More Questions on Indian Railway
- Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
A)Both
B)Lowest
C)Highest
D)None of these
Answer: Highest
- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below:
A)1, 2, 3, 4 & 5
B)Only 2, 3 & 4
C)Only 2, 3, 4, 5
D)Only 2, 3 & 5
Answer: 1, 2, 3, 4 & 5
- Q. Fly shunting will take place in
A)Flat Yard
B)Hump Yard
C)Gravity Yard
D)None of these
Answer: Hump Yard
- Q. Block back are used at?
A)Single/Double line both
B)On Single line
C)On Double line
D)None of these
Answer: Single/Double line both
- Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
A)Shunt
B)Repeating
C)Call-on
D)None of these
Answer: Repeating
- Q. Who invented the railway engine?
A)James Watt
B)Charles Babbage
C)Isaac Newton
D)George Stephenson
Answer: George Stephenson
- Q. A material train may be divided outside station limit during emergency under the supervision of ________.
A)Driver
B)Guard
C)PWI
D)None of these
Answer: PWI
- Q. Sand hump is a substitute to ________ and also a means of isolation.
A)Over signal
B)Signal
C)Signal overlap
D)None of these
Answer: Signal overlap
- Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
A)--0
B)0-0
C)-0-
D)---
Answer: 0-0
- Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore
B)Chittranjan
C)Kapurthala
D)Perambur
Answer: Bangalore
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
A)25
B)75
C)15
D)30
Answer: 15
- Q. Who is the current director general of Railway Protection Force (RPF)?
A)Dharmendra Kumar
B)Brij Mohanty
C)S H Prakash
D)Arun Kumar
Answer: Arun Kumar
- Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
A)15
B)10
C)20
D)40
Answer: 15
- Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
A)ALP
B)Driver
C)Guard
D)None of these
Answer: Guard
- Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
A)8
B)10
C)6
D)None of these
Answer: 6
- Q. Adequate distance mentioned in the automatic block system is ________ meters.
A)105
B)110
C)120
D)115
Answer: 120
- Q. During serious accident, ________ will be the in-charge of control office.
A)Sr. DOM
B)DOM
C)AOM
D)None of these
Answer: Sr. DOM