Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
    A)1972
    B)1974
    C)1961
    D)1973
    Answer: 1972
  • Q. TSL is started between those two stations at which cross over facility are available and
    A)D Class/IBC
    B)A Class/IBS
    C)C Class/IBS
    D)None of these
    Answer: C Class/IBS
  • Q. Derailment will come under accident class ________.
    A)C
    B)A
    C)B
    D)D
    Answer: D
  • Q. Maximum speed of B’ class ODC is ________ km/h.
    A)60
    B)50
    C)40
    D)75
    Answer: 40
  • Q. SLB determines the limits of Station section and ________
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. Time taken by train running at MPS is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Minimum running time
  • Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
    A)ST 1-260
    B)ST 1-400
    C)1-400 or sleeper
    D)None of these
    Answer: 1-400 or sleeper
  • Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
    A)Only 2 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 3
    Answer: Only 3
  • Q. India’s first – ever railways disaster management centre will come up in which city?
    A)Lucknow
    B)Kolkata
    C)Bengaluru
    D)Pune
    Answer: Bengaluru
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. When water touches danger level mark, C.O. to be issued for speed – during day
    A)20 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The speed of the train over neutral section shall not be less than ________ kmph
    A)40
    B)20
    C)30
    D)None of these
    Answer: 30
  • Q. The Driver of goods train must stop his train as close as possible to ________.
    A)Both
    B)Starter
    C)Advance Starter
    D)None of these
    Answer: Starter
  • Q. What is the name of the first train of Indian Railways handed over to private players for operation?
    A)Karnataka Express
    B)Tejas Express
    C)Shatabdi Express
    D)Duronto Express
    Answer: Tejas Express
  • Q. Consider the following statements about the Railway Convention Committee: 1)It consists of members from Lok Sabha only 2)Chairman of Railway Convention Committee is appointed by Lok Sabha speaker Which among the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. Where did Chapman form the committee?
    A)Edimbara
    B)Glassgo
    C)London
    D)Lords
    Answer: London
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
    A)50
    B)50
    C)40
    D)60
    Answer: 60
  • Q. Each motor coach shall consist of ________ Traction motors.
    A)4
    B)2
    C)3
    D)5
    Answer: 4