More Questions on Indian Railway
- Q. Palace on Wheels train was inaugurated in which year?
A)1982
B)1988
C)1972
D)1965
Answer: 1982
- Q. Which railway station has become the India’s first station to run by all women staff?
A)Chhatrapati Shivaji Terminus railway station
B)Matunga railway station
C)Hazrat Nizamuddin railway station
D)Kolkata railway station
Answer: Matunga railway station
- Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective
B)Restricted
C)Most restricted
D)Noe of these
Answer: Most restricted
- Q. Train crew shall exchange alright hand signals upto ________ or last points.
A)Call-on
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. Which of the following faunal species found in India are invasive species? 1)Railway Creeper 2)Lantana 3)Black wattle Select the correct option from the codes given below:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points
- Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
A)15 kmph
B)20 kmph
C)Stop & Start
D)Normal speed
Answer: Normal speed
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. ndian Railway’s Jamalpur Workshop is located at?
A)Bihar
B)West Bengal
C)Orissa
D)Uttar Pradesh
Answer: Bihar
- Q. Where is the Research, Design and Standard Organization situated?
A)Pune
B)Lucknow
C)Bangalore
D)New Delhi
Answer: Lucknow
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. 400 meters beyond the home signal of a C’ class station is called as ________.
A)Last stop signal
B)Block section
C)Overlapping block section
D)None of these
Answer: Overlapping block section
- Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
A)Stop his train and find the cause
B)Proceed further with same speed up to next station
C)Proceed further with normal speed
D)None of these
Answer: Stop his train and find the cause
- Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
A)1 - 890 meters
B)1 - 98 meters
C)1 - 830 meters
D)None of these
Answer: 1 - 98 meters
- Q. Adequate distance means the distance sufficient to ensure ________.
A)Station Limit
B)Safety
C)Non-Safety
D)None of these
Answer: Safety
- Q. Capacity of a slip siding is ________
A)06 or 07 wagon
B)03 or 04 wagon
C)04 or 05 wagon
D)None of these
Answer: 03 or 04 wagon
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Q. Who invented the railway engine?
A)James Watt
B)Charles Babbage
C)Isaac Newton
D)George Stephenson
Answer: George Stephenson
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State