Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. Interchange point of Central and Western railway is ________.
    A)Both
    B)Dadar
    C)Jalgaon
    D)None of these
    Answer: Both
  • Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. A material train may be divided outside station limit during emergency under the supervision of ________.
    A)Driver
    B)Guard
    C)PWI
    D)None of these
    Answer: PWI
  • Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
    A)Germany
    B)Sweden
    C)Russia
    D)Italy
    Answer: Germany
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351
  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. Maximum number of Explosive unit wagons in a goods
    A)3
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
    A)03 meter
    B)01 meter
    C)02 meter
    D)04 meter
    Answer: 01 meter
  • Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
    A)3 kmph
    B)2 kmph
    C)2.5 kmph
    D)3.5 kmph
    Answer: 2.5 kmph
  • Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
    A)15:30
    B)14:30
    C)12:30
    D)13:30
    Answer: 13:30
  • Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
    A)Stop his train and find the cause
    B)Proceed further with same speed up to next station
    C)Proceed further with normal speed
    D)None of these
    Answer: Stop his train and find the cause
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. In which of the following cities are located 3 zonal headquarters of Indian Railways?
    A)New Delhi
    B)Guwahati
    C)Mumbai
    D)Kolkata
    Answer: Kolkata
  • Q. What does the Slip siding protects?
    A)Block Section
    B)Station Section
    C)Station Limit
    D)Siding
    Answer: Block Section
  • Q. Motorman shall give ________ beat to release the hand brakes.
    A)00-00-00
    B)00-0-00
    C)0-0-0
    D)0-00-00
    Answer: 00-0-00
  • Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
    A)300/400
    B)500/600
    C)400/500
    D)None of these
    Answer: 500/600

Leave a Comment