Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Headquarters of which one among the following Railway Zones in India is situated at the highest elevation from the mean sea level?
    A)South Western Railway
    B)East Central Railway
    C)South Eastern Railway
    D)West Central Railway
    Answer: South Western Railway
  • Q. Interchange point of Central and Western railway is ________.
    A)Both
    B)Dadar
    C)Jalgaon
    D)None of these
    Answer: Both
  • Q. Guard of suburban train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)45
    C)30
    D)15
    Answer: 15
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. To start the train from a line with common starter, ________ authority is issued.
    A)T/512
    B)T/516
    C)T/517
    D)T/511
    Answer: T/512
  • Q. In which of the following cities, the first subway train was started?
    A)Kolkata
    B)Mumbai
    C)Delhi
    D)Chennai
    Answer: Kolkata
  • Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
    A)Habibganj railway station
    B)Farukhnagar railway station
    C)Safdarjung railway station
    D)Mumbai Central railway station
    Answer: Safdarjung railway station
  • Q. Which state government has recently signed MoU with Indian Railways to expand green cover?
    A)Maharashtra
    B)Kerala
    C)Uttar Pradesh
    D)Rajasthan
    Answer: Maharashtra
  • Q. DRM nominates ________ for each section to issue caution orders to train crew.
    A)Nil notice
    B)Caution notice station
    C)Notice
    D)None of these
    Answer: Caution notice station
  • Q. Number of the caution order is ________
    A)T/410
    B)T/409
    C)T/408
    D)None of these
    Answer: T/409
  • Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
    A)50 seconds
    B)120 seconds
    C)90 seconds
    D)None of these
    Answer: 120 seconds
  • Q. When a Train carrying passengers does not arrive within ________ minutes plus running time. The SM must take action.
    A)15
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. When water level is just above top of rail speed of electric locomotive shall apply ?
    A)15 kmph
    B)5 kmph
    C)10 kmph
    D)20 kmph
    Answer: 10 kmph
  • Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
    A)5
    B)3
    C)4
    D)6
    Answer: 3
  • Q. At the enroute, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
    A)T-1425
    B)T-806 +Caution order
    C)T/D 602 + T-511
    D)None of these
    Answer: T/D 602 + T-511
  • Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
    A)50 kmph
    B)15 kmph
    C)25 kmph
    D)75 kmph
    Answer: 15 kmph
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)