- Q. The extended life of Detonator is ________ Years.
A)4
B)5
C)6
D)10
Answer: 10
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
A)Both 1 & 2
B)Only 1
C)Only 2
D)Neither 1 nor 2
Answer: Only 2
- Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph
B)30 kmph
C)25 kmph
D)Normal speed
Answer: 25 kmph
- Q. Which of the gauges is used in the hilly areas?
A)Narrow gauge
B)Broad gauge
C)Meter gauge
D)Special gauge
Answer: Narrow gauge
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. Signal failure advised to the driver through the station in rear will be inform
A)T/369(3b)
B)T/369
C)T/370
D)None of these
Answer: T/369
- Q. Medical relief van shall be dispatched within ________ minutes from double exit siding.
A)15
B)10
C)20
D)25
Answer: 15
- Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph
B)140 kmph
C)160 kmph
D)15 kmph
Answer: 15 kmph
- Q. Diesel locomotives are built in?
A)Perambur
B)Banglore
C)Varanasi
D)Hubli
Answer: Varanasi
- Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
A)10 kmph
B)25 kmph
C)15 kmph
D)None of these
Answer: 25 kmph
- Q. Normal condition of automatic stop signal is ________.
A)Yellow
B)Red
C)Green
D)None of these
Answer: Green
- Q. Which whistle code shall be used by loco pilot while Approach on W board.
A)Three short
B)Long continue
C)Intermittent
D)Three long
Answer: Intermittent
- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?
A)West Bengal ↔ Tripura
B)Arunachal Pradesh ↔ Tripura
C)Sikkim ↔ West Bengal
D)Arunachal Pradesh ↔ Assam
Answer: Sikkim ↔ West Bengal
- Q. On double line, when a running line is blocked by stabled load , the point to be set against are
A)Advance point
B)Either side points
C)Rear points
D)None of these
Answer: Rear points