More Questions on Indian Railway
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. When was the nationalization of Indian Railways done?
A)1951
B)1952
C)1950
D)1954
Answer: 1950
- Q. If the driver does not receive all right signal from the guard, he must call by giving.
A)On long
B)Two sharp whistles
C)One long one short
D)None of these
Answer: Two sharp whistles
- Q. Block instrument and Advanced starter being failed after line clear?
A)T-369(3B) with P. NO. of line clear
B)T/C 1425
C)T/D 602 + T-511
D)T/D 1425
Answer: T-369(3B) with P. NO. of line clear
- Q. In diesel engine, ignition is caused by
A)Compression
B)Spark
C)Automatic starter
D)Friction
Answer: Compression
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. Which Zone is the largest in Indian Railways?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Eastern Railway
- Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 2 Only
C)3 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
A)45
B)70
C)65
D)75
Answer: 75
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35
B)15
C)20
D)10
Answer: 10
- Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
A)A & B both
B)Absent from his duty
C)Indiscipline
D)None of these
Answer: Absent from his duty