Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 2
  • Q. How many institutions do give suggestions for railways technology?
    A)Three
    B)One
    C)Two
    D)Four
    Answer: Two
  • Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
    A)Single white
    B)Yellow
    C)Two White parallel
    D)No light
    Answer: No light
  • Q. Goods warning board will be provided from FSS in BG at
    A)560 meters
    B)1400 meters
    C)1000 meters
    D)None of these
    Answer: 1400 meters
  • Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
    A)Maharashtra
    B)Tamil Nadu
    C)Himachal Pradesh
    D)Meghalaya
    Answer: Maharashtra
  • Q. Impact speed of shunting of one box wagon is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 5
  • Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
    A)80
    B)70
    C)75
    D)85
    Answer: 75
  • Q. During shunting, outer, home and ________ signals are not taken off.
    A)Both
    B)Last stop signal
    C)First stop signal
    D)None of these
    Answer: First stop signal
  • Q. Standard time is set at all station every day ________ Hours
    A)16
    B)10
    C)15
    D)None of these
    Answer: 16
  • Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
    A)No light
    B)White
    C)Red
    D)None of these
    Answer: Red
  • Q. As per the recent survey conducted by the Quality Council of India, which railway stations have been named as the cleanest and dirtiest railway stations in India?
    A)Indore and Visakhapatnam
    B)Darbhanga and Allahabad
    C)Allahabad and Indore
    D)Visakhapatnam and Darbhanga
    Answer: Visakhapatnam and Darbhanga
  • Q. Which of the following is the easternmost division of the Indian Railways?
    A)Rangiya
    B)Tinsukia
    C)Lumding
    D)Katihar
    Answer: Tinsukia
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A
  • Q. At what time the first train in Indian (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
    A)400 meters
    B)270 meters
    C)90 meters
    D)None of these
    Answer: 90 meters
  • Q. ________ must be issued during thick or foggy weather.
    A)Reminder Caution Order
    B)Caution Order
    C)Nil Caution Order
    D)Minimum Caution Order
    Answer: Caution Order
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. At which of the following places Diesel Component Works is established?
    A)Perambur
    B)Jamshedpur
    C)Patiala
    D)Varanasi
    Answer: Patiala
  • Q. During failure of signals and communications in DL automatic area the authority to proceed is
    A)T/B 912
    B)T/D 912
    C)T/A 912
    D)None of these
    Answer: T/B 912

Leave a Comment