More Questions on Indian Railway
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
A)01 month
B)04 month
C)02 month
D)03 Months
Answer: 02 month
- Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
A)Central India Railway
B)Bombay Baroda Railway
C)The Scindia Railway
D)Great Indian Peninsula Railway
Answer: Great Indian Peninsula Railway
- Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: 10 kmph
- Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85
B)60
C)75
D)90
Answer: 90
- Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
A)Not more than two bogies or their equivalent
B)Two Bogies
C)04 four wheelers only
D)None of these
Answer: Not more than two bogies or their equivalent
- Q. Which is the longest station name in Indian Railways?
A)Kharagpur
B)Kanyakumari
C)Venkatanarasimharajuvaripeta
D)Chhatrapati Shivaji Terminus
Answer: Venkatanarasimharajuvaripeta
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. ISMD must be attached always
A)In the middle
B)Next to Engine
C)In rear
D)None of these
Answer: Next to Engine
- Q. Depot in-charge is responsible to test the detonators once in ________.
A)Year
B)Monthly
C)Weekly
D)None of these
Answer: Year
- Q. Booked speed is fixed by ________.
A)Sr. DOM
B)COM
C)CCM
D)None of these
Answer: COM
- Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
A)Hand
B)Outer
C)Call-On
D)Non eof these
Answer: Outer
- Q. Signal sighting committee consists of TI, SI/PWI and ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. At station which signal will be taken off for block line?
A)Shut
B)Repeating
C)Calling on
D)No Signal
Answer: No Signal
- Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
A)25
B)75
C)15
D)30
Answer: 15
- Q. When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.
A)10
B)5
C)7
D)None of these
Answer: 5
- Q. How many members did the railway board had?
A)4
B)3
C)5
D)8
Answer: 4
- Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
A)DOM
B)ADRM/Sr.DSO/DSO
C)Sr.DOM
D)None of these
Answer: ADRM/Sr.DSO/DSO
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State