Q. Which of the following zones administers the Matheran Hill Railway?

Correct Answer

Central Railways

More Questions on Indian Railway

  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. When did the first ignition engine develop?
    A)1900
    B)1890
    C)1892
    D)1904
    Answer: 1892
  • Q. What is the length of North-Eastern Frontier Railway (NFR)?
    A)4290 km
    B)4300 km
    C)3700 km
    D)5298 km
    Answer: 3700 km
  • Q. Maximum speed of trains during day in case of OHE failure is ________
    A)65 km
    B)108 km
    C)70 km
    D)60 km
    Answer: 60 km
  • Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1 & 2
    C)Only 1, 2 & 3
    D)1, 2, 3 & 4
    Answer: Only 1, 2 & 4
  • Q. The length of long welded rail under Indian conditions should be about
    A)0.50 km
    B)1 km
    C)2 km
    D)None of these
    Answer: 1 km
  • Q. Through which of the following group of states does the Konkan Railways run?
    A)Maharashtra - Karnataka - Kerala - Tamil Nadu
    B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
    C)Maharashtra - Karnataka - Goa
    D)Karnataka - Goa - Kerala - Tamil Nadu
    Answer: Maharashtra - Karnataka - Goa
  • Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
    A)Block instrument
    B)Signal over lap
    C)Over lap
    D)None of these
    Answer: Signal over lap
  • Q. Used for A self propelled vehicle repairs in OHE is
    A)Moped Trolley
    B)Tower wagon
    C)Ladder Trolley
    D)None of these
    Answer: Tower wagon
  • Q. Who is the current director general of Railway Protection Force (RPF)?
    A)Dharmendra Kumar
    B)Brij Mohanty
    C)S H Prakash
    D)Arun Kumar
    Answer: Arun Kumar
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. BSLB determines the limits of block section and ________ .
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
    A)600
    B)500
    C)400
    D)800
    Answer: 600
  • Q. Adequate distance means the distance sufficient to ensure ________.
    A)Station Limit
    B)Safety
    C)Non-Safety
    D)None of these
    Answer: Safety
  • Q. At the enroute, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
    A)01 long
    B)03 long
    C)02 long
    D)None of these
    Answer: 03 long
  • Q. During shunting, outer, home and ________ signals are not taken off.
    A)Both
    B)Last stop signal
    C)First stop signal
    D)None of these
    Answer: First stop signal
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 1