Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. Second train during TSL will be dispatched after ________.
    A)Both
    B)Line clear
    C)Without line clear
    D)None of these
    Answer: Line clear
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
    A)20
    B)25
    C)15
    D)None of these
    Answer: 25
  • Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
    A)Andhra Pradesh
    B)Rajasthan
    C)Maharastra
    D)Gujarat
    Answer: Rajasthan
  • Q. At the enroute, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: 10 kmph
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. Semi-automatic signal is identified by ________.
    A)Illuminated a marker
    B)Marker
    C)Semi marker
    D)None of these
    Answer: Illuminated a marker
  • Q. Indian Railway Act means ________.
    A)Part 23 of 1989
    B)Part 22 of 1989
    C)Part 24 of 1989
    D)Part 21 of 1989
    Answer: Part 24 of 1989
  • Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
    A)Receive on loop line
    B)Run through from station
    C)Receive of Main line
    D)None of these
    Answer: Run through from station
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
    A)15
    B)10
    C)20
    D)40
    Answer: 15
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Illuminated A marker of semi-automatic signal means ________.
    A)Outer signal
    B)Working as automatic signal
    C)Semi signal
    D)None of these
    Answer: Working as automatic signal
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?
    A)West Bengal ↔ Tripura
    B)Arunachal Pradesh ↔ Tripura
    C)Sikkim ↔ West Bengal
    D)Arunachal Pradesh ↔ Assam
    Answer: Sikkim ↔ West Bengal
  • Q. Number of train signal register of double line is ________.
    A)T/66 B
    B)T/66 A
    C)T/66 C
    D)T/66
    Answer: T/66 B