Q. Wagon with livestock shall be attached ________ position from engine on a goods train.

Correct Answer

Second

More Questions on Indian Railway

  • Q. During TFC in double line which authority to serve the driver for train operation?
    A)TC-602
    B)TC-1425
    C)TA-602
    D)TD-1425
    Answer: TC-602
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. ________ tail board will be used is EMU train.
    A)Turn Over & Turn Flow
    B)Turnover
    C)Turn Flow
    D)None of these
    Answer: Turnover
  • Q. Percentage of in operative cylinders that can be attached in goods train is
    A)5%
    B)15%
    C)10%
    D)None of these
    Answer: 15%
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. Fly shunting will take place in
    A)Flat Yard
    B)Hump Yard
    C)Gravity Yard
    D)None of these
    Answer: Hump Yard
  • Q. When was the first train steamed off in India?
    A)1875
    B)1848
    C)1853
    D)1880
    Answer: 1853
  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. What is the maximum speed of shunting of a petrol tank wagon?
    A)2 kmph
    B)15 kmph
    C)8 kmph
    D)5 kmph
    Answer: 8 kmph
  • Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
    A)200 meters
    B)100 meters
    C)150 meters
    D)None of these
    Answer: 100 meters
  • Q. How many institutions do give suggestions for railways technology?
    A)Three
    B)One
    C)Two
    D)Four
    Answer: Two
  • Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.
    A)Executive
    B)Examine
    C)Next Examine
    D)None of these
    Answer: Next Examine
  • Q. The banner flag is a ________
    A)Both of these
    B)Temporary stop signal
    C)Permanent stop signal
    D)None of these
    Answer: Temporary stop signal
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B
  • Q. What was the main source of earning of Railway?
    A)Catering
    B)Goods fair
    C)Passenger fair
    D)None of thses
    Answer: Goods fair
  • Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
    A)New Delhi and Kanyakumari
    B)Ernakulam and Howrah
    C)Sriganganagar and Tiruchirapalli
    D)Nizamuddin and Palakkad
    Answer: Ernakulam and Howrah