More Questions on Indian Railway
- Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
A)15 kmph
B)8 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Semi-automatic signal is identified by ________.
A)Illuminated a marker
B)Marker
C)Semi marker
D)None of these
Answer: Illuminated a marker
- Q. 400 meters beyond the home signal of a C’ class station is called as ________.
A)Last stop signal
B)Block section
C)Overlapping block section
D)None of these
Answer: Overlapping block section
- Q. Validity of the competency certificate of the gateman is for ________ years.
A)9
B)10
C)3
D)4
Answer: 3
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. The passenger bogies of the Indian Railways are manufactured at which of the following places?
A)Perambur
B)Kapurthala
C)Chittranjan
D)Bangalore
Answer: Perambur
- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
A)43
B)41
C)42
D)45
Answer: 45
- Q. Colour of the semaphore repeating signal is ________.
A)Yellow
B)Red
C)White
D)Green
Answer: Yellow
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
A)Rail Wheel Factory
B)Modern Coach Factory
C)Integral Coach Factory
D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph
B)2 kmph
C)2.5 kmph
D)3.5 kmph
Answer: 2.5 kmph
- Q. Station limit is the portion between ________.
A)Both
B)Outermost signal
C)Innermost signal
D)None of these
Answer: Outermost signal
- Q. The first – ever Indian Railways Human Resources Round Table Conference has started in which city?
A)Pune
B)New Delhi
C)Chennai
D)Kochi
Answer: New Delhi
- Q. Suburban Working time table is signed by ________ , COM and CPTM.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. Intermediate Block home will be provided only on ________ Line.
A)Triple
B)Single
C)Double
D)None of these
Answer: Single
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State