More Questions on Indian Railway
- Q. All automatic stop signals will have ________ marker plate.
A)G
B)B
C)A
D)None of these
Answer: A
- Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
A)150 meters
B)200 meters
C)180 meters
D)None of these
Answer: 150 meters
- Q. On which authority advance starter may be passed during shunting operation in its on position?
A)On hand signal
B)T-369(3b)
C)Written memo
D)T-806
Answer: T-806
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8
B)7
C)9
D)10
Answer: 9
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. Repeating signal shows ________ light in ON condition.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. Between which of the destinations the first Indian train was started?
A)From Mumbai to Surat
B)From Kolkata to Delhi
C)From Mumbai to Thane
D)From Mumbai to Madras
Answer: From Mumbai to Thane
- Q. In Material train, vehicles shall not be detached on gradient.
A)1-400
B)ST 1-260
C)1-100 or steeper
D)None of these
Answer: 1-100 or steeper
- Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph
B)2 kmph
C)2.5 kmph
D)3.5 kmph
Answer: 2.5 kmph
- Q. If the signal is continuously bobbing/flickering, the signal is treated as showing ________ aspect.
A)Rectified
B)Most Restrictive
C)Restrictive
D)None of these
Answer: Most Restrictive
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
A)Green
B)White
C)Red
D)NIL
Answer: NIL
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
A)50 kmph
B)Booked
C)Sectional
D)None of these
Answer: Sectional
- Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
A)1996
B)2000
C)1995
D)1997
Answer: 1995
- Q. In which Governor – General’s reign railway lines in India were established?
A)Lord Kenning
B)Lord William Bentick
C)Lord Cornwallis
D)Lord Dalhousie
Answer: Lord Dalhousie
- Q. W/L board will be provided at not less than ________ metres from the gate.
A)600
B)400
C)500
D)800
Answer: 600
- Q. 400 meters beyond the home signal of a C’ class station is called as ________.
A)Last stop signal
B)Block section
C)Overlapping block section
D)None of these
Answer: Overlapping block section
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State