More Questions on Indian Railway
- Q. Which railway station has become the India’s first station to run by all women staff?
A)Chhatrapati Shivaji Terminus railway station
B)Matunga railway station
C)Hazrat Nizamuddin railway station
D)Kolkata railway station
Answer: Matunga railway station
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
A)New Delhi and Kanyakumari
B)Ernakulam and Howrah
C)Sriganganagar and Tiruchirapalli
D)Nizamuddin and Palakkad
Answer: Ernakulam and Howrah
- Q. Number of the caution order is ________
A)T/410
B)T/409
C)T/408
D)None of these
Answer: T/409
- Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
A)Not more than two bogies or their equivalent
B)Two Bogies
C)04 four wheelers only
D)None of these
Answer: Not more than two bogies or their equivalent
- Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
A)0000-000
B)000000-0000
C)00000-0
D)0000-0000
Answer: 000000-0000
- Q. The turning out time off BD SPL. During day is ________ minutes
A)50
B)30
C)20
D)None of these
Answer: 30
- Q. During prolonged failure of signals in automatic section, ________ authority is issued.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
A)In Break van
B)At Facing point
C)On Engine
D)At Anyplace
Answer: In Break van
- Q. Shunt signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: First stop signal
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. Maximum speed of shunting of wagons with explosives is ________ km/h.
A)15
B)8
C)10
D)20
Answer: 8
- Q. The first locomotive which was manufactured in Chittaranjan on
A)Sep - 1949
B)Nov - 1950
C)Oct - 1950
D)Oct - 1954
Answer: Nov - 1950
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Q. Which of the following two countries have largest electrified railway network in the world?
A)Russia & China
B)Russia & US
C)US & China
D)India & US
Answer: Russia & China
- Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
A)Both are true
B)Only 1 is true
C)Only 2 is true
D)Neither is true
Answer: Both are true
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Q. ndian Railway’s Jamalpur Workshop is located at?
A)Bihar
B)West Bengal
C)Orissa
D)Uttar Pradesh
Answer: Bihar
- Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
A)T/369(1)
B)T/369(3b)
C)T/369(2)
D)T/409
Answer: T/409
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State