Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A
Both
B
Red Light
C
Green Light
D
None of these
Correct Answer
Red Light
More Questions on Indian Railway
Q. How many minimum BP pressure is require in engine to charge Goods train?
A)5.8 kg/cm2
D. 5.00 kg/cm2 B)4.8 kg/cm2
B. 6.00 kg/cm2
C. 5.8 kg/cm2
D. 5.00 kg/cm2 C)6.00 kg/cm2
C. 5.8 kg/cm2
D. 5.00 kg/cm2 D)5.00 kg/cm2
Answer: 5.00 kg/cm2
Q. Material train is a ________ train.
A)Both B)Departmental C)Permanent D)None of these
Answer: Departmental
Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
A)Gujarat B)Kerala C)Tamil Nadu D)Andhra Pradesh
Answer: Kerala
Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
A)6 hours B)12 hours C)8 hours D)2 Hours
Answer: 8 hours
Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
A)T/369(4b) B)T/369(3b) C)T/369(2B) D)T/369(5b)
Answer: T/369(3b)
Q. Which of the gauges is used in the hilly areas?
Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
A)20 B)25 C)15 D)None of these
Answer: 25
Q. Percentage of in operative cylinders that can be attached in goods train is
A)5% B)15% C)10% D)None of these
Answer: 15%
Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
A)10 kmph B)25 kmph C)15 kmph D)None of these
Answer: 25 kmph
Q. The speed of Motor Trolly over points and crossings is
A)15 kmph B)10 kmph C)8 kmph D)None of these
Answer: 15 kmph
Q. When was the Central Railway established?
A)14th April 1951 B)5th Nov 1951 C)14th Nov 1951 D)16th August, 1951
Answer: 5th Nov 1951
Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: 2 Only
Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow B)RED C)Green D)None of these
Answer: RED
Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal B)First stop signal C)Last Stop signal D)None of these
Answer: Last Stop signal
Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph B)10 kmph C)15 kmph D)None of these
Answer: 15 kmph
Q. To attach the 12 coach EMU rake, ________ units are to be attached.
A)8 B)5 C)6 D)4
Answer: 4
Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third B)First C)Second D)Fourth
Answer: Second
Q. What is the maximum speed over facing point in non-interlocked station?
A)15 kmph B)50 kmph C)75 kmph D)25 kmph
Answer: 15 kmph
Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph B)25 kmph C)20 kmph D)None of these
Answer: 20 kmph
Q. The number of Train examination report is ________.