More Questions on Indian Railway
- Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
A)15:30
B)14:30
C)12:30
D)13:30
Answer: 13:30
- Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on
B)Shunt signal
C)Private No.
D)None of these
Answer: Private No.
- Q. Cotton in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. Competency certificate of the gateman of interlocked engineering gate is issued by
A)SSE/C & W
B)SSE/P.way
C)SSE/Sig.
D)None of these
Answer: SSE/P.way
- Q. Normally the train with hot axle is admitted on ________.
A)Main Line
B)Loop Line
C)Siding Line
D)None of these
Answer: Main Line
- Q. Sounding of 5 hooters means ________.
A)ART, MRV required at out station
B)ART
C)MRV
D)None of these
Answer: ART, MRV required at out station
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Q. In automatic block area SL. The LSS shall not be taken of unless the line is clear upto
A)Automatic stop signal+180 Meters
B)next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: next automatic stop signal
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
A)6.8
B)7.8
C)5.8
D)4.8
Answer: 4.8
- Q. Which of the gauges is used in the hilly areas?
A)Narrow gauge
B)Broad gauge
C)Meter gauge
D)Special gauge
Answer: Narrow gauge
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS
- Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
A)72
B)24
C)48
D)None of these
Answer: 72
- Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3
B)1 2 3 4
C)1 2 4 3
D)3 1 4 2
Answer: 4 2 1 3
- Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
A)Hand
B)Outer
C)Call-On
D)Non eof these
Answer: Outer
- Q. In which of the following cities are located 3 zonal headquarters of Indian Railways?
A)New Delhi
B)Guwahati
C)Mumbai
D)Kolkata
Answer: Kolkata
- Q. What is the maximum speed over facing point in non-interlocked station?
A)15 kmph
B)50 kmph
C)75 kmph
D)25 kmph
Answer: 15 kmph
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State