Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?

Correct Answer

GREEN

More Questions on Indian Railway

  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways
  • Q. Continuity test is to be done.
    A)_____00
    B)0
    C)0
    D)00------
    Answer: 00------
  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
    A)139
    B)144
    C)123
    D)119
    Answer: 139
  • Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
    A)TD-912
    B)TA-912
    C)TB-912
    D)TC-1425
    Answer: TA-912
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. Special instructions are issued by ________.
    A)Both
    B)COM
    C)Sr. DOM
    D)None of these
    Answer: COM
  • Q. Fly shunting will take place in
    A)Flat Yard
    B)Hump Yard
    C)Gravity Yard
    D)None of these
    Answer: Hump Yard
  • Q. Block back are used at?
    A)Single/Double line both
    B)On Single line
    C)On Double line
    D)None of these
    Answer: Single/Double line both
  • Q. Point indicator is provided to indicate ________.
    A)Both
    B)Points
    C)Bar
    D)None of these
    Answer: Points
  • Q. The speed of cycle/moped trolley is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Track maintenance machine is permitted to work during
    A)Day clear weather
    B)Day
    C)Day and Night
    D)None of these
    Answer: Day and Night
  • Q. Where is the Research, Design and Standard Organization situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Amount of vaccum level required in high speed train loco is
    A)56 cm
    B)50 cm
    C)55 cm
    D)None of these
    Answer: 56 cm
  • Q. Colour of the semaphore distant signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. Reference of ________ is written by the side of the Rule if the Rule is corrected.
    A)No. and Item No. Correction Slip
    B)Number Slip
    C)Item Number
    D)None of these
    Answer: No. and Item No. Correction Slip
  • Q. During single line working of DL the speed of the first train is ________ kmph
    A)15
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: Normal

Leave a Comment