Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?

Correct Answer

GREEN

More Questions on Indian Railway

  • Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 3 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Second train during TSL will be dispatched after ________.
    A)Both
    B)Line clear
    C)Without line clear
    D)None of these
    Answer: Line clear
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
    A)CSO
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. What will be the minimum distance of 2 Towar Wagons in the same block section ?
    A)130 meters
    B)100 meters
    C)120 meters
    D)140 meters
    Answer: 120 meters
  • Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
    A)South Western Railway
    B)North Eastern Railway
    C)South Central Railway
    D)North Central Railway
    Answer: South Central Railway
  • Q. On which authority advance starter may be passed during shunting operation in its on position?
    A)On hand signal
    B)T-369(3b)
    C)Written memo
    D)T-806
    Answer: T-806
  • Q. When water level is just above top of rail speed of electric locomotive shall apply ?
    A)15 kmph
    B)5 kmph
    C)10 kmph
    D)20 kmph
    Answer: 10 kmph
  • Q. When a stream engine is running tender foremost the speed shall not exceed ________.
    A)30 kmph
    B)40 kmph
    C)20 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
    A)43
    B)41
    C)42
    D)45
    Answer: 45
  • Q. EMU train has ________ and automatic types of working brakes.
    A)Hand Brake
    B)EP Brakes
    C)Power Brake
    D)None of these
    Answer: EP Brakes
  • Q. Which Zone is the largest railway zone in India?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Northern Railway
  • Q. The minimum BP pressure is requiring on engine before continuity test is?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. Colour of the semaphore calling on signal is ________.
    A)Green
    B)Red
    C)White
    D)None of these
    Answer: White
  • Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
    A)10
    B)20
    C)30
    D)None of these
    Answer: 10
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. Hand shunting of vehicles is prohibited in gradient
    A)1 - 400 or steeper
    B)1 - 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400 or steeper
  • Q. Semi-automatic signal is identified by ________.
    A)Illuminated a marker
    B)Marker
    C)Semi marker
    D)None of these
    Answer: Illuminated a marker