Q. Upto how many track machine shall be allowed for working within the block section?
A
8
B
2
C
5
D
10
Correct Answer
5
More Questions on Indian Railway
Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI B)CI C)LI D)TI
Answer: PWI
Q. Length of BOXN Wagon is
A)10.71 meters B)8.67 meters C)9.78 meters D)None of these
Answer: 10.71 meters
Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
A)Yellow B)Red C)Green D)White
Answer: White
Q. Notice station caution order No. is ________
A)T/C-409 B)T/409 C)T/B-409 D)None of these
Answer: T/409
Q. Maximum of ________ cranes can be attached in a passenger train.
A)3 B)1 C)2 D)4
Answer: 1
Q. Where is the Railway Staff College located?
A)Vadodara B)Pune C)Delhi D)Allahabad
Answer: Vadodara
Q. Consider the following statements with respect to the Railway Convention Committee: 1)The committee consists of members only from Lok Sabha 2)Railway Minister is the ex – officio chairman of Railway Convention Committee Which of the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: Neither 1 nor 2
Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph B)30 kmph C)25 kmph D)Normal speed
Answer: 25 kmph
Q. ________ must be issued during thick or foggy weather.
A)Reminder Caution Order B)Caution Order C)Nil Caution Order D)Minimum Caution Order
Answer: Caution Order
Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
A)60 B)40 C)50 D)45
Answer: 45
Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on B)Shunt signal C)Private No. D)None of these
Answer: Private No.
Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
A)15 B)25 C)20 D)10
Answer: 25
Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy B)Potential energy C)Electricity D)Magnetic energy
Answer: Electricity
Q. Maximum height above rail level for a low passenger platform in BG is
A)840 mm B)455 mm C)760 mm D)None of these
Answer: 455 mm
Q. What is maximum width of coaching stock in BG?
A)3250 mm B)3050 mm C)3200 mm D)3300 mm
Answer: 3250 mm
Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
A)Green B)White C)Red D)NIL
Answer: NIL
Q. To apply for Line block, the notice shall be given to DRM not less than
A)12 hours B)48 hours C)24 hours D)None of these
Answer: 24 hours
Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal B)20 kmph C)50 kmph D)Stop at every station
Answer: 20 kmph
Q. Repeating signal shows ________ light in ON condition.
A)Green B)Red C)Yellow D)None of these
Answer: Red
Q. How much distance was travelled by first train of India?