Q. The distance between two automatic signals is normally
A)3 km B)2 km C)1 km D)None of these
Answer: 1 km
Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
A)10 B)15 C)20 D)25
Answer: 10
Q. What is the speed of A class ODC in BG?
A)40 kmph B)15 kmph C)25 kmph D)Normal speed
Answer: Normal speed
Q. BP in the Guard cab of EMU shall be ________ kg/cm2 and Motor mans cab shall be 4.6 kg/cm2.
A)4 B)4.2 C)4.01 D)4.6
Answer: 4.6
Q. For work of long duration, the stop indicator must be erected at not less than
A)40 B)30 C)50 D)45
Answer: 30
Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
A)North Korea B)Japan C)South Korea D)China
Answer: Japan
Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: 2 Only
Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph B)40 kmph C)20 kmph D)None of these
Answer: 40 kmph
Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40 B)20 C)30 D)None of these
Answer: 30
Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective B)Restricted C)Most restricted D)Noe of these
Answer: Most restricted
Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
A)C & W B)Engineering C)Mechanical D)None of these
Answer: Mechanical
Q. Normally maximum gradient in station yards in BG is (at present)
A)1 in 1000 B)1 in 260 C)1 - 400 D)None of these
Answer: 1 - 400
Q. Permission of ________ is required to work the material train in the night.
A)DRM B)AOM C)DOM D)None of these
Answer: DRM
Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
A)15 B)25 C)20 D)10
Answer: 25
Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC B)A Class/IBS C)C Class/IBS D)None of these
Answer: C Class/IBS
Q. While pushing back, train shall be stopped at ________ stop signal.
A)Slip B)Outermost C)Rear most D)None of these
Answer: Outermost
Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.