Q. Wagon with livestock shall be attached ________ position from engine on a goods train.

Correct Answer

Second

More Questions on Indian Railway

  • Q. Visibility test object is placed at a distance of ________ meters from the station building.
    A)180
    B)108
    C)100M
    D)200
    Answer: 180
  • Q. In case of defective head light, ________ bell code is given on block instrument to the station in advance.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-0
  • Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
    A)Both 1 & 2
    B)Only 1
    C)Only 2
    D)Neither 1 nor 2
    Answer: Only 2
  • Q. The White light in point indicator indicates?
    A)Pass run through
    B)Loop line is set
    C)Main line set
    D)All is right
    Answer: Main line set
  • Q. Diesel locomotives are built in?
    A)Perambur
    B)Banglore
    C)Varanasi
    D)Hubli
    Answer: Varanasi
  • Q. Reminder Caution order number is ________.
    A)T/C-408
    B)T/B-409
    C)T/A-409
    D)None of these
    Answer: T/B-409
  • Q. What is the position of the Indian Railway in the world according to the length of rail lines?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Fourth
  • Q. While stabling box load, hand brakes of ________ wagons at both ends shall be pinned down.
    A)7 - 7
    B)8 - 8
    C)6 - 6
    D)8 - 8
    Answer: 6 - 6
  • Q. passing through station during day when running without brakevan and tail board.
    A)25 kmph
    B)10 kmph
    C)20 kmph
    D)Normal speed
    Answer: 20 kmph
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
    A)8
    B)10
    C)5
    D)25
    Answer: 25
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A
  • Q. Depot in-charge is responsible to test the detonators once in ________.
    A)Year
    B)Monthly
    C)Weekly
    D)None of these
    Answer: Year
  • Q. What is the width of broad gauge railway line in India?
    A)4 feet 11 inches
    B)5 feet 3 inches
    C)5 feet 6 inches
    D)5 feet 4 inches
    Answer: 5 feet 6 inches
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
    A)Shunt signal
    B)Calling-on Signal
    C)Home Signal
    D)None of these
    Answer: Home Signal
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. Normally the train with hot axle is admitted on ________.
    A)Main Line
    B)Loop Line
    C)Siding Line
    D)None of these
    Answer: Main Line

Leave a Comment