More Questions on Indian Railway
- Q. Maximum height above rail level for a low passenger platform in BG is
A)840 mm
B)455 mm
C)760 mm
D)None of these
Answer: 455 mm
- Q. New freight corridors announced at ________
A)Kharagpur - Vijayawada
B)Delhi - Chennai
C)Kharagpur - Mumbai
D)Gujarat - Agra
Answer: Gujarat - Agra
- Q. Where did Chapman form the committee?
A)Edimbara
B)Glassgo
C)London
D)Lords
Answer: London
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph
- Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
A)0000-000
B)000000-0000
C)00000-0
D)0000-0000
Answer: 000000-0000
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. When did the first ignition engine develop?
A)1900
B)1890
C)1892
D)1904
Answer: 1892
- Q. The numbers of A, B and C coaches are 72, ________ and 76.
A)71
B)72
C)70
D)75
Answer: 70
- Q. Minimum radius for curves in BG is
A)20°
B)16°
C)10°
D)None of these
Answer: 10°
- Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
A)Rajinder Sachar Committee
B)Bibek Deberoy committee
C)Rangarajan committee
D)Mihir Shah Committee
Answer: Bibek Deberoy committee
- Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
A)T/A409
B)T/369(1)
C)T/409
D)No Need of any Authority
Answer: T/369(1)
- Q. IBS shows ________ light in normal condition.
A)Green
B)White
C)Red
D)Yellow
Answer: Red
- Q. How many training institutions of Railways are in India?
A)Five
B)Three
C)Four
D)Six
Answer: Five
- Q. At the enroute, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. Competency certificate of the gateman of interlocked engineering gate is signed by
A)Both
B)SSE/P.way
C)SSE/Sig.
D)None of these
Answer: Both
- Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
A)Central Reserve Police Force
B)Assam Rifles
C)National Security Guard
D)Sashastra Seema Bal
Answer: National Security Guard
- Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
A)50
B)50
C)40
D)60
Answer: 60
- Q. Block section limit board provided at station?
A)B class Single line TA
B)B class Single line MAUQ
C)B class Double line TA
D)B class Double line MA
Answer: B class Double line MA
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State