- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. Normally material train will work during ________.
A)Both
B)Day
C)Night
D)None of these
Answer: Day
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling
B)ARS
C)Tail Lamp
D)None of these
Answer: ARS
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. During TFC in double line which authority to serve the driver for train operation?
A)TC-602
B)TC-1425
C)TA-602
D)TD-1425
Answer: TC-602
- Q. In which institution the training of electric work is being given?
A)Railway Staff College
B)Indian Railways Institute of Mechanical and Electrical Engineering
C)Indian Railways Institute of Electrical Engineering
D)Indian Railways Institute of Civil Engineering
Answer: Indian Railways Institute of Electrical Engineering
- Q. IBP is a Station in which class?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. Which state to have India’s first privately – run railway station?
A)Kerala
B)Tripura
C)Odisha
D)Madhya Pradesh
Answer: Madhya Pradesh
- Q. Between which of the destinations the first Indian train was started?
A)From Mumbai to Surat
B)From Kolkata to Delhi
C)From Mumbai to Thane
D)From Mumbai to Madras
Answer: From Mumbai to Thane
- Q. General Manager is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)Finance Ministry
Answer: Railway Board
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. Track maintenance machine is permitted to work during
A)Day clear weather
B)Day
C)Day and Night
D)None of these
Answer: Day and Night
- Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
A)T/A 602
B)T-806
C)T/A 802
D)T-806 A
Answer: T-806
- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
A)15
B)25
C)20
D)10
Answer: 25
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Third