Q. Wagon with livestock shall be attached ________ position from engine on a goods train.

Correct Answer

Second

More Questions on Indian Railway

  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
    A)Uttarakhand
    B)Bihar
    C)Uttar Pradesh
    D)Delhi
    Answer: Uttar Pradesh
  • Q. Adequate distance mentioned in the automatic block system is ________ meters.
    A)105
    B)110
    C)120
    D)115
    Answer: 120
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
    A)15
    B)10
    C)20
    D)40
    Answer: 15
  • Q. For imposition of line block application must be sent ________ Hours in advance.
    A)18
    B)24
    C)12
    D)22
    Answer: 24
  • Q. Station manager of a big station shall inspect the cabins at least once in ________.
    A)Thrice in a week.
    B)Once in a week
    C)Twice in a week
    D)None of these
    Answer: Once in a week
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
    A)3
    B)1
    C)2
    D)4
    Answer: 3
  • Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.
    A)Three Long
    B)One Long
    C)Two Long
    D)None of these
    Answer: One Long
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)
  • Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
    A)Yellow
    B)RED
    C)Green
    D)None of these
    Answer: RED
  • Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
    A)In Break van
    B)At Facing point
    C)On Engine
    D)At Anyplace
    Answer: In Break van
  • Q. Competency certificate of the gateman of interlocked engineering gate is issued by
    A)SSE/C & W
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: SSE/P.way
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. Amount of vaccum level required in high speed train loco is
    A)56 cm
    B)50 cm
    C)55 cm
    D)None of these
    Answer: 56 cm
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. The maximum speed of the assistance train to be sent on T/A 602
    A)30 kmph
    B)10 kmph
    C)15 kmph
    D)40 kmph
    Answer: 15 kmph
  • Q. Metro Railway is functioning in which of the following Indian States?
    A)West Bengal
    B)Gujarat
    C)Maharashtra
    D)Tamil Nadu
    Answer: West Bengal