More Questions on Indian Railway
- Q. When ISMD attached train is allowed to run through on PF line the speed must be
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. In which class overlapping section is found?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Diesel locomotives are built in?
A)Perambur
B)Banglore
C)Varanasi
D)Hubli
Answer: Varanasi
- Q. At the starting station, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
A)One short
B)Two short
C)Three short
D)Noen of these
Answer: Two short
- Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
A)72
B)24
C)48
D)None of these
Answer: 72
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
A)5
B)4
C)2
D)8
Answer: 5
- Q. The consumption of fuel during idle run per hour is
A)25 Lts
B)15 Lts
C)20 Lts
D)None of these
Answer: 25 Lts
- Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
A)8
B)5
C)2
D)4
Answer: 2
- Q. The speed of Motor Trolly over points and crossings is
A)15 kmph
B)10 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. “C” class ODC is run with the permission of ________.
A)Head Quarter
B)DOM
C)CRS
D)None of these
Answer: CRS
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. Which of the following faunal species found in India are invasive species? 1)Railway Creeper 2)Lantana 3)Black wattle Select the correct option from the codes given below:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
A)No light
B)White
C)Red
D)None of these
Answer: Red
- Q. Where was the B.B.C.I locomotive started?
A)Boriville
B)Jamalpur
C)Parel
D)Hyderabad
Answer: Parel
- Q. The headquarters of North – Eastern railway is situated at
A)Gorakhpur
B)Mumbai (CST)
C)Guwahati
D)New Delhi
Answer: Gorakhpur
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State