Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Hand shunting is performed at speed not exceeding
    A)05 kmph
    B)10 kmph
    C)08 kmph
    D)None of these
    Answer: 05 kmph
  • Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
    A)60
    B)40
    C)50
    D)45
    Answer: 45
  • Q. Permission of ________ is required to work the material train in the night.
    A)DRM
    B)AOM
    C)DOM
    D)None of these
    Answer: DRM
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. The zone with the minimum length is
    A)South - East Railway
    B)North - Eastern Railway
    C)North - Eastern Frontier Railway
    D)South - Central Railway
    Answer: North - Eastern Frontier Railway
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. The speed of a Trolley is
    A)15 kmph
    B)20 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Where did Chapman form the committee?
    A)Edimbara
    B)Glassgo
    C)London
    D)Lords
    Answer: London
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. Track maintenance machine is permitted to work during
    A)Day clear weather
    B)Day
    C)Day and Night
    D)None of these
    Answer: Day and Night
  • Q. How much block overlap is required at the station equipped with MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Goods train without brake van shall not be run during ________.
    A)CCF
    B)BCF
    C)ACF
    D)None of these
    Answer: ACF
  • Q. On which time the departure signal shall be taken off for run through train passing via loop line?
    A)After entering in loop line
    B)Before entering at station
    C)After stopped at station
    D)Before 10 minutes from expected arrival
    Answer: Before 10 minutes from expected arrival
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
    A)Single white
    B)Yellow
    C)Two White parallel
    D)No light
    Answer: No light
  • Q. Goods warning board will be provided from FSS in BG at
    A)560 meters
    B)1400 meters
    C)1000 meters
    D)None of these
    Answer: 1400 meters
  • Q. To attach the 12 coach EMU rake, ________ units are to be attached.
    A)8
    B)5
    C)6
    D)4
    Answer: 4
  • Q. ________ number of Guard wagons shall be attached in either direction of explosive wagons.
    A)3 - 3
    B)1 - 1
    C)2 - 2
    D)4 - 4
    Answer: 2 - 2