Q. What is the maximum speed over facing point in non-interlocked station?

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)4
    B)10
    C)9
    D)3
    Answer: 10
  • Q. Signals are treated as ________ if connected points become defective.
    A)Both
    B)Defective
    C)Restricted
    D)None of these
    Answer: Defective
  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. In the enroute, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
    A)Power
    B)Electrical & Diesel
    C)Diesel
    D)None of these
    Answer: Electrical & Diesel
  • Q. To apply for Line block, the notice shall be given to DRM not less than
    A)12 hours
    B)48 hours
    C)24 hours
    D)None of these
    Answer: 24 hours
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________
    A)15/6
    B)15/8
    C)15/4
    D)15/2
    Answer: 15/8
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
    A)T-1425
    B)T-806 +Caution order
    C)T/D 602 + T-511
    D)None of these
    Answer: T/D 602 + T-511
  • Q. Suburban Working time table is signed by ________ , COM and CPTM.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph

Leave a Comment