- Q. The consumption of fuel during idle run per hour is
A)25 Lts
B)15 Lts
C)20 Lts
D)None of these
Answer: 25 Lts
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. How many officers may be attached with light engine?
A)1
B)2
C)3
D)None of these
Answer: 3
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
A)3
B)5
C)2
D)4
Answer: 5
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
A)150 meters
B)200 meters
C)180 meters
D)None of these
Answer: 150 meters
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. W/L board will be provided at not less than ________ metres from the gate.
A)600
B)400
C)500
D)800
Answer: 600
- Q. The headquarters of South – Central Railways is situated at
A)Secunderabad
B)Mumbai (CST)
C)Chennai
D)Mumbai (Central)
Answer: Secunderabad
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. Launched three Trains to improve Quality of Travel (for reserved passengers), these are:
A)Dirubhargh, Sahayak and Humsafar
B)Humsafar, Tejas and Uday
C)Tejas, Antyodaya and Gatiman
D)Sahayak,Antyodaya and Gatiman
Answer: Humsafar, Tejas and Uday
- Q. In one train only system, information of lost of metal token is given to ________.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
A)Both
B)UP
C)Falling
D)None of these
Answer: UP
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. At the starting station, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. For extinguished home signal, Loco Pilot will be issued ________ authority form the station in rear in MACLS system.
A)16
B)20
C)12
D)10
Answer: 16
- Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
A)RailSilver
B)RailSagar
C)RailCloud
D)RailBharat
Answer: RailCloud
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State