Q. In double Distant signalling, outermost signal post is painted with ________.

Answer

Correct Answer : Black & Yellow

Q. In how many zones Indian Railway has been divided?

Answer

Correct Answer : 17

Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.

Answer

Correct Answer : T/409

Q. In Material train, vehicles shall not be detached on gradient.

Answer

Correct Answer : 1-100 or steeper

Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is

Answer

Correct Answer : 75 kmph

Q. In one train only system, information of lost of metal token is given to ________.

Answer

Correct Answer : DRM

Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.

Answer

Correct Answer : PN

Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:

Answer

Correct Answer : Electricity

Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.

Answer

Correct Answer : Outer

Q. IN the BD Spl, the water must be filled ________.

Answer

Correct Answer : Once a week