More Questions on Indian Railway
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. Indian Railway will publish new Magazine in all regional language. The name of that Magazine is:
A)Rail Prakashan
B)Rail Line
C)Big Thing, Big Way
D)Rail Bandhu
Answer: Rail Bandhu
- Q. Notice station notified in?
A)SR
B)SWR
C)GR
D)Working Time Table
Answer: Working Time Table
- Q. A platform surrounded by rail lines from all the four sides, is called
A)Island platform
B)Dock platform
C)Passenger platform
D)Goods platform
Answer: Island platform
- Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal
B)Calling-on Signal
C)Home Signal
D)None of these
Answer: Home Signal
- Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
A)300/400
B)500/600
C)400/500
D)None of these
Answer: 500/600
- Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
A)Warner, Home
B)Outer, Home
C)Distant, Home
D)Distant, Home, Starter
Answer: Distant, Home
- Q. Which of the following zonal headquarters – city combination is incorrect?
A)East Central - Hajipur
B)South East Central - Bilaspur
C)North Western - Jodhpur
D)West Central - Jabalpur
Answer: North Western - Jodhpur
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. Number of the Nil caution order is ________.
A)T/C 410
B)T/A 409
C)T/B 408
D)None of these
Answer: T/A 409
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. The White light in point indicator indicates?
A)Pass run through
B)Loop line is set
C)Main line set
D)All is right
Answer: Main line set
- Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
A)Both
B)UP
C)Falling
D)None of these
Answer: UP
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. Guard’s assistance is required by LP.
A)0
B)0
C)0
D)____
Answer: 0
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State