Q. What is the maximum speed over facing point in non-interlocked station?

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. During TFC in double line which authority to serve the driver for train operation?
    A)TC-602
    B)TC-1425
    C)TA-602
    D)TD-1425
    Answer: TC-602
  • Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. Number of train signal register of single line is ________.
    A)T/166 B
    B)T/136 A
    C)T/137 B
    D)T/135
    Answer: T/137 B
  • Q. If the driver does not receive all right signal from the guard, he must call by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short
    D)None of these
    Answer: Two sharp whistles
  • Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
    A)Shimla
    B)Lucknow
    C)Chandigarh
    D)Siliguri
    Answer: Siliguri
  • Q. Speed of second train during temporary single line working is ________.
    A)Both
    B)Normal
    C)Abnormal
    D)None of these
    Answer: Normal
  • Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
    A)DOM
    B)ADRM/Sr.DSO/DSO
    C)Sr.DOM
    D)None of these
    Answer: ADRM/Sr.DSO/DSO
  • Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
    A)South Western Railway
    B)North Eastern Railway
    C)South Central Railway
    D)North Central Railway
    Answer: South Central Railway
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. How many minimum BP pressure is require in engine to charge Goods train?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
    A)50 seconds
    B)120 seconds
    C)90 seconds
    D)None of these
    Answer: 120 seconds
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Weight required minimum for testing IC Apparatus is the
    A)7 - 10 kg
    B)6 kg
    C)10 kg
    D)None of these
    Answer: 7 - 10 kg
  • Q. What is the maximum speed over facing point in non-interlocked station?
    A)15 kmph
    B)50 kmph
    C)75 kmph
    D)25 kmph
    Answer: 15 kmph
  • Q. Maximum speed of pushing back is ________ km/h.
    A)45
    B)30
    C)25
    D)40
    Answer: 25
  • Q. Minimum depth of space for wheel flange from rail level in BG is
    A)3"
    B)2"
    C)1 (1/2)"
    D)None of these
    Answer: 1 (1/2)"
  • Q. Time taken by train running at MPS is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Minimum running time
  • Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
    A)Madhya Pradesh
    B)Tamil Nadu
    C)West Bengal
    D)Punjab
    Answer: West Bengal

Leave a Comment