Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?

Correct Answer

Distant, Home

More Questions on Indian Railway

  • Q. In which Governor – General’s reign railway lines in India were established?
    A)Lord Kenning
    B)Lord William Bentick
    C)Lord Cornwallis
    D)Lord Dalhousie
    Answer: Lord Dalhousie
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Indian Railway Act means ________.
    A)Part 23 of 1989
    B)Part 22 of 1989
    C)Part 24 of 1989
    D)Part 21 of 1989
    Answer: Part 24 of 1989
  • Q. What is the massage of 000 (three short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control
    D)Unable to proceed
    Answer: Train out of control
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. What is the length of North – Eastern Frontier Railway (NEFR)?
    A)4290 km
    B)4300 Km
    C)3700 Km
    D)5298 km
    Answer: 3700 Km
  • Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
    A)Authority
    B)Private Number
    C)Cuation Number
    D)None of these
    Answer: Private Number
  • Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. Yearly goods stock census is taken on ________.
    A)30st November
    B)31st December
    C)31st October
    D)31st March
    Answer: 30st November
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
    A)5
    B)4
    C)2
    D)8
    Answer: 5
  • Q. ________ tail board will be used is EMU train.
    A)Turn Over & Turn Flow
    B)Turnover
    C)Turn Flow
    D)None of these
    Answer: Turnover
  • Q. The turning out time off BD SPL. During day is ________ minutes
    A)50
    B)30
    C)20
    D)None of these
    Answer: 30
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. How many officers may be attached with light engine?
    A)1
    B)2
    C)3
    D)None of these
    Answer: 3
  • Q. Distant signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Permissive
  • Q. Slip siding protects
    A)Station section
    B)Station limit
    C)Block section
    D)None of these
    Answer: Block section
  • Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
    A)8
    B)5
    C)2
    D)4
    Answer: 2
  • Q. When did the first ignition engine develop?
    A)1900
    B)1890
    C)1892
    D)1904
    Answer: 1892

Leave a Comment