More Questions on Indian Railway
- Q. Consider the following statements about Railway Convention Committee: 1)The Chairman of the Committee is appointed by the Speaker from amongst the members of the Committee 2) The Committee reviews the rate of dividend which is payable by the Railway Undertaking to the General Revenues Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Both 1 & 2
- Q. Modified lower quadrant signaling may be introduced only with section of
A)GM
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. Continuity test is to be done.
A)_____00
B)0
C)0
D)00------
Answer: 00------
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. Speed of the last train during ACF on double line is ________ km/h.
A)20/15/Walking
B)25/10/Walking
C)20/10/Walking
D)None of these
Answer: 25/10/Walking
- Q. At which of the following places Diesel Component Works is established?
A)Perambur
B)Jamshedpur
C)Patiala
D)Varanasi
Answer: Patiala
- Q. Corridor block is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Consider the following sectors: 1)Plantation Sector 2)Mining and Exploration of Metal 3)Railway Infrastructure In which of the above, government has permitted 100% FDI through automatic route?
A)2 & 3 Only
B)1 & 2 Only
C)3 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Trap indicator is provided to indicate ________.
A)Provision Switch
B)Indication Switch
C)Derailing switch
D)None of these
Answer: Derailing switch
- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. Patrolman becoming overdue during night.
A)40 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 10 kmph
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
A)300/400
B)500/600
C)400/500
D)None of these
Answer: 500/600
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. India’s first rail auto hub will be located in:
A)Delhi
B)Kolkata
C)Chennai
D)New Delhi
Answer: Chennai
- Q. Which Zone is the largest in Indian Railways?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Eastern Railway
- Q. Adequate distance mentioned in the automatic block system is ________ meters.
A)105
B)110
C)120
D)115
Answer: 120
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State