Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.

Correct Answer

Red Light

More Questions on Indian Railway

  • Q. What is the position of the Indian Railway in the world according to the length of rail lines?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Fourth
  • Q. Speed of following tower wagon in the block section is ________ km/h.
    A)8
    B)5
    C)2
    D)4
    Answer: 8
  • Q. Goods train without brake van shall not be run during ________.
    A)CCF
    B)BCF
    C)ACF
    D)None of these
    Answer: ACF
  • Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
    A)400 meters
    B)270 meters
    C)90 meters
    D)None of these
    Answer: 90 meters
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. What is the speed of A class ODC in BG?
    A)40 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. The wagon containing ISMD load shall be attached.
    A)In Middle
    B)In rear
    C)Next to Engine
    D)None of these
    Answer: Next to Engine
  • Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
    A)T/A-912
    B)T/B-912
    C)T/C-912
    D)None of these
    Answer: T/B-912
  • Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
    A)2
    B)1.5
    C)1
    D)None of these
    Answer: 1.5
  • Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
    A)Warner, Home
    B)Outer, Home
    C)Distant, Home
    D)Distant, Home, Starter
    Answer: Distant, Home
  • Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
    A)4
    B)2
    C)3
    D)6
    Answer: 2
  • Q. What will be the prescribed form for DMT Block?
    A)E/223
    B)T/409
    C)T/806
    D)E/233
    Answer: E/223
  • Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
    A)80 mm
    B)60 mm
    C)70 mm
    D)50 mm
    Answer: 50 mm
  • Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
    A)Both 1 & 2
    B)Only 1
    C)Only 2
    D)Neither 1 nor 2
    Answer: Only 2
  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
    A)Block sectiond
    B)Next whole block section
    C)Back whole block section
    D)None of these
    Answer: Next whole block section
  • Q. The maximum speed of a train while passing through station of interlocking std III is?
    A)140 kmph
    B)50 kmph
    C)110 kmph
    D)160 kmph
    Answer: 140 kmph

Leave a Comment