Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. What will be the speed of second train running on T/C 602?
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. Introduced ________ in Konkan Railway to help old and disabled passengers.
    A)Divyang Express
    B)Sahayak Express
    C)Viklang Seva Express
    D)Sarathi Seva
    Answer: Sarathi Seva
  • Q. Competency certificate of the gateman of interlocked engineering gate is issued by
    A)SSE/C & W
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: SSE/P.way
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Fog signal man must be on ________ Hrs duty.
    A)5
    B)3
    C)4
    D)None of these
    Answer: 3
  • Q. Shunting speed of 5 box wagons is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 2
  • Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
    A)600 meters
    B)400 meters
    C)500 meters
    D)800 meters
    Answer: 600 meters
  • Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
    A)400 meters
    B)270 meters
    C)90 meters
    D)None of these
    Answer: 90 meters
  • Q. What was the main source of earning of Railway?
    A)Catering
    B)Goods fair
    C)Passenger fair
    D)None of thses
    Answer: Goods fair
  • Q. How many hooters shall be used for ART at the time of accident of a goods train outside the HQ.
    A)4
    B)2
    C)3
    D)5
    Answer: 3
  • Q. Distance between outer and home signals on a double line is ________ meters.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. How many institutions do give suggestions for railways technology?
    A)Three
    B)One
    C)Two
    D)Four
    Answer: Two
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
    A)40 kmph
    B)15 kmph
    C)30 kmph
    D)Normal
    Answer: 40 kmph
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
    A)1000 meters
    B)400 meters
    C)600 meters
    D)None of these
    Answer: 600 meters
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
    A)200 meters
    B)100 meters
    C)150 meters
    D)None of these
    Answer: 100 meters
  • Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
    A)5
    B)15
    C)20
    D)None of these
    Answer: 15

Leave a Comment