More Questions on Indian Railway
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. Under approved special instructions, Distant signal can be placed along with the
A)Both
B)Last Stop
C)First Stop
D)None of these
Answer: Last Stop
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. Hand shunting of wagons is totally prohibited in gradients
A)1 in 260
B)1 in 400 OR Steeper
C)ST 1- IN 400
D)None of these
Answer: 1 in 400 OR Steeper
- Q. Hand shunting of vehicles in gradients ________ is totally prohibited
A)1 In 100 or steeper
B)1 in 400 or Steeper
C)1 in 200 or steeper
D)None of these
Answer: 1 in 400 or Steeper
- Q. Dead engine is attached at ________ position on a Mail / Express train.
A)Both
B)Engine to engine
C)Next to engine
D)None of these
Answer: Next to engine
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Q. Consider the following statements with respect to the Railway Convention Committee: 1)The committee consists of members only from Lok Sabha 2)Railway Minister is the ex – officio chairman of Railway Convention Committee Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Neither 1 nor 2
- Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter
B)01 meter
C)02 meter
D)04 meter
Answer: 01 meter
- Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
A)Automatic stop signal+180 Meters
B)Next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: Next automatic stop signal
- Q. How many copies of caution order shall be prepared for a train provided with banking engine?
A)5
B)3
C)4
D)None of these
Answer: 5
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
A)145
B)45
C)90
D)150
Answer: 45
- Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
A)Walkie-Talkie
B)Walkie
C)VHF
D)None of these
Answer: Walkie-Talkie
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
A)3
B)1
C)2
D)4
Answer: 3
- Q. How many dead engine can be attached in a goods train?
A)3
B)1
C)2
D)4
Answer: 1
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. The form number of authority to proceed without line clear is ________.
A)T/B1408
B)T/1408
C)T/A1408
D)None of these
Answer: T/1408
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State