Q. What should be done by guard if train entering in block section without authority to proceed?

Correct Answer

All of above

More Questions on Indian Railway

  • Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
    A)15:30
    B)14:30
    C)12:30
    D)13:30
    Answer: 13:30
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. A jumper is remote control and is used for ________.
    A)Control on Light, Fan etc.
    B)Light
    C)Fans
    D)None of these
    Answer: Control on Light, Fan etc.
  • Q. IN the BD Spl, the water must be filled ________.
    A)Three Week
    B)Once a week
    C)Two week
    D)None of these
    Answer: Once a week
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. Weight required minimum for testing IC Apparatus is the
    A)7 - 10 kg
    B)6 kg
    C)10 kg
    D)None of these
    Answer: 7 - 10 kg
  • Q. Caution order is carried forward at stations on Monday at ________ hours.
    A)12:00
    B)10:00
    C)11:00
    D)09:00
    Answer: 09:00
  • Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
    A)16
    B)20
    C)12
    D)10
    Answer: 16
  • Q. Fly shunting will take place in
    A)Flat Yard
    B)Hump Yard
    C)Gravity Yard
    D)None of these
    Answer: Hump Yard
  • Q. When was the construction work for the first Railway line Started?
    A)1823
    B)1821
    C)1828
    D)1830
    Answer: 1821
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Where is the Research, Design and Standard Organisation situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. Consider the following statements about Operating Ratio in Indian Railways: 1)The higher the operating ratio of Indian Railways the better is the condition of Indian Railways. 2)Operating ratio of Indian Railways is high on account of social service obligation imposed in Budget. Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. Capacity of a slip siding is ________
    A)06 or 07 wagon
    B)03 or 04 wagon
    C)04 or 05 wagon
    D)None of these
    Answer: 03 or 04 wagon
  • Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
    A)Counter circuit
    B)Track circuit/axle counter
    C)Circuit
    D)None of these
    Answer: Track circuit/axle counter
  • Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
    A)600 meters
    B)400 meters
    C)500 meters
    D)800 meters
    Answer: 600 meters
  • Q. Railway staff collage is situated at ________.
    A)Chennai
    B)Vadodara
    C)Kanyakumari
    D)New Delhi
    Answer: Vadodara
  • Q. Traffic gates are those located between ________.
    A)First signal
    B)Outermost stop signal
    C)Stop signal
    D)None of these
    Answer: Outermost stop signal
  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)