- Q. In the enroute, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. Yearly coaching stock census is taken on ________.
A)31st January
B)31st December
C)31st October
D)31st March
Answer: 31st October
- Q. Wagon with livestock shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. No. of vehicles that can be attached to goods trains in rear of BV is
A)2 bogie or its equivalent
B)2 bogies
C)1 bogies
D)None of these
Answer: 2 bogie or its equivalent
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
A)Chittranjan
B)Varanasi
C)Perambur
D)Patiala
Answer: Chittranjan
- Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. Minimum radius for curves in BG is
A)20°
B)16°
C)10°
D)None of these
Answer: 10°
- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. SLB determines the limits of Station section and ________
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35
B)15
C)20
D)10
Answer: 10
- Q. In which institution the training of electric work is being given?
A)Railway Staff College
B)Indian Railways Institute of Mechanical and Electrical Engineering
C)Indian Railways Institute of Electrical Engineering
D)Indian Railways Institute of Civil Engineering
Answer: Indian Railways Institute of Electrical Engineering
- Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)4
B)10
C)9
D)3
Answer: 10
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. When was the Jammu City appeared on the map of Indian Railway?
A)1967
B)1956
C)1963
D)1965
Answer: 1965
- Q. Hand shunting of vehicles in gradients ________ is totally prohibited
A)1 In 100 or steeper
B)1 in 400 or Steeper
C)1 in 200 or steeper
D)None of these
Answer: 1 in 400 or Steeper
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT