Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day
  • Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
    A)T/C-912
    B)T/B-912
    C)T/D-912
    D)None of these
    Answer: T/D-912
  • Q. Shatabdi Express train was started in ________.
    A)1990
    B)1984
    C)1988
    D)1985
    Answer: 1988
  • Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
    A)20 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B
  • Q. Which Zone is the largest in Indian Railways?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Eastern Railway
  • Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
    A)10
    B)20
    C)30
    D)None of these
    Answer: 10
  • Q. For Block Back form ________ To be issued on DL.
    A)T/B-806+PN
    B)T/806+PN
    C)T/A806+PN
    D)None of these
    Answer: T/806+PN
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. The world’s highest railway bridge will come up over which Indian River?
    A)Ganga
    B)Narmada
    C)Godavari
    D)Chenab
    Answer: Chenab
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
    A)25 kmph
    B)30 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Which is the shortest station name in Indian Railways?
    A)Goa
    B)Pune
    C)Bc
    D)Ib
    Answer: Ib
  • Q. Permission of ________ is required to work the material train in the night.
    A)DRM
    B)AOM
    C)DOM
    D)None of these
    Answer: DRM
  • Q. ________ bogies can be attached in rear of SLR of Mail/Express train.
    A)2
    B)4
    C)3
    D)8
    Answer: 2
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. If the points are set for main line, point indicator gives ________ light in the night.
    A)Yellow
    B)red
    C)Green
    D)White
    Answer: White

Leave a Comment