More Questions on Indian Railway
- Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
A)Both 1 & 2 are correct
B)Only 1 is correct
C)Only 2 is correct
D)Neither 1 nor 2 is correct
Answer: Both 1 & 2 are correct
- Q. Calling on signal shows ________ light in off position in two aspect signalling system.
A)Green
B)White
C)RED
D)Yellow
Answer: Yellow
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 1
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. Matheran Hill Railway is located in which state of India?
A)Odisha
B)Himachal Pradesh
C)Maharashtra
D)Meghalaya
Answer: Maharashtra
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. In context with the Indian railways what is TPWS?
A)Train Protection Warning Stopper
B)Train Passenger Warning System
C)Train Protection Warning System
D)Transmission Protection warning Stopper
Answer: Train Protection Warning System
- Q. Headquarters of which one among the following Railway Zones in India is situated at the highest elevation from the mean sea level?
A)South Western Railway
B)East Central Railway
C)South Eastern Railway
D)West Central Railway
Answer: South Western Railway
- Q. To receive a train on unsignalled line, ________ authority is issued.
A)T/369(4b) Pilot in MEMU
B)T/369(3b) Pilot in MEMO
C)T/369(2B) Pilot in MEMO
D)T/369(5b) Pilot in MEMU
Answer: T/369(3b) Pilot in MEMO
- Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
A)T/A409
B)T/369(1)
C)T/409
D)No Need of any Authority
Answer: T/369(1)
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. Maximum speed of B’ class ODC is ________ km/h.
A)60
B)50
C)40
D)75
Answer: 40
- Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
A)15 km
B)18 km
C)10 km
D)20 km
Answer: 15 km
- Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
A)Shunt
B)Repeating
C)Call-on
D)None of these
Answer: Repeating
- Q. Fog signal man must be on ________ Hrs duty.
A)5
B)3
C)4
D)None of these
Answer: 3
- Q. The Driver of goods train must stop his train as close as possible to ________.
A)Both
B)Starter
C)Advance Starter
D)None of these
Answer: Starter
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. The turning out time off BD SPL. During day is ________ minutes
A)50
B)30
C)20
D)None of these
Answer: 30