- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. In which institution the training of electric work is being given?
A)Railway Staff College
B)Indian Railways Institute of Mechanical and Electrical Engineering
C)Indian Railways Institute of Electrical Engineering
D)Indian Railways Institute of Civil Engineering
Answer: Indian Railways Institute of Electrical Engineering
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. when form T/D 912 is issued the driver shall not exceed the speed
A)25 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35
B)15
C)20
D)10
Answer: 10
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Q. Maximum number of Explosive unit wagons in a goods
A)3
B)10
C)15
D)None of these
Answer: 10
- Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
A)0000-000
B)000000-0000 0
C)00000-0
D)0000-0000
Answer: 000000-0000 0
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph
- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. When the train catches fire, that carriage must be ________.
A)Both
B)Isolated
C)Non-isolated
D)None of these
Answer: Isolated
- Q. When was the first underground railway (Metro Railway) started?
A)1984
B)1982
C)1989
D)1992
Answer: 1984
- Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
A)Only 1, 2 & 4
B)Only 1 & 2
C)Only 1, 2 & 3
D)1, 2, 3 & 4
Answer: Only 1, 2 & 4
- Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
A)No light
B)White
C)Red
D)None of these
Answer: Red
- Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: Last Stop signal
- Q. Adequate distance mentioned in the automatic block system is ________ meters.
A)105
B)110
C)120
D)115
Answer: 120
- Q. Derailment will come under accident class ________.
A)C
B)A
C)B
D)D
Answer: D
- Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi
B)Hyderabad
C)Chennai
D)Kolkata
Answer: Hyderabad
- Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: Normal
- Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1)
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(1)
- Geography