More Questions on Indian Railway
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. In Material train, vehicles shall not be detached on gradient.
A)1-400
B)ST 1-260
C)1-100 or steeper
D)None of these
Answer: 1-100 or steeper
- Q. In which year Indian Railway was nationalized?
A)1952
B)1947
C)1951
D)1955
Answer: 1951
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. Approved special instructions are issued by ________.
A)PCOM
B)CRS
C)MT
D)None of these
Answer: CRS
- Q. To call the Guard to the driving cab, Motorman of EMU train will give ________ bell code.
A)0
B)0
C)0
D)0
Answer: 0
- Q. A platform surrounded by rail lines from all the four sides, is called
A)Island platform
B)Dock platform
C)Passenger platform
D)Goods platform
Answer: Island platform
- Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
A)ST 1-260
B)ST 1-400
C)1-400 or sleeper
D)None of these
Answer: 1-400 or sleeper
- Q. Station section available in which Class of Station?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: B-Class
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. Minimum depth of space for wheel flange from rail level in BG is
A)3"
B)2"
C)1 (1/2)"
D)None of these
Answer: 1 (1/2)"
- Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
A)T/C-912
B)T/B-912
C)T/D-912
D)None of these
Answer: T/D-912
- Q. What should be done by guard if train entering in block section without authority to proceed?
A)Protect the Train
B)Stop the Train
C)Inform to SM
D)All of above
Answer: All of above
- Q. What is shunting order number?
A)T-806
B)T-609
C)T/A-602
D)T-409
Answer: T-806
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. Which of the following is the largest railway junction in India?
A)Mathura
B)Delhi
C)Bhatinda
D)Allahabad
Answer: E
- Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
A)150 meters
B)200 meters
C)180 meters
D)None of these
Answer: 150 meters
- Q. Special instructions are issued by whom?
A)Authorized officer
B)CCM
C)CRS
D)None of these
Answer: Authorized officer
- Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph
B)140 kmph
C)160 kmph
D)15 kmph
Answer: 15 kmph