Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. How much block overlap is required at the station equipped with MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. ________ bogies can be attached in rear of SLR of Mail/Express train.
    A)2
    B)4
    C)3
    D)8
    Answer: 2
  • Q. The time limit for starting BD special during day is ________.
    A)30 meters
    B)20 meters
    C)15 meters
    D)40 meters
    Answer: 30 meters
  • Q. Motor Trolley permit is ________
    A)T/1625
    B)T/1425
    C)T/1525
    D)None of these
    Answer: T/1525
  • Q. “C” class ODC is run with the permission of ________.
    A)Head Quarter
    B)DOM
    C)CRS
    D)None of these
    Answer: CRS
  • Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
    A)Madhya Pradesh
    B)Tamil Nadu
    C)West Bengal
    D)Punjab
    Answer: West Bengal
  • Q. Where is the Research, Design and Standard Organisation situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. In which Governor – General’s reign railway lines in India were established?
    A)Lord Kenning
    B)Lord William Bentick
    C)Lord Cornwallis
    D)Lord Dalhousie
    Answer: Lord Dalhousie
  • Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
    A)Block sectiond
    B)Next whole block section
    C)Back whole block section
    D)None of these
    Answer: Next whole block section
  • Q. For Block Back form ________ To be issued on DL.
    A)T/B-806+PN
    B)T/806+PN
    C)T/A806+PN
    D)None of these
    Answer: T/806+PN
  • Q. The turning out time off BD SPL. During day is ________ minutes
    A)50
    B)30
    C)20
    D)None of these
    Answer: 30
  • Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
    A)01 month
    B)04 month
    C)02 month
    D)03 Months
    Answer: 02 month
  • Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
    A)50
    B)50
    C)40
    D)60
    Answer: 60
  • Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
    A)8
    B)10
    C)6
    D)None of these
    Answer: 6
  • Q. The banner flag is a ________
    A)Both of these
    B)Temporary stop signal
    C)Permanent stop signal
    D)None of these
    Answer: Temporary stop signal
  • Q. Which is the longest station name in Indian Railways?
    A)Kharagpur
    B)Kanyakumari
    C)Venkatanarasimharajuvaripeta
    D)Chhatrapati Shivaji Terminus
    Answer: Venkatanarasimharajuvaripeta
  • Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)45
    C)30
    D)35
    Answer: 45
  • Q. DRM nominates ________ for each section to issue caution orders to train crew.
    A)Nil notice
    B)Caution notice station
    C)Notice
    D)None of these
    Answer: Caution notice station
  • Q. “Act” means the Railway Act is ________.
    A)1989 (22 of 1989)
    B)1989 (24 of 1989)
    C)1989 (23 of 1989)
    D)None of these
    Answer: 1989 (24 of 1989)