Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. Which of the following zones administers the Matheran Hill Railway?
    A)Central Railways
    B)Konkan Railways
    C)Western Railways
    D)Southern Railways
    Answer: Central Railways
  • Q. Nil Caution order number is ________
    A)T/C409
    B)T/A-409
    C)T/B-409
    D)None of these
    Answer: T/A-409
  • Q. ________ brake is not provided in the coach of passenger train.
    A)Minor
    B)Hand
    C)Non-hand
    D)None of these
    Answer: Hand
  • Q. The speed of lorry shall not exceed
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Goods train without brake van shall not be run during ________.
    A)CCF
    B)BCF
    C)ACF
    D)None of these
    Answer: ACF
  • Q. In case of accident, siren is repeated at an interval of ________ minutes.
    A)20
    B)10
    C)15
    D)5
    Answer: 5
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
    A)Central India Railway
    B)Bombay Baroda Railway
    C)The Scindia Railway
    D)Great Indian Peninsula Railway
    Answer: Great Indian Peninsula Railway
  • Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
    A)12 hours
    B)04 hours
    C)08 hours
    D)16 hours
    Answer: 16 hours
  • Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
    A)0000-000
    B)000000-0000
    C)00000-0
    D)0000-0000
    Answer: 000000-0000
  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. Normally maximum gradient in station yards in BG is (at present)
    A)1 in 1000
    B)1 in 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400
  • Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
    A)Yellow
    B)RED
    C)Green
    D)None of these
    Answer: RED
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
    A)100 meter
    B)200 meter
    C)250 meter
    D)400 meters and more
    Answer: 400 meters and more
  • Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. In automatic block area SL. The LSS shall not be taken of unless the line is clear upto
    A)Automatic stop signal+180 Meters
    B)next automatic stop signal
    C)Automatic stop signal+120 Meters
    D)None of these
    Answer: next automatic stop signal