More Questions on Indian Railway
- Q. The minimum BP pressure is requiring on engine before continuity test is?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
A)One long
B)Three long
C)Short one long
D)None of these
Answer: Three long
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10
B)25
C)20
D)None of these
Answer: 25
- Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
A)In Break van
B)At Facing point
C)On Engine
D)At Anyplace
Answer: In Break van
- Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
A)Assam and Maharashtra
B)Manipur and Jammu & Kashmir
C)Jammu & Kashmir & Assam
D)Maharashtra and Jammu & Kashmir
Answer: Manipur and Jammu & Kashmir
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
A)6.8
B)7.8
C)5.8
D)4.8
Answer: 4.8
- Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
A)RailSilver
B)RailSagar
C)RailCloud
D)RailBharat
Answer: RailCloud
- Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
A)NTPC
B)ONGC
C)GAIL India
D)IOCL
Answer: GAIL India
- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. How much block overlap is required at the station equipped with single line MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
A)8
B)3
C)5
D)10
Answer: 3
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. Distance between two automatic signals is called as ________.
A)Signalling Section
B)Block section
C)Mid Section
D)None of these
Answer: Signalling Section
- Q. Block competency certificate is given in the prescribed form ________.
A)T/115A
B)T/115B
C)T/115C
D)T/115D
Answer: T/115B
- Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
A)Hyderabad
B)Visakhapatnam
C)Kolkata
D)Bhubaneswar
Answer: Bhubaneswar
- Q. At least how far will the final detonator be used to defend the train in broad gauge?
A)820 meters
B)180 meters
C)600 meters
D)1220 meters
Answer: 1220 meters
- Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________
A)15/6
B)15/8
C)15/4
D)15/2
Answer: 15/8
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State