- Q. Modified lower quadrant signaling may be introduced only with section of
A)GM
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. The consumption of fuel during idle run per hour is
A)25 Lts
B)15 Lts
C)20 Lts
D)None of these
Answer: 25 Lts
- Q. Nil Caution order number is ________
A)T/C409
B)T/A-409
C)T/B-409
D)None of these
Answer: T/A-409
- Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
A)Madhya Pradesh
B)Tamil Nadu
C)West Bengal
D)Punjab
Answer: West Bengal
- Q. Where is the extreme north of India a railway station?
A)Pathankot
B)Jammu Tawi
C)Baramulla
D)Guwahati
Answer: Baramulla
- Q. Not more than ________ persons including trollyman shall go on a 4 HP motor trolly.
A)9
B)10
C)7
D)4
Answer: 7
- Q. When was the Central Railway established?
A)14th April 1951
B)5th Nov 1951
C)14th Nov 1951
D)16th August, 1951
Answer: 5th Nov 1951
- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red
- Q. Reminder Caution Order is?
A)T/B409
B)T/409
C)T/A409
D)None of these
Answer: T/B409
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
A)5
B)3
C)4
D)6
Answer: 3
- Q. Block instrument and Advanced starter being failed after line clear?
A)T-369(3B) with P. NO. of line clear
B)T/C 1425
C)T/D 602 + T-511
D)T/D 1425
Answer: T-369(3B) with P. NO. of line clear
- Q. What will be the maximum speed of B-Class ODC in Broad guage?
A)40 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 40 kmph
- Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
A)1 - 890 meters
B)1 - 98 meters
C)1 - 830 meters
D)None of these
Answer: 1 - 98 meters
- Q. What is shunting order number?
A)T-806
B)T-609
C)T/A-602
D)T-409
Answer: T-806
- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
A)T/369(1)
B)T/369(3b)
C)T/369(2)
D)T/409
Answer: T/409
- Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
A)1500
B)1200
C)1000
D)1800
Answer: 1000