More Questions on Indian Railway
- Q. Second train during TSL will be dispatched after ________.
A)Both
B)Line clear
C)Without line clear
D)None of these
Answer: Line clear
- Q. Block overlap in multiple aspect signalling system is ________ meters.
A)180
B)200
C)300
D)208
Answer: 180
- Q. What is the maximum speed over facing point in non-interlocked station?
A)15 kmph
B)50 kmph
C)75 kmph
D)25 kmph
Answer: 15 kmph
- Q. Departmental enquiry must be ordered by ________.
A)DRM
B)Sr. DPO
C)COM
D)Sr. DOM
Answer: DRM
- Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
A)Sectional
B)Corner
C)Warner
D)None of these
Answer: Warner
- Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
A)South Western Railway
B)North Eastern Railway
C)South Central Railway
D)North Central Railway
Answer: South Central Railway
- Q. Maximum speed of tower wagon is ________ km/h.
A)40
B)25
C)20
D)50
Answer: 40
- Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: Normal
- Q. At which place the detonators shall be placed during thick & foggy weather on The Absolute block section?
A)180-10 Meters from outermost signal
B)270-10 Meters from outermost signal
C)270-10 Meters from First stop signal
D)No need to place detonators
Answer: 270-10 Meters from First stop signal
- Q. Block section limit board provided at station?
A)B class Single line TA
B)B class Single line MAUQ
C)B class Double line TA
D)B class Double line MA
Answer: B class Double line MA
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. In case of accident, siren is repeated at an interval of ________ minutes.
A)20
B)10
C)15
D)5
Answer: 5
- Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
A)Guwahati
B)Kochi
C)Chennai
D)New Delhi
Answer: New Delhi
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Tower wagon shall run as per the rules of working of ________.
A)Passengers
B)Wagon
C)Train
D)None of these
Answer: Train
- Q. For Temporary diversions, the permission must be obtained from
A)CE
B)CRS
C)Railway Board
D)None of these
Answer: Railway Board
- Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10
B)25
C)20
D)None of these
Answer: 25
- Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. What will be the speed of second train running on T/C 602?
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: Normal speed
- Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
A)25
B)75
C)15
D)30
Answer: 15