Q. 2 states of North East India will be connected through Broad Gauge. They are:

Correct Answer

Mizoram and Manipur

More Questions on Indian Railway

  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. The numbers of A, B and C coaches are 72, ________ and 76.
    A)71
    B)72
    C)70
    D)75
    Answer: 70
  • Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
    A)0000-000
    B)000000-0000
    C)00000-0
    D)0000-0000
    Answer: 000000-0000
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. Who has been appointed as the new Chairman of Railway Board?
    A)P S Thakur
    B)V K Yadav
    C)A K Mittal
    D)Neelmani Reddy
    Answer: V K Yadav
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
    A)30
    B)20
    C)25
    D)15
    Answer: 15
  • Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
    A)6 hours
    B)12 hours
    C)8 hours
    D)2 Hours
    Answer: 8 hours
  • Q. Warner signal is of ________ shape in TALQ signalling system.
    A)Both
    B)Fish Tailed
    C)Long
    D)None of these
    Answer: Fish Tailed
  • Q. There is insufficient vacuum/pressure in engine.
    A)_____00
    B)___0___
    C)0___0
    D)00-----
    Answer: 00-----
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. Under approved special instructions, Distant signal can be placed along with the
    A)Both
    B)Last Stop
    C)First Stop
    D)None of these
    Answer: Last Stop
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Which Zone is the largest railway zone in India?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Northern Railway
  • Q. If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
    A)Received train
    B)Through
    C)Train parted
    D)None of these
    Answer: Train parted