More Questions on Indian Railway
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. Continuity test is to be done.
A)_____00
B)0
C)0
D)00------
Answer: 00------
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. For Block Back form ________ To be issued on DL.
A)T/B-806+PN
B)T/806+PN
C)T/A806+PN
D)None of these
Answer: T/806+PN
- Q. The zone with the minimum length is
A)South - East Railway
B)North - Eastern Railway
C)North - Eastern Frontier Railway
D)South - Central Railway
Answer: North - Eastern Frontier Railway
- Q. Rake link book-let is prepared by COM and ________.
A)DPO
B)CPTM
C)CPO
D)None of these
Answer: CPTM
- Q. Isolation shall be provided at an interlocked station when the speed is
A)Above 50 kmph
B)50 kmph
C)75 kmph
D)None of these
Answer: Above 50 kmph
- Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
A)Central Reserve Police Force
B)Assam Rifles
C)National Security Guard
D)Sashastra Seema Bal
Answer: National Security Guard
- Q. During poor visibility the speed of lorry is
A)5 kmph
B)8 kmph
C)15 kmph
D)None of these
Answer: 5 kmph
- Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third
B)First
C)Second
D)Fourth
Answer: Fourth
- Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm
B)60 mm
C)70 mm
D)50 mm
Answer: 50 mm
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: Normal
- Q. ________ tail board will be used is EMU train.
A)Turn Over & Turn Flow
B)Turnover
C)Turn Flow
D)None of these
Answer: Turnover
- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. At least how far will the final detonator be used to defend the train in broad gauge?
A)820 meters
B)180 meters
C)600 meters
D)1220 meters
Answer: 1220 meters
- Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10
B)25
C)20
D)None of these
Answer: 25
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State