Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. Who invented the railway engine?
    A)James Watt
    B)Charles Babbage
    C)Isaac Newton
    D)George Stephenson
    Answer: George Stephenson
  • Q. In case of 1 in 100 rising gradient, ________ siding is provided.
    A)Slip
    B)Long
    C)Catch
    D)None of these
    Answer: Slip
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. What does the Slip siding protects?
    A)Block Section
    B)Station Section
    C)Station Limit
    D)Siding
    Answer: Block Section
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. Number of train signal register of single line is ________.
    A)T/166 B
    B)T/136 A
    C)T/137 B
    D)T/135
    Answer: T/137 B
  • Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
    A)0-00
    B)00-00
    C)000-000
    D)None of these
    Answer: 00-00
  • Q. S mark on the EMU coach means ________.
    A)Scroll
    B)Release
    C)Spare
    D)None of these
    Answer: Spare
  • Q. Trolley caution order no is ________.
    A)600
    B)400
    C)500
    D)800
    Answer: 400
  • Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
    A)Andhra Pradesh
    B)Rajasthan
    C)Maharastra
    D)Gujarat
    Answer: Rajasthan
  • Q. Train crew shall exchange alright hand signals upto ________ or last points.
    A)Call-on
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. Speed of following tower wagon in the block section is ________ km/h.
    A)8
    B)5
    C)2
    D)4
    Answer: 8
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. Your train is first during TSL on double line.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. TSL is started between those two stations at which cross over facility are available and
    A)D Class/IBC
    B)A Class/IBS
    C)C Class/IBS
    D)None of these
    Answer: C Class/IBS
  • Q. The zone with the minimum length is
    A)South - East Railway
    B)North - Eastern Railway
    C)North - Eastern Frontier Railway
    D)South - Central Railway
    Answer: North - Eastern Frontier Railway
  • Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
    A)Hyderabad
    B)Visakhapatnam
    C)Kolkata
    D)Bhubaneswar
    Answer: Bhubaneswar