Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?

Correct Answer

GREEN

More Questions on Indian Railway

  • Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
    A)16
    B)20
    C)12
    D)10
    Answer: 16
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. What is the maximum speed of shunting of a petrol tank wagon?
    A)2 kmph
    B)15 kmph
    C)8 kmph
    D)5 kmph
    Answer: 8 kmph
  • Q. ________ tail board will be used is EMU train.
    A)Turn Over & Turn Flow
    B)Turnover
    C)Turn Flow
    D)None of these
    Answer: Turnover
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. ________ percent sub – quota for women under all reserved categories
    A)33
    B)30
    C)35
    D)40
    Answer: 33
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
    A)6 hours
    B)12 hours
    C)8 hours
    D)2 Hours
    Answer: 8 hours
  • Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
    A)8
    B)3
    C)5
    D)10
    Answer: 3
  • Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
    A)4
    B)2
    C)3
    D)6
    Answer: 2
  • Q. Where is the Research, Design and Standard Organisation situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. 400 meters beyond the home signal of a C’ class station is called as ________.
    A)Last stop signal
    B)Block section
    C)Overlapping block section
    D)None of these
    Answer: Overlapping block section
  • Q. BSLB determines the limits of Station section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. Hand shunting is performed at speed not exceeding
    A)05 kmph
    B)10 kmph
    C)08 kmph
    D)None of these
    Answer: 05 kmph
  • Q. Train crew shall exchange alright hand signals upto ________ or last points.
    A)Call-on
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. The headquarters of South – Central Railways is situated at
    A)Secunderabad
    B)Mumbai (CST)
    C)Chennai
    D)Mumbai (Central)
    Answer: Secunderabad
  • Q. Which marker is available in repeating signal?
    A)P-Marker
    B)G-Marker
    C)C-Marker
    D)R-Marker
    Answer: R-Marker
  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity