Q. Which of the following zones administers the Matheran Hill Railway?

Correct Answer

Central Railways

More Questions on Indian Railway

  • Q. Second train during TSL will be dispatched after ________.
    A)Both
    B)Line clear
    C)Without line clear
    D)None of these
    Answer: Line clear
  • Q. Block overlap in multiple aspect signalling system is ________ meters.
    A)180
    B)200
    C)300
    D)208
    Answer: 180
  • Q. What is the maximum speed over facing point in non-interlocked station?
    A)15 kmph
    B)50 kmph
    C)75 kmph
    D)25 kmph
    Answer: 15 kmph
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
    A)South Western Railway
    B)North Eastern Railway
    C)South Central Railway
    D)North Central Railway
    Answer: South Central Railway
  • Q. Maximum speed of tower wagon is ________ km/h.
    A)40
    B)25
    C)20
    D)50
    Answer: 40
  • Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: Normal
  • Q. At which place the detonators shall be placed during thick & foggy weather on The Absolute block section?
    A)180-10 Meters from outermost signal
    B)270-10 Meters from outermost signal
    C)270-10 Meters from First stop signal
    D)No need to place detonators
    Answer: 270-10 Meters from First stop signal
  • Q. Block section limit board provided at station?
    A)B class Single line TA
    B)B class Single line MAUQ
    C)B class Double line TA
    D)B class Double line MA
    Answer: B class Double line MA
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes
  • Q. In case of accident, siren is repeated at an interval of ________ minutes.
    A)20
    B)10
    C)15
    D)5
    Answer: 5
  • Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
    A)Guwahati
    B)Kochi
    C)Chennai
    D)New Delhi
    Answer: New Delhi
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. When a Goods train is working without guard or BV or Guard and BV the speed is
    A)10
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
    A)9
    B)10
    C)3
    D)4
    Answer: 10
  • Q. What will be the speed of second train running on T/C 602?
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
    A)25
    B)75
    C)15
    D)30
    Answer: 15

Leave a Comment