Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. The time taken for formation of a goods train in flat yard is
    A)3 kmph
    B)2 hrs
    C)1 hr
    D)None of these
    Answer: 2 hrs
  • Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
    A)Both
    B)Outer Most facing Points
    C)Inner Most facing signal
    D)None of these
    Answer: Outer Most facing Points
  • Q. In case of accident, siren is repeated at an interval of ________ minutes.
    A)20
    B)10
    C)15
    D)5
    Answer: 5
  • Q. IBP is a Station in which class?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. The speed of cycle/moped trolley is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
    A)Maharashtra
    B)Tamil Nadu
    C)Himachal Pradesh
    D)Meghalaya
    Answer: Maharashtra
  • Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
    A)Chittranjan
    B)Varanasi
    C)Perambur
    D)Patiala
    Answer: Chittranjan
  • Q. Hand shunting of wagons is totally prohibited in gradients
    A)1 in 260
    B)1 in 400 OR Steeper
    C)ST 1- IN 400
    D)None of these
    Answer: 1 in 400 OR Steeper
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these
  • Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
    A)Gujarat
    B)Kerala
    C)Tamil Nadu
    D)Andhra Pradesh
    Answer: Kerala
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. In which year the practice of presenting the railway budget separate from the general budget (or vice versa in true sense) started in India?
    A)1925
    B)1920
    C)1924
    D)1930
    Answer: 1924
  • Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
    A)90 meters
    B)180 meters
    C)120 meters
    D)Zero
    Answer: Zero
  • Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
    A)Habibganj railway station
    B)Farukhnagar railway station
    C)Safdarjung railway station
    D)Mumbai Central railway station
    Answer: Safdarjung railway station
  • Q. During serious accident, ________ will be the in-charge of control office.
    A)Sr. DOM
    B)DOM
    C)AOM
    D)None of these
    Answer: Sr. DOM
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. What is the position of the Indian Railway under the zonal system?
    A)Third
    B)First
    C)Second
    D)Forth
    Answer: Second
  • Q. BSLB determines the limits of Station section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section