More Questions on Indian Railway
- Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
A)2
B)1.5
C)1
D)None of these
Answer: 1.5
- Q. The speed of a Trolley is
A)15 kmph
B)20 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. Booked speed is fixed by ________.
A)Sr. DOM
B)COM
C)CCM
D)None of these
Answer: COM
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. Which Zone is the largest railway zone in India?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Northern Railway
- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
A)Only 1 & 3
B)Only 1
C)Only 1 & 2
D)Only 1, 3 & 4
Answer: Only 1
- Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
A)6
B)2
C)4
D)8
Answer: 2
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
A)DOM
B)AOM(G)
C)AOM(Chg)
D)None of these
Answer: AOM(G)
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958
- Q. In case of ACP, Guard of EMU shall give ________ bell.
A)0-00-00
B)00-00-00
C)00-0-00
D)000-0-00
Answer: 00-0-00
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State