Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?

Correct Answer

GREEN

More Questions on Indian Railway

  • Q. There are 8 appendices and ________ parts in SWR.
    A)10
    B)8
    C)4
    D)12
    Answer: 12
  • Q. Which state to have India’s first privately – run railway station?
    A)Kerala
    B)Tripura
    C)Odisha
    D)Madhya Pradesh
    Answer: Madhya Pradesh
  • Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 3 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
    A)100 meter
    B)200 meter
    C)250 meter
    D)400 meters and more
    Answer: 400 meters and more
  • Q. What is the maximum speed of 140 ton diesel hydraulic crane?
    A)140 kmph
    B)75 kmph
    C)100 kmph
    D)160 kmph
    Answer: 75 kmph
  • Q. By whom the rear portion of train left behind in block section protected?
    A)By engineearing official
    B)By Guard
    C)By LP
    D)No need to protect the load
    Answer: By Guard
  • Q. Where is the information about the Ruling Gradient of a section?
    A)G & SR
    B)SWR
    C)WTT
    D)Operating Manual
    Answer: WTT
  • Q. Which of the following is the largest railway junction in India?
    A)Mathura
    B)Delhi
    C)Bhatinda
    D)Allahabad
    Answer: E
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Material train is a ________ train.
    A)Both
    B)Departmental
    C)Permanent
    D)None of these
    Answer: Departmental
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van
  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)
  • Q. The speed of Motor Trolly over points and crossings is
    A)15 kmph
    B)10 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
    A)Normal
    B)20 kmph
    C)50 kmph
    D)Stop at every station
    Answer: 20 kmph
  • Q. If the driver does not receive all right signal from the guard, he must call by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short
    D)None of these
    Answer: Two sharp whistles
  • Q. The speed of Engine on Baharline is ________ kmph
    A)16
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. It is a Python Rake.
    A)15 kmph
    B)60 kmph
    C)25 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes