More Questions on Indian Railway
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Diesel locomotives are built in?
A)Perambur
B)Banglore
C)Varanasi
D)Hubli
Answer: Varanasi
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. On double line, when a running line is blocked by stabled load , the point to be set against are
A)Advance point
B)Either side points
C)Rear points
D)None of these
Answer: Rear points
- Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
A)T/A409
B)T/369(1)
C)T/409
D)No Need of any Authority
Answer: T/369(1)
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Q. Who of the following was the first Railway Minister of independent India?
A)Jawaharlal Nehru
B)John Mathai
C)Lal Bahadur Shastri
D)Shanmugham Shetty
Answer: John Mathai
- Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter
B)01 meter
C)02 meter
D)04 meter
Answer: 01 meter
- Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
A)Guwahati
B)Kochi
C)Chennai
D)New Delhi
Answer: New Delhi
- Q. Suburban Working time table is signed by ________ , COM and CPTM.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. Loss of Railway property of ________ is treated as serious accident.
A)75 Lakhs
B)More than 50 lakhs
C)01 crore
D)More than 02 crore
Answer: More than 02 crore
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
A)50 kmph
B)Booked
C)Sectional
D)None of these
Answer: Sectional
- Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours
B)04 hours
C)08 hours
D)16 hours
Answer: 16 hours
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph
- Q. When ISMD attached train is allowed to run through on PF line the speed must be
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Between which place station section is situated at double class B station, equipped with MACLS?
A)FP to LSS
B)Home signal to Ad starter
C)BSLB to Ad. Starter
D)A or B any one
Answer: BSLB to Ad. Starter
- Q. It is a Python Rake.
A)15 kmph
B)60 kmph
C)25 kmph
D)Normal speed
Answer: 60 kmph
- Q. Which of the gauges is used in the hilly areas?
A)Narrow gauge
B)Broad gauge
C)Meter gauge
D)Special gauge
Answer: Narrow gauge
- Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
A)Green
B)White
C)Red
D)NIL
Answer: NIL
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State