More Questions on Indian Railway
- Q. In which city is the Wheel and Axle Plant of the Indian Railways located?
A)Bangalore
B)Kapurthala
C)Varanasi
D)Rae Barelly
Answer: Bangalore
- Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
A)Warner, Home
B)Outer, Home
C)Distant, Home
D)Distant, Home, Starter
Answer: Distant, Home
- Q. Normally maximum gradient in station yards in BG is (at present)
A)1 in 1000
B)1 in 260
C)1 - 400
D)None of these
Answer: 1 - 400
- Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: Normal
- Q. While pushing back, train shall be stopped at ________ stop signal.
A)Slip
B)Outermost
C)Rear most
D)None of these
Answer: Outermost
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. Time taken by train running at MPS is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Minimum running time
- Q. Read the Following Railway Headquarters and Identify which is False?
A)South Railway - Chennai
B)South - Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
A)Both are true
B)Only 1 is true
C)Only 2 is true
D)Neither is true
Answer: Both are true
- Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
A)Receive on loop line
B)Run through from station
C)Receive of Main line
D)None of these
Answer: Run through from station
- Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
A)5 kmph
B)3 kmph
C)4 kmph
D)6 kmph
Answer: 5 kmph
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
A)Gate opened and point is not set for main line
B)Gate closed and point is set for main line
C)Gate opened and point is set for main line
D)Defective signal
Answer: Defective signal
- Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600
B)500
C)400
D)800
Answer: 600
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Q. Maximum No. of ________ explosive wagons can be attached to a goods train.
A)6
B)5
C)4
D)10
Answer: 5
- Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
A)New Delhi and Kanyakumari
B)Ernakulam and Howrah
C)Sriganganagar and Tiruchirapalli
D)Nizamuddin and Palakkad
Answer: Ernakulam and Howrah
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Q. Colour of the semaphore calling on signal is ________.
A)Green
B)Red
C)White
D)None of these
Answer: White