Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. Special instructions are issued by whom?
    A)Authorized officer
    B)CCM
    C)CRS
    D)None of these
    Answer: Authorized officer
  • Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
    A)15 minutes
    B)10 minutes
    C)5 minutes
    D)No need
    Answer: 15 minutes
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
    A)5
    B)4
    C)2
    D)8
    Answer: 5
  • Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
    A)DOUBLE YELLOW
    B)RED
    C)GREEN
    D)YELLOW
    Answer: GREEN
  • Q. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and ________ respectively.
    A)4.5 kg/cm2
    B)4.1 kg/cm2
    C)4.2 kg/cm2
    D)4.7 kg/cm2
    Answer: 4.7 kg/cm2
  • Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. SM shall inspect the personal store of Guard once in ________ months.
    A)6
    B)2
    C)4
    D)3
    Answer: 3
  • Q. On which of the following is the longest railway bridge in India located?
    A)River Brahmaputra
    B)River Ganges
    C)Vembanad Lake
    D)Chilka Lake
    Answer: River Brahmaputra
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. Which is the fastest train in India?
    A)Duronto Express
    B)Rajdhani Express
    C)Shatabdi Express
    D)Tejas Express
    Answer: E
  • Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
    A)600
    B)500
    C)400
    D)800
    Answer: 600
  • Q. The maximum speed of the assistance train to be sent on T/A 602
    A)30 kmph
    B)10 kmph
    C)15 kmph
    D)40 kmph
    Answer: 15 kmph
  • Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0
  • Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. What will be the maximum speed of a train hauling by Diesel engine when water level is 70mm above from rail level in broad guage line?
    A)5 km
    B)25 km
    C)15 km
    D)Stop Train
    Answer: 5 km
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board