- Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
A)Rail Wheel Factory
B)Modern Coach Factory
C)Integral Coach Factory
D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. In case of train parting ________ bell code is given on block instrument.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-000
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
A)DOM
B)AOM(G)
C)AOM(Chg)
D)None of these
Answer: AOM(G)
- Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
A)T/369(B)
B)T/369(3b)
C)T/369(2b)
D)None of these
Answer: T/369(2b)
- Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
A)White light left and right
B)Green light up and down
C)Green light left and right
D)Green light without any movement
Answer: Green light left and right
- Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours
B)04 hours
C)08 hours
D)16 hours
Answer: 16 hours
- Q. Introduced ________ in Konkan Railway to help old and disabled passengers.
A)Divyang Express
B)Sahayak Express
C)Viklang Seva Express
D)Sarathi Seva
Answer: Sarathi Seva
- Q. A platform surrounded by rail lines from all the four sides, is called
A)Island platform
B)Dock platform
C)Passenger platform
D)Goods platform
Answer: Island platform
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25
B)20
C)15
D)30
Answer: 25
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. Where was the B.B.C.I locomotive started?
A)Boriville
B)Jamalpur
C)Parel
D)Hyderabad
Answer: Parel
- Q. Which is the shortest station name in Indian Railways?
A)Goa
B)Pune
C)Bc
D)Ib
Answer: Ib
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section
B)Station diary
C)Diary
D)None of these
Answer: Station diary
- Q. Departmental enquiry must be ordered by ________.
A)DRM
B)Sr. DPO
C)COM
D)Sr. DOM
Answer: DRM