Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. During single line working of DL the speed of the first train is ________ kmph
    A)15
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Which of the following is the largest railway junction in India?
    A)Mathura
    B)Delhi
    C)Bhatinda
    D)Allahabad
    Answer: E
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
    A)Central Reserve Police Force
    B)Assam Rifles
    C)National Security Guard
    D)Sashastra Seema Bal
    Answer: National Security Guard
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. During hand shunting only ________ Bogies can be hand shunted.
    A)3
    B)1
    C)2
    D)None of these
    Answer: 1
  • Q. In which institution the training of electric work is being given?
    A)Railway Staff College
    B)Indian Railways Institute of Mechanical and Electrical Engineering
    C)Indian Railways Institute of Electrical Engineering
    D)Indian Railways Institute of Civil Engineering
    Answer: Indian Railways Institute of Electrical Engineering
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. What is the position of the Indian Railway in the world according to the length of rail lines?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Fourth
  • Q. Maximum speed of B’ class ODC is ________ km/h.
    A)60
    B)50
    C)40
    D)75
    Answer: 40
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. The banner flag is a ________
    A)Both of these
    B)Temporary stop signal
    C)Permanent stop signal
    D)None of these
    Answer: Temporary stop signal
  • Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
    A)Authority
    B)Private Number
    C)Cuation Number
    D)None of these
    Answer: Private Number
  • Q. Station Master shall give line clear with ________ while granting line clear.
    A)Calling-on
    B)Shunt signal
    C)Private No.
    D)None of these
    Answer: Private No.