Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. What will be distance between fire affected train and rest of the train ?
    A)50 meters
    B)25 meters
    C)45 meters
    D)100 meters
    Answer: 45 meters
  • Q. When water touches danger level mark, C.O. to be issued for speed – during day
    A)20 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
    A)Save collision
    B)Violation of block rules
    C)Passingn danger signal
    D)All of above
    Answer: All of above
  • Q. The wagon containing ISMD load shall be attached.
    A)In Middle
    B)In rear
    C)Next to Engine
    D)None of these
    Answer: Next to Engine
  • Q. In which of the following cities are located 3 zonal headquarters of Indian Railways?
    A)New Delhi
    B)Guwahati
    C)Mumbai
    D)Kolkata
    Answer: Kolkata
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Metro Railway is functioning in which of the following Indian States?
    A)West Bengal
    B)Gujarat
    C)Maharashtra
    D)Tamil Nadu
    Answer: West Bengal
  • Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
    A)Central India Railway
    B)Bombay Baroda Railway
    C)The Scindia Railway
    D)Great Indian Peninsula Railway
    Answer: Great Indian Peninsula Railway
  • Q. Loco pilot must have ________ sets of spectacles in his personal store.
    A)Three
    B)Two
    C)One
    D)None of these
    Answer: Two
  • Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
    A)150 meters
    B)200 meters
    C)180 meters
    D)None of these
    Answer: 150 meters
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board
  • Q. The speed of Motor Trolly over points and crossings is
    A)15 kmph
    B)10 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
    A)1000 meters
    B)400 meters
    C)600 meters
    D)None of these
    Answer: 600 meters
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. In one train only system, information of lost of metal token is given to ________.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?
    A)West Bengal ↔ Tripura
    B)Arunachal Pradesh ↔ Tripura
    C)Sikkim ↔ West Bengal
    D)Arunachal Pradesh ↔ Assam
    Answer: Sikkim ↔ West Bengal
  • Q. Reminder Caution Order is?
    A)T/B409
    B)T/409
    C)T/A409
    D)None of these
    Answer: T/B409
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911