Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
    A)Habibganj railway station
    B)Farukhnagar railway station
    C)Safdarjung railway station
    D)Mumbai Central railway station
    Answer: Safdarjung railway station
  • Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
    A)T/A-912
    B)T/B-912
    C)T/C-912
    D)None of these
    Answer: T/B-912
  • Q. In which country was flange wheel invented?
    A)Europe
    B)Germany
    C)Japan
    D)Russia
    Answer: Germany
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. In diesel engine, ignition is caused by
    A)Compression
    B)Spark
    C)Automatic starter
    D)Friction
    Answer: Compression
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. Moped trolley / Scooter trolley treated as ________.
    A)Motor Trolley
    B)Push Trollies
    C)Trolley
    D)None of these
    Answer: Motor Trolley
  • Q. Written authority received to pass approach stop signal.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
    A)15/10 km/h
    B)25/10 km/h
    C)20/10 km/h
    D)None of these
    Answer: 15/10 km/h
  • Q. For ‘B’ Class ISMD load, permission must be granted by
    A)CE
    B)DRM
    C)CRS
    D)None of these
    Answer: CE
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A
  • Q. To apply for Line block, the notice shall be given to DRM not less than
    A)12 hours
    B)48 hours
    C)24 hours
    D)None of these
    Answer: 24 hours
  • Q. The additional Hours in the case of staff posted at way side stations who are provided with quarters within 0.5kkm will be ________ beyond.
    A)24 Hours
    B)12 Hours
    C)08 Hours
    D)16Hours
    Answer: 24 Hours
  • Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
    A)DOUBLE YELLOW
    B)RED
    C)GREEN
    D)YELLOW
    Answer: GREEN
  • Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
    A)T/369(B)
    B)T/369(3b)
    C)T/369(2b)
    D)None of these
    Answer: T/369(2b)

Leave a Comment