Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Written authority received to pass approach stop signal.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. Who invented the railway engine?
    A)James Watt
    B)Charles Babbage
    C)Isaac Newton
    D)George Stephenson
    Answer: George Stephenson
  • Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
    A)400 meters
    B)270 meters
    C)90 meters
    D)None of these
    Answer: 90 meters
  • Q. When was the Jammu City appeared on the map of Indian Railway?
    A)1967
    B)1956
    C)1963
    D)1965
    Answer: 1965
  • Q. Which is the fastest train in India?
    A)Duronto Express
    B)Rajdhani Express
    C)Shatabdi Express
    D)Tejas Express
    Answer: E
  • Q. The maximum distance covered by a patrol man should not normally exceed
    A)15 KM
    B)10 KM a day
    C)12 KM
    D)None of these
    Answer: 10 KM a day
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351
  • Q. Maximum speed of B’ class ODC is ________ km/h.
    A)60
    B)50
    C)40
    D)75
    Answer: 40
  • Q. Yearly coaching stock census is taken on ________.
    A)31st January
    B)31st December
    C)31st October
    D)31st March
    Answer: 31st October
  • Q. The headquarters of North – East Frontier Railway (NFR) is
    A)Chennai
    B)Kolkata
    C)Maligaon (Guwahati)
    D)Gorakhpur
    Answer: Maligaon (Guwahati)
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4
  • Q. Introduced ________ in Konkan Railway to help old and disabled passengers.
    A)Divyang Express
    B)Sahayak Express
    C)Viklang Seva Express
    D)Sarathi Seva
    Answer: Sarathi Seva
  • Q. The Ministry of Railways has signed MoU with which Union Ministry to augment services in Railway hospitals?
    A)Ministry of Social Justice and Empowerment
    B)Ministry of Women and Child Development
    C)Ministry of Drinking Water and Sanitation
    D)Ministry of AYUSH
    Answer: Ministry of AYUSH
  • Q. Depot in-charge is responsible to test the detonators once in ________.
    A)Year
    B)Monthly
    C)Weekly
    D)None of these
    Answer: Year
  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. For work of long duration, the stop indicator must be erected at not less than
    A)40
    B)30
    C)50
    D)45
    Answer: 30
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10

Leave a Comment