Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?

Correct Answer

Defective signal

More Questions on Indian Railway

  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. The first locomotive which was manufactured in Chittaranjan on
    A)Sep - 1949
    B)Nov - 1950
    C)Oct - 1950
    D)Oct - 1954
    Answer: Nov - 1950
  • Q. ________ must be issued during thick or foggy weather.
    A)Reminder Caution Order
    B)Caution Order
    C)Nil Caution Order
    D)Minimum Caution Order
    Answer: Caution Order
  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. Train is to be passed through loop line.
    A)30 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
    A)Both
    B)PN
    C)Non-PN
    D)None of these
    Answer: PN
  • Q. What will be the maximum speed of B-Class ODC in Broad guage?
    A)40 kmph
    B)15 kmph
    C)25 kmph
    D)75 kmph
    Answer: 40 kmph
  • Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
    A)Hand
    B)Outer
    C)Call-On
    D)Non eof these
    Answer: Outer
  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
    A)15
    B)10
    C)5
    D)20
    Answer: 20
  • Q. Where is the Indian Railways Institute of Mechanical and Electrical Engineering institute situated?
    A)Jamalpur
    B)Nasik
    C)Baroda
    D)Pune
    Answer: Jamalpur
  • Q. Competency certificate of the gateman of interlocked engineering gate is signed by
    A)Both
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: Both
  • Q. The headquarters of North – Eastern railway is situated at
    A)Gorakhpur
    B)Mumbai (CST)
    C)Guwahati
    D)New Delhi
    Answer: Gorakhpur
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
    A)Source of raw material and production centers
    B)Source of raw material and export centers
    C)Source of raw material and ports
    D)Source of raw material and markets
    Answer: Source of raw material and production centers
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Station limit is the portion between ________.
    A)Both
    B)Outermost signal
    C)Innermost signal
    D)None of these
    Answer: Outermost signal
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third