Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?

Correct Answer

30 meters

More Questions on Indian Railway

  • Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
    A)50 kmph
    B)15 kmph
    C)25 kmph
    D)75 kmph
    Answer: 15 kmph
  • Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
    A)--0
    B)0-0
    C)-0-
    D)---
    Answer: 0-0
  • Q. Hand shunting speed is ________
    A)8 kmph
    B)5 kmph
    C)10 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
    A)30
    B)10
    C)20
    D)None of these
    Answer: 30
  • Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
    A)3
    B)1
    C)2
    D)4
    Answer: 2
  • Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
    A)Received train
    B)Train Divided
    C)Thorugh train
    D)None of these
    Answer: Train Divided
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
    A)Red hand signal
    B)Yellow signal
    C)Green signal
    D)None of these
    Answer: Red hand signal
  • Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)10
    B)3
    C)4
    D)20
    Answer: 20
  • Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
    A)National Academy of Indian Railways
    B)Indian Railway Institute of Signal Engineering and Telecommunication
    C)Research Designs and Standards Organisation
    D)Indian Railway Service of Electrical Engineers
    Answer: Research Designs and Standards Organisation
  • Q. Which marker is available in repeating signal?
    A)P-Marker
    B)G-Marker
    C)C-Marker
    D)R-Marker
    Answer: R-Marker
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351
  • Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
    A)145
    B)45
    C)90
    D)150
    Answer: 45
  • Q. SLB determines the limits of block section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical
  • Q. As per the recent survey conducted by the Quality Council of India, which railway stations have been named as the cleanest and dirtiest railway stations in India?
    A)Indore and Visakhapatnam
    B)Darbhanga and Allahabad
    C)Allahabad and Indore
    D)Visakhapatnam and Darbhanga
    Answer: Visakhapatnam and Darbhanga
  • Q. ________ bogies can be attached in rear of SLR of Mail/Express train.
    A)2
    B)4
    C)3
    D)8
    Answer: 2
  • Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
    A)10
    B)15
    C)20
    D)25
    Answer: 10
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. The headquarters of South – Central Railways is situated at
    A)Secunderabad
    B)Mumbai (CST)
    C)Chennai
    D)Mumbai (Central)
    Answer: Secunderabad