- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. Impact speed of shunting of one box wagon is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 5
- Q. Yearly goods stock census is taken on ________.
A)30st November
B)31st December
C)31st October
D)31st March
Answer: 30st November
- Q. Competency certificate of the gateman of interlocked engineering gate is signed by
A)Both
B)SSE/P.way
C)SSE/Sig.
D)None of these
Answer: Both
- Q. When was the nationalization of Indian Railways done?
A)1951
B)1952
C)1950
D)1954
Answer: 1950
- Q. Depot in-charge is responsible to test the detonators once in ________.
A)Year
B)Monthly
C)Weekly
D)None of these
Answer: Year
- Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
A)ST 1-260
B)ST 1-400
C)1-400 or sleeper
D)None of these
Answer: 1-400 or sleeper
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: 2 Only
- Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
A)15:30
B)14:30
C)12:30
D)13:30
Answer: 13:30
- Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
A)300/400
B)500/600
C)400/500
D)None of these
Answer: 500/600
- Q. No. of vehicles that can be attached to goods trains in rear of BV is
A)2 bogie or its equivalent
B)2 bogies
C)1 bogies
D)None of these
Answer: 2 bogie or its equivalent
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
A)New Delhi and Kanyakumari
B)Ernakulam and Howrah
C)Sriganganagar and Tiruchirapalli
D)Nizamuddin and Palakkad
Answer: Ernakulam and Howrah
- Q. Medical relief van shall be dispatched within ________ minutes from double exit siding.
A)15
B)10
C)20
D)25
Answer: 15
- Q. In which of the following cities are located 3 zonal headquarters of Indian Railways?
A)New Delhi
B)Guwahati
C)Mumbai
D)Kolkata
Answer: Kolkata
- Q. India’s first rail auto hub will be located in:
A)Delhi
B)Kolkata
C)Chennai
D)New Delhi
Answer: Chennai
- Q. New freight corridors announced at ________
A)Kharagpur - Vijayawada
B)Delhi - Chennai
C)Kharagpur - Mumbai
D)Gujarat - Agra
Answer: Gujarat - Agra