- Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph
B)30 kmph
C)25 kmph
D)Normal speed
Answer: 25 kmph
- Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi
B)Hyderabad
C)Chennai
D)Kolkata
Answer: Hyderabad
- Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on
B)Shunt signal
C)Private No.
D)None of these
Answer: Private No.
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. Where is RDSO Situated.
A)Chennai
B)Vadodara
C)Lucknow
D)New Delhi
Answer: Lucknow
- Q. The number of Train examination report is ________.
A)T/436
B)T/431
C)T/432
D)T/436
Answer: T/431
- Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
A)400
B)900
C)800
D)700
Answer: 400
- Q. Train crew shall exchange alright hand signals upto ________ or last points.
A)Call-on
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. In which class overlapping section is found?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
A)Both
B)Off
C)On
D)None of these
Answer: On
- Q. What will be the maximum speedof train in case of failure of headlight of engine?
A)60 kmph
B)30 kmph
C)40 kmph
D)Normal speed
Answer: 40 kmph
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third
B)First
C)Second
D)Fourth
Answer: Second
- Q. Maximum of ________ cranes can be attached in a passenger train.
A)3
B)1
C)2
D)4
Answer: 1
- Q. “Act” means the Railway Act is ________.
A)1989 (22 of 1989)
B)1989 (24 of 1989)
C)1989 (23 of 1989)
D)None of these
Answer: 1989 (24 of 1989)
- Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)4
B)10
C)9
D)3
Answer: 10
- Q. On which speed BG train should be run while speedometer failed in block section?
A)No need to reduced speed
B)10% less of sectional speed
C)10% less of booked speed
D)40 kmph
Answer: 10% less of sectional speed
- Q. P marker is provided for a
A)Semaphore warner
B)Colour light distance
C)Semaphore distant
D)None of these
Answer: Colour light distance
- Q. ________ tail board will be used is EMU train.
A)Turn Over & Turn Flow
B)Turnover
C)Turn Flow
D)None of these
Answer: Turnover
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State