More Questions on Indian Railway
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. Distant signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Permissive
- Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 2
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light
- Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
A)2 gangman
B)JE(Pway)
C)One gangman
D)None of these
Answer: JE(Pway)
- Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: 10 kmph
- Q. Signals are treated as ________ if connected points become defective.
A)Both
B)Defective
C)Restricted
D)None of these
Answer: Defective
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Material train is a ________ train.
A)Both
B)Departmental
C)Permanent
D)None of these
Answer: Departmental
- Q. Station manager of a big station shall inspect the cabins at least once in ________.
A)Thrice in a week.
B)Once in a week
C)Twice in a week
D)None of these
Answer: Once in a week
- Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm
B)60 mm
C)70 mm
D)50 mm
Answer: 50 mm
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. What will be the prescribed form for DMT Block?
A)E/223
B)T/409
C)T/806
D)E/233
Answer: E/223
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. Train is to be passed through loop line.
A)30 kmph
B)15 kmph
C)25 kmph
D)Normal speed
Answer: 15 kmph
- Q. Shatabdi Express train was started in ________.
A)1990
B)1984
C)1988
D)1985
Answer: 1988
- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958
- Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
A)9
B)10
C)3
D)4
Answer: 10