Q. Upto how many track machine shall be allowed for working within the block section?

Correct Answer

5

More Questions on Indian Railway

  • Q. Termination indication board will be
    A)Rectangular
    B)Square
    C)Round
    D)None of these
    Answer: Round
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. W/L board will be provided at not less than ________ metres from the gate.
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. The first Shatabdi express was introduced between which of the following locations?
    A)New Delhi and Jhansi
    B)Bombay and Thane
    C)Bombay and Kolkata
    D)New Delhi and Chennai
    Answer: New Delhi and Jhansi
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
    A)Stop his train and find the cause
    B)Proceed further with same speed up to next station
    C)Proceed further with normal speed
    D)None of these
    Answer: Stop his train and find the cause
  • Q. Which of the following has become the India’s first railway station to have sanitary napkin vending machine?
    A)Kolkata railway station
    B)Thane railway station
    C)Hazrat Nizamuddin railway station
    D)Bhopal railway station
    Answer: Bhopal railway station
  • Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
    A)01 month
    B)04 month
    C)02 month
    D)03 Months
    Answer: 02 month
  • Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
    A)15 kmph
    B)30 kmph
    C)25 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
    A)25
    B)30
    C)20
    D)50
    Answer: 30
  • Q. Consider the following sectors: 1)Plantation Sector 2)Mining and Exploration of Metal 3)Railway Infrastructure In which of the above, government has permitted 100% FDI through automatic route?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
    A)25 kmph
    B)30 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. On which speed BG engine shall be run while speedometer is defective during run?
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)Maximum 10% less of MPS
    Answer: Maximum 10% less of MPS
  • Q. Booked speed is fixed by ________.
    A)Sr. DOM
    B)COM
    C)CCM
    D)None of these
    Answer: COM
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. Station Master shall give line clear with ________ while granting line clear.
    A)Calling-on
    B)Shunt signal
    C)Private No.
    D)None of these
    Answer: Private No.
  • Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical

Leave a Comment