- Q. When an accident occurs the GDR must their report to next SM in form.
A)ACC5
B)ACC1
C)ACC2
D)ACC3
Answer: ACC3
- Q. The headquarters of South – Central Railways is situated at
A)Secunderabad
B)Mumbai (CST)
C)Chennai
D)Mumbai (Central)
Answer: Secunderabad
- Q. Warner signal is of ________ shape in TALQ signalling system.
A)Both
B)Fish Tailed
C)Long
D)None of these
Answer: Fish Tailed
- Q. Trap indicator is provided to indicate ________.
A)Provision Switch
B)Indication Switch
C)Derailing switch
D)None of these
Answer: Derailing switch
- Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180
B)108
C)100M
D)200
Answer: 180
- Q. During poor visibility the speed of lorry is
A)5 kmph
B)8 kmph
C)15 kmph
D)None of these
Answer: 5 kmph
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.
A)10
B)5
C)7
D)None of these
Answer: 5
- Q. Introduced ________ in Konkan Railway to help old and disabled passengers.
A)Divyang Express
B)Sahayak Express
C)Viklang Seva Express
D)Sarathi Seva
Answer: Sarathi Seva
- Q. In double Distant signalling, outermost signal post is painted with ________.
A)Green & Yellow
B)White & yellow
C)Black & Yellow
D)None of these
Answer: Black & Yellow
- Q. In context with the Indian railways what is TPWS?
A)Train Protection Warning Stopper
B)Train Passenger Warning System
C)Train Protection Warning System
D)Transmission Protection warning Stopper
Answer: Train Protection Warning System
- Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
A)20
B)10
C)15
D)25
Answer: 10
- Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
A)15 kmph
B)20 kmph
C)Stop & Start
D)Normal speed
Answer: Normal speed
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
A)One long
B)Three long
C)Short one long
D)None of these
Answer: Three long
- Q. Load table is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
A)Sectional
B)Corner
C)Warner
D)None of these
Answer: Warner
- Q. What is shunting order number?
A)T-806
B)T-609
C)T/A-602
D)T-409
Answer: T-806
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3