- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
A)145
B)45
C)90
D)150
Answer: 45
- Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600
B)500
C)400
D)800
Answer: 600
- Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling
B)ARS
C)Tail Lamp
D)None of these
Answer: ARS
- Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph
B)2 kmph
C)2.5 kmph
D)3.5 kmph
Answer: 2.5 kmph
- Q. Capacity of a slip siding is ________
A)06 or 07 wagon
B)03 or 04 wagon
C)04 or 05 wagon
D)None of these
Answer: 03 or 04 wagon
- Q. BP in the Guard cab of EMU shall be ________ kg/cm2 and Motor mans cab shall be 4.6 kg/cm2.
A)4
B)4.2
C)4.01
D)4.6
Answer: 4.6
- Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
A)Rajinder Sachar Committee
B)Bibek Deberoy committee
C)Rangarajan committee
D)Mihir Shah Committee
Answer: Bibek Deberoy committee
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. Where is RDSO Situated.
A)Chennai
B)Vadodara
C)Lucknow
D)New Delhi
Answer: Lucknow
- Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
A)540
B)900
C)580
D)570
Answer: 580
- Q. After how much time Any goods train shall be treated as overdue train?
A)After 20 minutes
B)After 10 minutes
C)After 15 minutes
D)After 25 minutes
Answer: After 20 minutes
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. Booked speed is fixed by ________.
A)Sr. DOM
B)COM
C)CCM
D)None of these
Answer: COM
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. It is the responsibility of SM to see that shunting is performed as per ________.
A)G&R
B)WTT
C)SWR
D)None of these
Answer: SWR
- Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km
B)4300 Km
C)3700 Km
D)5298 km
Answer: 3700 Km
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. Indian Railways has launched an integrated mobile app “Rail Saarthi” for railway passengers. What does “Saarthi” stands for?
A)Synchronous Advanced Application Rail Travel Help and Information
B)Synergised Advanced Application Rail Travel Help and Information
C)Synchronic Advanced Application Rail Travel Help and Information
D)Synergic Advanced Application Rail Travel Help and Information
Answer: Synergised Advanced Application Rail Travel Help and Information