- Q. Ruling gradient of the division is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Fog signal man must be on ________ Hrs duty.
A)5
B)3
C)4
D)None of these
Answer: 3
- Q. When ISMD attached train is allowed to run through on PF line the speed must be
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter
B)01 meter
C)02 meter
D)04 meter
Answer: 01 meter
- Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
A)1, 2 & 3
B)Only 1
C)1 & 2
D)1, 2 , 3 & 4
Answer: Only 1
- Q. If the advanced starter and IBS are defective, SM shall issue T/369(3b) authority with private number of ________ station to pass both advanced starter and IBS.
A)Both
B)Back
C)Next
D)None of these
Answer: Next
- Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. Adequate distance mentioned in the automatic block system is ________ meters.
A)105
B)110
C)120
D)115
Answer: 120
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. When baking a train from one line to the other line, it is necessary to present the train guard.
A)Break van
B)Point
C)Station
D)Any Place
Answer: Break van
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. What is the massage of 000 (three short) whistle sound by loco pilot?
A)Train parting
B)Signal Approaching
C)Train out of control
D)Unable to proceed
Answer: Train out of control
- Q. The headquarters of North – East Frontier Railway (NFR) is
A)Chennai
B)Kolkata
C)Maligaon (Guwahati)
D)Gorakhpur
Answer: Maligaon (Guwahati)
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. Slip siding protects
A)Station section
B)Station limit
C)Block section
D)None of these
Answer: Block section
- Q. During prolonged failure of signals in automatic section, ________ authority is issued.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. What should be done by guard if train entering in block section without authority to proceed?
A)Protect the Train
B)Stop the Train
C)Inform to SM
D)All of above
Answer: All of above
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points