More Questions on Indian Railway
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. Maximum number of explosive unit wagons in a mixed train is
A)3
B)5
C)7
D)None of these
Answer: 3
- Q. passing through station during day when running without brakevan and tail board.
A)25 kmph
B)10 kmph
C)20 kmph
D)Normal speed
Answer: 20 kmph
- Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
A)Walkie-Talkie
B)Walkie
C)VHF
D)None of these
Answer: Walkie-Talkie
- Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4
B)ACC2
C)ACC3
D)None of these
Answer: ACC4
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. Impact speed of shunting of one box wagon is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 5
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. In automatic block area SL. The LSS shall not be taken of unless the line is clear upto
A)Automatic stop signal+180 Meters
B)next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: next automatic stop signal
- Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
A)45 meters beyond the obstruction
B)At 1st facing point of station
C)Facing point of concern line
D)No need
Answer: 45 meters beyond the obstruction
- Q. When was the nationalization of Indian Railways done?
A)1951
B)1952
C)1950
D)1954
Answer: 1950
- Q. Maximum speed of tower wagon is ________ km/h.
A)40
B)25
C)20
D)50
Answer: 40
- Q. Isolation shall be provided at an interlocked station when the speed is
A)Above 50 kmph
B)50 kmph
C)75 kmph
D)None of these
Answer: Above 50 kmph
- Q. Hand shunting is performed at speed not exceeding
A)05 kmph
B)10 kmph
C)08 kmph
D)None of these
Answer: 05 kmph
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. Your train is first during TSL on double line.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 25 kmph
- Q. When was the Jammu City appeared on the map of Indian Railway?
A)1967
B)1956
C)1963
D)1965
Answer: 1965
- Q. Normally material train will work during ________.
A)Both
B)Day
C)Night
D)None of these
Answer: Day