Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. Which state to have India’s first privately – run railway station?
    A)Kerala
    B)Tripura
    C)Odisha
    D)Madhya Pradesh
    Answer: Madhya Pradesh
  • Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
    A)20 days
    B)10 days
    C)15 days
    D)None of these
    Answer: 15 days
  • Q. Calling on signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Subsidiary
  • Q. Who has been appointed as the new Chairman of Railway Board?
    A)P S Thakur
    B)V K Yadav
    C)A K Mittal
    D)Neelmani Reddy
    Answer: V K Yadav
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. Which state has the longest route (in kilometers) of railway line in India?
    A)Rajasthan
    B)Maharashtra
    C)Andhra Pradesh
    D)Uttar Pradesh
    Answer: Uttar Pradesh
  • Q. What will be distance between fire affected train and rest of the train ?
    A)50 meters
    B)25 meters
    C)45 meters
    D)100 meters
    Answer: 45 meters
  • Q. The length of long welded rail under Indian conditions should be about
    A)0.50 km
    B)1 km
    C)2 km
    D)None of these
    Answer: 1 km
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
    A)2
    B)1.5
    C)1
    D)None of these
    Answer: 1.5
  • Q. What will be the maximum speed of a train hauling by Diesel engine when water level is 70mm above from rail level in broad guage line?
    A)5 km
    B)25 km
    C)15 km
    D)Stop Train
    Answer: 5 km
  • Q. Maximum speed of tower wagon is ________ km/h.
    A)40
    B)25
    C)20
    D)50
    Answer: 40
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Normally maximum gradient in station yards in BG is (at present)
    A)1 in 1000
    B)1 in 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400
  • Q. The headquarters of South – Central Railways is situated at
    A)Secunderabad
    B)Mumbai (CST)
    C)Chennai
    D)Mumbai (Central)
    Answer: Secunderabad
  • Q. Continuity test is to be done.
    A)_____00
    B)0
    C)0
    D)00------
    Answer: 00------
  • Q. How many stations to be redeveloped through PPP?
    A)350
    B)100
    C)200
    D)600
    Answer: 600
  • Q. Consider the following statements about Operating Ratio in Indian Railways: 1)The higher the operating ratio of Indian Railways the better is the condition of Indian Railways. 2)Operating ratio of Indian Railways is high on account of social service obligation imposed in Budget. Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only