Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. What is shunting order number?
    A)T-806
    B)T-609
    C)T/A-602
    D)T-409
    Answer: T-806
  • Q. Impact speed of shunting of one box wagon is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 5
  • Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1 & 2
    C)Only 1, 2 & 3
    D)1, 2, 3 & 4
    Answer: Only 1, 2 & 4
  • Q. The White light in point indicator indicates?
    A)Pass run through
    B)Loop line is set
    C)Main line set
    D)All is right
    Answer: Main line set
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. The number of line clear ticket in down direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/D 1425
    Answer: T/D 1425
  • Q. BD special shall be turned out during night within
    A)30 meters
    B)25 meters
    C)45 meters
    D)None of these
    Answer: 45 meters
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. Motor Trolly can follow another motor trolly during
    A)Day and Night clear weather
    B)Day and Night
    C)Day only
    D)None of these
    Answer: Day and Night clear weather
  • Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
    A)Received train
    B)Train Divided
    C)Thorugh train
    D)None of these
    Answer: Train Divided
  • Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Adequate distance mentioned in the automatic block system is ________ meters.
    A)105
    B)110
    C)120
    D)115
    Answer: 120
  • Q. In case of goods train without brake van, Guard is exempted from ________.
    A)Whistling
    B)ARS
    C)Tail Lamp
    D)None of these
    Answer: ARS
  • Q. For work of long duration, the stop indicator must be erected at not less than
    A)40
    B)30
    C)50
    D)45
    Answer: 30
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. When was the first train in India started?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Reminder Caution order number is ________.
    A)T/C-408
    B)T/B-409
    C)T/A-409
    D)None of these
    Answer: T/B-409
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. TSL is started between those two stations at which cross over facility are available and
    A)D Class/IBC
    B)A Class/IBS
    C)C Class/IBS
    D)None of these
    Answer: C Class/IBS