Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?

Correct Answer

Stop his train and find the cause

More Questions on Indian Railway

  • Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
    A)1 - 890 meters
    B)1 - 98 meters
    C)1 - 830 meters
    D)None of these
    Answer: 1 - 98 meters
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. The speed of a Trolley is
    A)15 kmph
    B)20 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. In the enroute, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. What is the position of the Indian Railway under the zonal system?
    A)Third
    B)First
    C)Second
    D)Forth
    Answer: Second
  • Q. Hand shunting speed is ________
    A)8 kmph
    B)5 kmph
    C)10 kmph
    D)None of these
    Answer: 5 kmph
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. Motorman shall give ________ beat to release the hand brakes.
    A)00-00-00
    B)00-0-00
    C)0-0-0
    D)0-00-00
    Answer: 00-0-00
  • Q. Indian Railway will publish new Magazine in all regional language. The name of that Magazine is:
    A)Rail Prakashan
    B)Rail Line
    C)Big Thing, Big Way
    D)Rail Bandhu
    Answer: Rail Bandhu
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. When a Goods train is working without guard or BV or Guard and BV the speed is
    A)10
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. Signals are treated as ________ if connected points become defective.
    A)Both
    B)Defective
    C)Restricted
    D)None of these
    Answer: Defective
  • Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
    A)--0
    B)0-0
    C)-0-
    D)---
    Answer: 0-0
  • Q. It is the responsibility of SM to see that shunting is performed as per ________.
    A)G&R
    B)WTT
    C)SWR
    D)None of these
    Answer: SWR
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. Warner signal is of ________ shape in TALQ signalling system.
    A)Both
    B)Fish Tailed
    C)Long
    D)None of these
    Answer: Fish Tailed
  • Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
    A)NTPC
    B)ONGC
    C)GAIL India
    D)IOCL
    Answer: GAIL India