More Questions on Indian Railway
- Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
A)30 meters
B)20 meters
C)25 meters.
D)None of these
Answer: 30 meters
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. The time limit for starting BD special during day is ________.
A)30 meters
B)20 meters
C)15 meters
D)40 meters
Answer: 30 meters
- Q. Caution order is carried forward at stations on Monday at ________ hours.
A)12:00
B)10:00
C)11:00
D)09:00
Answer: 09:00
- Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
A)10
B)20
C)30
D)None of these
Answer: 10
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Q. Which state has the longest route (in kilometers) of railway line in India?
A)Rajasthan
B)Maharashtra
C)Andhra Pradesh
D)Uttar Pradesh
Answer: Uttar Pradesh
- Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
A)139
B)144
C)123
D)119
Answer: 139
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
A)1918
B)1911
C)1913
D)1917
Answer: 1911
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. No passenger train shall be started from a station before the ________ time
A)Both
B)Advertised
C)Non-advertised
D)None of these
Answer: Advertised
- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. Block section limit board provided at station?
A)B class Single line TA
B)B class Single line MAUQ
C)B class Double line TA
D)B class Double line MA
Answer: B class Double line MA
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. In case of ACP, Guard of EMU shall give ________ bell.
A)0-00-00
B)00-00-00
C)00-0-00
D)000-0-00
Answer: 00-0-00
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light
- Q. Where is the headquarters of Central Railway situated?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
A)40/15 kmph
B)60/30 kmph
C)35/20 kmph
D)Normal speed
Answer: 35/20 kmph