More Questions on Indian Railway
- Q. How many minimum BP pressure is require in engine to charge Goods train?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. Loco and traffic running staff are eligible for ________ hours rest at Head quarters after running duty of less than 08 hours.
A)12 Hours
B)06 Hours
C)10 Hours
D)None of these
Answer: 12 Hours
- Q. Signals are normally located to the ________ side of the line.
A)Both
B)Right
C)Left
D)None of these
Answer: Left
- Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective
B)Caution
C)Cautiously
D)None of these
Answer: Cautiously
- Q. Calling on signal shows ________ light in off position in two aspect signalling system.
A)Green
B)White
C)RED
D)Yellow
Answer: Yellow
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI
B)CI
C)LI
D)TI
Answer: PWI
- Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
A)10
B)15
C)20
D)25
Answer: 10
- Q. The number of private number sheet is ________.
A)T/99 D
B)T/99 F
C)T/99 A
D)T/99 E
Answer: T/99 F
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________
A)15/6
B)15/8
C)15/4
D)15/2
Answer: 15/8
- Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
A)North Korea
B)Japan
C)South Korea
D)China
Answer: Japan
- Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
A)5 kmph
B)3 kmph
C)4 kmph
D)6 kmph
Answer: 5 kmph
- Q. Flasher light is of ________ colour.
A)Green
B)Red
C)Amber
D)None of these
Answer: Amber
- Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm
B)60 mm
C)70 mm
D)50 mm
Answer: 50 mm
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
A)Counter circuit
B)Track circuit/axle counter
C)Circuit
D)None of these
Answer: Track circuit/axle counter
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. WTT will be issued ________.
A)Three in Year
B)Once in a Year
C)Two in a Year
D)None of these
Answer: Once in a Year
- Q. Kandaghat, a heritage railway station made entirely of wood and built by the British in 1903 was destroyed in the fire. In which state this Railway Station was located ?
A)Himachal Pradesh
B)Gujarat
C)Maharastra
D)Jammu & Kashmir
Answer: Himachal Pradesh
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State