More Questions on Indian Railway
- Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)Only 3
Answer: Only 3
- Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
A)--0
B)0-0
C)-0-
D)---
Answer: 0-0
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. Patrolman becoming overdue during night.
A)40 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 10 kmph
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35
B)15
C)20
D)10
Answer: 10
- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Q. ISMD must be attached always
A)In the middle
B)Next to Engine
C)In rear
D)None of these
Answer: Next to Engine
- Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg
B)6 kg
C)10 kg
D)None of these
Answer: 7 - 10 kg
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. The train has parted
A)_____00
B)------0------0
C)0___0
D)00___
Answer: ------0------0
- Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal
B)Calling-on Signal
C)Home Signal
D)None of these
Answer: Home Signal
- Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Both 1 & 2
- Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)
- Q. In the enroute, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. The headquarters of North – East Frontier Railway (NFR) is
A)Chennai
B)Kolkata
C)Maligaon (Guwahati)
D)Gorakhpur
Answer: Maligaon (Guwahati)
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State