D)From Mumbai to Madras
    Answer: From Mumbai to Thane
  • Q. Who is the current director general of Railway Protection Force (RPF)?
    A)Dharmendra Kumar
    B)Brij Mohanty
    C)S H Prakash
    D)Arun Kumar
    Answer: Arun Kumar
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. For which time Guard rough journal must be kept safe?
    A)Upto 3 Years
    B)Upto 1 Year
    C)Upto 2 Years
    D)Upto 6 Months
    Answer: Upto 3 Years
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Amount of vaccum level required in high speed train loco is
    A)56 cm
    B)50 cm
    C)55 cm
    D)None of these
    Answer: 56 cm
  • Q. Matheran Hill Railway is located in which state of India?
    A)Odisha
    B)Himachal Pradesh
    C)Maharashtra
    D)Meghalaya
    Answer: Maharashtra
  • Q. The Speaker of Lok Sabha also works as the ex – officio Chairperson of which of the following committees? 1)Railway Convention Committee 2)Business Advisory Committee 3)Public Account Committee Select the correct option from the codes given below:
    A)1 & 3 Only
    B)1 & 2 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 2 Only
  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. Maximum speed of B’ class ODC is ________ km/h.
    A)60
    B)50
    C)40
    D)75
    Answer: 40
  • Q. Apart from the regular store, Guard of material train must also possess ________.
    A)Third aid box
    B)First aid box
    C)Second aid box
    D)None of these
    Answer: First aid box
  • Q. SCOR maintains ________ register when serious accident occurs.
    A)Chronological
    B)Logical
    C)Un-logical
    D)None of these
    Answer: Chronological