Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
    A)Both
    B)Outer Most facing Points
    C)Inner Most facing signal
    D)None of these
    Answer: Outer Most facing Points
  • Q. How many members did the railway board had?
    A)4
    B)3
    C)5
    D)8
    Answer: 4
  • Q. Food Safety and Standards Authority of India (FSSAI) certified ________ as India’s first Eat Right Station.
    A)Mumbai Central railway station
    B)Chennai Central railway station
    C)Chhatrapati Shivaji Maharaj railway station
    D)Bengaluru Central railway station
    Answer: Mumbai Central railway station
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. The headquarters of North – Eastern railway is situated at
    A)Gorakhpur
    B)Mumbai (CST)
    C)Guwahati
    D)New Delhi
    Answer: Gorakhpur
  • Q. Second train during TSL will be dispatched after ________.
    A)Both
    B)Line clear
    C)Without line clear
    D)None of these
    Answer: Line clear
  • Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
    A)15
    B)10
    C)5
    D)20
    Answer: 20
  • Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
    A)Hyderabad
    B)Visakhapatnam
    C)Kolkata
    D)Bhubaneswar
    Answer: Bhubaneswar
  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Where is the Indian Railways Institute of Civil Engineering Institute situated?
    A)Nasik
    B)Pune
    C)Chennai
    D)Secunderabad
    Answer: Pune
  • Q. Suburban Working time table is signed by ________ , COM and CPTM.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. What will be the maximum speed of a train hauling by Diesel engine when water level is 70mm above from rail level in broad guage line?
    A)5 km
    B)25 km
    C)15 km
    D)Stop Train
    Answer: 5 km
  • Q. Consider the following statements about Railway Convention Committee: 1)The Chairman of the Committee is appointed by the Speaker from amongst the members of the Committee 2) The Committee reviews the rate of dividend which is payable by the Railway Undertaking to the General Revenues Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. The banner flag is a ________
    A)Both of these
    B)Temporary stop signal
    C)Permanent stop signal
    D)None of these
    Answer: Temporary stop signal
  • Q. EMU train has ________ type of couplings.
    A)Shakuu
    B)Shakau
    C)Shakua
    D)None of these
    Answer: Shakau
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. After how much time Any goods train shall be treated as overdue train?
    A)After 20 minutes
    B)After 10 minutes
    C)After 15 minutes
    D)After 25 minutes
    Answer: After 20 minutes

Leave a Comment