Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. Signals are treated as ________ if connected points become defective.
    A)Both
    B)Defective
    C)Restricted
    D)None of these
    Answer: Defective
  • Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
    A)Central India Railway
    B)Bombay Baroda Railway
    C)The Scindia Railway
    D)Great Indian Peninsula Railway
    Answer: Great Indian Peninsula Railway
  • Q. How many dead engine can be attached in a goods train?
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. While pushing back, train shall be stopped at ________ stop signal.
    A)Slip
    B)Outermost
    C)Rear most
    D)None of these
    Answer: Outermost
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. At which of the following places Diesel Component Works is established?
    A)Perambur
    B)Jamshedpur
    C)Patiala
    D)Varanasi
    Answer: Patiala
  • Q. Maximum of ________ cranes can be attached in a passenger train.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. There is insufficient vacuum/pressure in engine.
    A)_____00
    B)___0___
    C)0___0
    D)00-----
    Answer: 00-----
  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Calling on signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Subsidiary
  • Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
    A)Uttar Pradesh
    B)Odisha
    C)West Bengal
    D)Chhattisgarh
    Answer: Uttar Pradesh
  • Q. Distance between two automatic signals is called as ________.
    A)Signalling Section
    B)Block section
    C)Mid Section
    D)None of these
    Answer: Signalling Section
  • Q. For extinguished home signal, Loco Pilot will be issued ________ authority form the station in rear in MACLS system.
    A)16
    B)20
    C)12
    D)10
    Answer: 16
  • Q. Elphinstone Road suburban railway station which was recently renamed as Prabhadevi is situated in?
    A)Tamil Nadu
    B)Mumbai
    C)Bengaluru
    D)New Delhi
    Answer: Mumbai
  • Q. What will be the prescribed form for DMT Block?
    A)E/223
    B)T/409
    C)T/806
    D)E/233
    Answer: E/223
  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
    A)540
    B)900
    C)580
    D)570
    Answer: 580