Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. Which whistle code shall be used by loco pilot while Approach on W board.
    A)Three short
    B)Long continue
    C)Intermittent
    D)Three long
    Answer: Intermittent
  • Q. What is the maximum speed of a goods train pushed backed from block section ?
    A)15/8 kmph
    B)15 kmph
    C)8 kmph
    D)None of these
    Answer: 8 kmph
  • Q. The length of sand hump is about ________ feet.
    A)170
    B)150
    C)120
    D)170
    Answer: 170
  • Q. Warning boards for neutral section shall be fixed at a distance of
    A)300 and 600 meters
    B)400 and 600 meters
    C)500 and 250 meters
    D)None of these
    Answer: 500 and 250 meters
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day
  • Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
    A)200 meters
    B)100 meters
    C)150 meters
    D)None of these
    Answer: 100 meters
  • Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
    A)40/15 kmph
    B)60/30 kmph
    C)35/20 kmph
    D)Normal speed
    Answer: 35/20 kmph
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. Staff of ________ department shall protect the material train while working in block section.
    A)Engineering
    B)Operation
    C)C & W
    D)None of these
    Answer: Engineering
  • Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
    A)10 kmph
    B)25 kmph
    C)15 kmph
    D)None of these
    Answer: 25 kmph
  • Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
    A)Shunt signal
    B)Calling-on Signal
    C)Home Signal
    D)None of these
    Answer: Home Signal
  • Q. The additional Hours in the case of Gate man C saloon attendant, care takers will be ________
    A)24 Hours
    B)12 Hours
    C)08 Hours
    D)16 Hours
    Answer: 24 Hours
  • Q. When was the Jammu City appeared on the map of Indian Railway?
    A)1967
    B)1956
    C)1963
    D)1965
    Answer: 1965
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
    A)Gujarat
    B)Kerala
    C)Tamil Nadu
    D)Andhra Pradesh
    Answer: Kerala
  • Q. Calling on signal shows ________ light in off position in two aspect signalling system.
    A)Green
    B)White
    C)RED
    D)Yellow
    Answer: Yellow
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. In how many zones Indian Railway has been divided?
    A)17
    B)14
    C)16
    D)20
    Answer: 17
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board

Leave a Comment