Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. ________ must be issued during thick or foggy weather.
    A)Reminder Caution Order
    B)Caution Order
    C)Nil Caution Order
    D)Minimum Caution Order
    Answer: Caution Order
  • Q. Maximum speed of shunting of wagons with explosives is ________ km/h.
    A)15
    B)8
    C)10
    D)20
    Answer: 8
  • Q. Capacity of a slip siding is ________
    A)06 or 07 wagon
    B)03 or 04 wagon
    C)04 or 05 wagon
    D)None of these
    Answer: 03 or 04 wagon
  • Q. Sand hump is a substitute to ________ and also a means of isolation.
    A)Over signal
    B)Signal
    C)Signal overlap
    D)None of these
    Answer: Signal overlap
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Competency certificate of the gateman of interlocked engineering gate is issued by
    A)SSE/C & W
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: SSE/P.way
  • Q. No passenger train shall be started from a station before the ________ time
    A)Both
    B)Advertised
    C)Non-advertised
    D)None of these
    Answer: Advertised
  • Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
    A)ALP
    B)Driver
    C)Guard
    D)None of these
    Answer: Guard
  • Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
    A)Authority
    B)Private Number
    C)Cuation Number
    D)None of these
    Answer: Private Number
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Duplicate signal is ________.
    A)Co-acting signal
    B)Home Signal
    C)Warner Signal
    D)None of these
    Answer: Co-acting signal
  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. If a member disagrees with the reasons of the joint note of an accident, he may give
    A)Both
    B)Accident
    C)Dissent
    D)None of these
    Answer: Dissent
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. Which of the following is the largest railway junction in India?
    A)Mathura
    B)Delhi
    C)Bhatinda
    D)Allahabad
    Answer: E
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. The time limit for starting BD special during day is ________.
    A)30 meters
    B)20 meters
    C)15 meters
    D)40 meters
    Answer: 30 meters
  • Q. To apply for Line block, the notice shall be given to DRM not less than
    A)12 hours
    B)48 hours
    C)24 hours
    D)None of these
    Answer: 24 hours
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left