- Q. To start a train from unsignalled line ________ authority is issued.
A)T/511
B)T/512
C)T/515
D)T/521
Answer: T/511
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. Maximum height above rail level for a low passenger platform in BG is
A)840 mm
B)455 mm
C)760 mm
D)None of these
Answer: 455 mm
- Q. Which state to have India’s first privately – run railway station?
A)Kerala
B)Tripura
C)Odisha
D)Madhya Pradesh
Answer: Madhya Pradesh
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points
- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
A)40
B)35
C)30
D)35
Answer: 30
- Q. 2 states of North East India will be connected through Broad Gauge. They are:
A)Meghalaya and Assam
B)Manipur and Meghalaya
C)Mizoram and Manipur
D)Mizoram and Arunachal Pradesh
Answer: Mizoram and Manipur
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. P marker is provided for a
A)Semaphore warner
B)Colour light distance
C)Semaphore distant
D)None of these
Answer: Colour light distance
- Q. In which institution the training of electric work is being given?
A)Railway Staff College
B)Indian Railways Institute of Mechanical and Electrical Engineering
C)Indian Railways Institute of Electrical Engineering
D)Indian Railways Institute of Civil Engineering
Answer: Indian Railways Institute of Electrical Engineering
- Q. The maximum speed of the assistance train to be sent on T/A 602
A)30 kmph
B)10 kmph
C)15 kmph
D)40 kmph
Answer: 15 kmph
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph
B)30 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
A)Maharashtra
B)Tamil Nadu
C)Himachal Pradesh
D)Meghalaya
Answer: Maharashtra
- Q. Not more than ________ persons including trollyman shall go on a trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. The validity of BCC is for ________ years
A)01 years
B)03 years
C)02 years
D)None of these
Answer: 03 years
- Q. Caution order is carried forward at stations on Monday at ________ hours.
A)12:00
B)10:00
C)11:00
D)09:00
Answer: 09:00
- Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600
B)500
C)400
D)800
Answer: 600
- Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)