Q. What is the target time for ART during night hours?

Correct Answer

45 minutes

More Questions on Indian Railway

  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. Motorman shall give ________ beat to release the hand brakes.
    A)00-00-00
    B)00-0-00
    C)0-0-0
    D)0-00-00
    Answer: 00-0-00
  • Q. What does the Slip siding protects?
    A)Block Section
    B)Station Section
    C)Station Limit
    D)Siding
    Answer: Block Section
  • Q. Point indicator is provided to indicate ________.
    A)Both
    B)Points
    C)Bar
    D)None of these
    Answer: Points
  • Q. What is the length of North – Eastern Frontier Railway (NEFR)?
    A)4290 km
    B)4300 Km
    C)3700 Km
    D)5298 km
    Answer: 3700 Km
  • Q. In automatic block system SL, the signal that can be dispensed with is
    A)Automatic Stop signal
    B)Home
    C)Starter
    D)None of these
    Answer: Automatic Stop signal
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. The largest national enterprise of India is
    A)Airways
    B)Indian Railway
    C)Indian Shipyard
    D)Waterways
    Answer: Indian Railway
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
    A)Army Head Quarter
    B)Railway Board
    C)Zonal HQ
    D)None of these
    Answer: Army Head Quarter
  • Q. Warning boards for neutral section shall be fixed at a distance of
    A)300 and 600 meters
    B)400 and 600 meters
    C)500 and 250 meters
    D)None of these
    Answer: 500 and 250 meters
  • Q. High flood level mark shall be painted in
    A)Blue
    B)Red
    C)White
    D)None of these
    Answer: Red
  • Q. The speed of lorry shall not exceed
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. When was the construction work for the first Railway line Started?
    A)1823
    B)1821
    C)1828
    D)1830
    Answer: 1821
  • Q. Signal sighting committee consists of TI, SI/PWI and ________.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. 2 states of North East India will be connected through Broad Gauge. They are:
    A)Meghalaya and Assam
    B)Manipur and Meghalaya
    C)Mizoram and Manipur
    D)Mizoram and Arunachal Pradesh
    Answer: Mizoram and Manipur
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Cotton in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Second

Leave a Comment