- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. Caution order is carried forward at stations on Monday at ________ hours.
A)12:00
B)10:00
C)11:00
D)09:00
Answer: 09:00
- Q. Danger zone in 1500 DC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 1
- Q. S mark on the EMU coach means ________.
A)Scroll
B)Release
C)Spare
D)None of these
Answer: Spare
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore
B)Chittranjan
C)Kapurthala
D)Perambur
Answer: Bangalore
- Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
A)No light
B)White
C)Red
D)None of these
Answer: Red
- Q. Minimum radius for curves in BG is
A)20°
B)16°
C)10°
D)None of these
Answer: 10°
- Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
A)25 kmph
B)10 kmph
C)15 kmph
D)30 kmph
Answer: 10 kmph
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
A)A & B both
B)Absent from his duty
C)Indiscipline
D)None of these
Answer: Absent from his duty
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points
- Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
A)30 meters
B)20 meters
C)25 meters.
D)None of these
Answer: 30 meters
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
A)50 seconds
B)120 seconds
C)90 seconds
D)None of these
Answer: 120 seconds
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
A)DOM
B)ADRM/Sr.DSO/DSO
C)Sr.DOM
D)None of these
Answer: ADRM/Sr.DSO/DSO
- Q. When was the construction work for the first Railway line Started?
A)1823
B)1821
C)1828
D)1830
Answer: 1821
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic