Q. What is the maximum speed over facing point in non-interlocked station?

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. Where is the information about the Ruling Gradient of a section?
    A)G & SR
    B)SWR
    C)WTT
    D)Operating Manual
    Answer: WTT
  • Q. In double Distant signalling, outermost signal is called as ________.
    A)Stop
    B)Distant
    C)Call-on
    D)None of these
    Answer: Distant
  • Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. What is the massage of 000 (three short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control
    D)Unable to proceed
    Answer: Train out of control
  • Q. 400 meters beyond the home signal of a C’ class station is called as ________.
    A)Last stop signal
    B)Block section
    C)Overlapping block section
    D)None of these
    Answer: Overlapping block section
  • Q. What will be the maximum speed of a train hauling by Diesel engine when water level is 70mm above from rail level in broad guage line?
    A)5 km
    B)25 km
    C)15 km
    D)Stop Train
    Answer: 5 km
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. Maximum speed of trains during day in case of OHE failure is ________
    A)65 km
    B)108 km
    C)70 km
    D)60 km
    Answer: 60 km
  • Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
    A)Hand
    B)Outer
    C)Call-On
    D)Non eof these
    Answer: Outer
  • Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. Hand shunting of wagons is totally prohibited in gradients
    A)1 in 260
    B)1 in 400 OR Steeper
    C)ST 1- IN 400
    D)None of these
    Answer: 1 in 400 OR Steeper
  • Q. Hand shunting speed is ________
    A)8 kmph
    B)5 kmph
    C)10 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Block overlap in multiple aspect signalling system is ________ meters.
    A)180
    B)200
    C)300
    D)208
    Answer: 180
  • Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical
  • Q. Which whistle code shall be used by loco pilot while Approach on W board.
    A)Three short
    B)Long continue
    C)Intermittent
    D)Three long
    Answer: Intermittent
  • Q. When was the North-Eastern frontier Railway (NFR) established?
    A)2nd January, 1956
    B)15th January, 1958
    C)15th January, 1955
    D)14th April, 1952
    Answer: 15th January, 1958
  • Q. Colour of the semaphore calling on signal is ________.
    A)Green
    B)Red
    C)White
    D)None of these
    Answer: White
  • Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
    A)Red hand signal
    B)Yellow signal
    C)Green signal
    D)None of these
    Answer: Red hand signal
  • Q. Indian Railways has launched an integrated mobile app “Rail Saarthi” for railway passengers. What does “Saarthi” stands for?
    A)Synchronous Advanced Application Rail Travel Help and Information
    B)Synergised Advanced Application Rail Travel Help and Information
    C)Synchronic Advanced Application Rail Travel Help and Information
    D)Synergic Advanced Application Rail Travel Help and Information
    Answer: Synergised Advanced Application Rail Travel Help and Information