Q. Wagon with livestock shall be attached ________ position from engine on a goods train.

Correct Answer

Second

More Questions on Indian Railway

  • Q. If the signal is continuously bobbing/flickering, the signal is treated as showing ________ aspect.
    A)Rectified
    B)Most Restrictive
    C)Restrictive
    D)None of these
    Answer: Most Restrictive
  • Q. Which type Authority to proceed shall be used at without starter signal station on single line?
    A)Any one
    B)Non Tangible
    C)Tangible
    D)None of these
    Answer: Tangible
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. What will be the maximum speedof train in case of failure of headlight of engine?
    A)60 kmph
    B)30 kmph
    C)40 kmph
    D)Normal speed
    Answer: 40 kmph
  • Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
    A)T/606
    B)T/605
    C)T/606
    D)T/609
    Answer: T/609
  • Q. When a stream engine is running tender foremost the speed shall not exceed ________.
    A)30 kmph
    B)40 kmph
    C)20 kmph
    D)None of these
    Answer: 40 kmph
  • Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
    A)Andhra Pradesh
    B)Rajasthan
    C)Maharastra
    D)Gujarat
    Answer: Rajasthan
  • Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
    A)T/A409
    B)T/369(1)
    C)T/409
    D)No Need of any Authority
    Answer: T/369(1)
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year
  • Q. When was the Central Railway established?
    A)14th April 1951
    B)5th Nov 1951
    C)14th Nov 1951
    D)16th August, 1951
    Answer: 5th Nov 1951
  • Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
    A)15 km
    B)18 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. passing through station during day when running without brakevan and tail board.
    A)25 kmph
    B)10 kmph
    C)20 kmph
    D)Normal speed
    Answer: 20 kmph
  • Q. Train is to be passed through loop line.
    A)30 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
    A)30
    B)20
    C)25
    D)15
    Answer: 15

Leave a Comment