Q. What is the maximum speed of a goods train pushed backed from block section ?

Correct Answer

8 kmph

More Questions on Indian Railway

  • Q. Which state to have India’s first privately – run railway station?
    A)Kerala
    B)Tripura
    C)Odisha
    D)Madhya Pradesh
    Answer: Madhya Pradesh
  • Q. Who has been appointed as the new Chairman of Railway Board?
    A)P S Thakur
    B)V K Yadav
    C)A K Mittal
    D)Neelmani Reddy
    Answer: V K Yadav
  • Q. Normally material train will work during ________.
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day
  • Q. Where is the wheel and axle plant of Indian Railways situated?
    A)Bangalore
    B)Chittranjan
    C)Kapurthala
    D)Perambur
    Answer: Bangalore
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph
  • Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
    A)CSO
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. The railway station situated in the extreme south is
    A)Kanyakumari
    B)Chennai
    C)Cochin
    D)Trivandrum
    Answer: Kanyakumari
  • Q. How much minimum BP pressure is reduce to require to apply brake in a goods train?
    A)1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    B)Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    C)1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
    D)
    Answer: Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
  • Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
    A)139
    B)144
    C)123
    D)119
    Answer: 139
  • Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
    A)10 kmph
    B)25 kmph
    C)15 kmph
    D)None of these
    Answer: 25 kmph
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. If a member disagrees with the reasons of the joint note of an accident, he may give
    A)Both
    B)Accident
    C)Dissent
    D)None of these
    Answer: Dissent
  • Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
    A)01 long
    B)03 long
    C)02 long
    D)None of these
    Answer: 03 long
  • Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
    A)Assam and Maharashtra
    B)Manipur and Jammu & Kashmir
    C)Jammu & Kashmir & Assam
    D)Maharashtra and Jammu & Kashmir
    Answer: Manipur and Jammu & Kashmir
  • Q. Rajasthan is under which of the following railway zones?
    A)North - Western region
    B)Northern region
    C)Western region
    D)Central Region
    Answer: North - Western region
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. Target time for ARME from double exit siding is?
    A)45 minutes
    B)20 minutes
    C)30 minutes
    D)60 minutes
    Answer: 20 minutes
  • Q. During serious accident, ________ will be the in-charge of control office.
    A)Sr. DOM
    B)DOM
    C)AOM
    D)None of these
    Answer: Sr. DOM