- Q. For Block Back form ________ To be issued on DL.
A)T/B-806+PN
B)T/806+PN
C)T/A806+PN
D)None of these
Answer: T/806+PN
- Q. Traffic gates are those located between ________.
A)First signal
B)Outermost stop signal
C)Stop signal
D)None of these
Answer: Outermost stop signal
- Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180
B)108
C)100M
D)200
Answer: 180
- Q. In one train only system, information of lost of metal token is given to ________.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
A)No light
B)White
C)Red
D)None of these
Answer: Red
- Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
A)40/15 kmph
B)60/30 kmph
C)35/20 kmph
D)Normal speed
Answer: 35/20 kmph
- Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85
B)60
C)75
D)90
Answer: 90
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. Each motor coach shall consist of ________ Traction motors.
A)4
B)2
C)3
D)5
Answer: 4
- Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
A)Stop his train and find the cause
B)Proceed further with same speed up to next station
C)Proceed further with normal speed
D)None of these
Answer: Stop his train and find the cause
- Q. In case of ACP Guard shall proceed towards the front from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Left
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. For disconnection of points S&T official must issue form ________
A)T/B 351
B)T/351
C)T/A 351
D)None of these
Answer: T/351
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. Colour of the semaphore distant signal is ________.
A)Yellow
B)Red
C)White
D)Green
Answer: Yellow
- Q. Suburban Working time table is signed by ________ , COM and CPTM.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
A)5
B)4
C)2
D)8
Answer: 5
- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. Departmental enquiry must be ordered by ________.
A)DRM
B)Sr. DPO
C)COM
D)Sr. DOM
Answer: DRM
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years