Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter B)Home, Starter C)Distance Home Starter D)None of these
Answer: Home, Starter
Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
A)C & W B)Engineering C)Mechanical D)None of these
Answer: Mechanical
Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph B)2 kmph C)2.5 kmph D)3.5 kmph
Answer: 2.5 kmph
Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: 2 Only
Q. Speed of the following tower wagon is ________ km/h.
A)9 B)10 C)8 D)4
Answer: 8
Q. When ISMD attached train is allowed to run through on PF line the speed must be
A)10 kmph B)5 kmph C)8 kmph D)None of these
Answer: 5 kmph
Q. For Temporary diversions, the permission must be obtained from