Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Guard’s assistance is required by LP.
    A)0
    B)0
    C)0
    D)____
    Answer: 0
  • Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
    A)15
    B)20
    C)25
    D)30
    Answer: 30
  • Q. Elphinstone Road suburban railway station which was recently renamed as Prabhadevi is situated in?
    A)Tamil Nadu
    B)Mumbai
    C)Bengaluru
    D)New Delhi
    Answer: Mumbai
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. Shunt signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: First stop signal
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these
  • Q. Point indicator is provided to indicate ________.
    A)Both
    B)Points
    C)Bar
    D)None of these
    Answer: Points
  • Q. Notice station caution order No. is ________
    A)T/C-409
    B)T/409
    C)T/B-409
    D)None of these
    Answer: T/409
  • Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
    A)8
    B)10
    C)5
    D)25
    Answer: 25
  • Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1 & 2
    C)Only 1, 2 & 3
    D)1, 2, 3 & 4
    Answer: Only 1, 2 & 4
  • Q. Hand shunting of vehicles in gradients ________ is totally prohibited
    A)1 In 100 or steeper
    B)1 in 400 or Steeper
    C)1 in 200 or steeper
    D)None of these
    Answer: 1 in 400 or Steeper
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B
  • Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
    A)20 days
    B)10 days
    C)15 days
    D)None of these
    Answer: 15 days
  • Q. When was the Central Railway established?
    A)14th April 1951
    B)5th Nov 1951
    C)14th Nov 1951
    D)16th August, 1951
    Answer: 5th Nov 1951
  • Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
    A)Defective
    B)Caution
    C)Cautiously
    D)None of these
    Answer: Cautiously
  • Q. In case of ACP, Guard of EMU shall give ________ bell.
    A)0-00-00
    B)00-00-00
    C)00-0-00
    D)000-0-00
    Answer: 00-0-00
  • Q. Which is the following pairs of regional Railways and their headquarters not true?
    A)South Railway - Chennai
    B)South-Central Railway - Secunderabad
    C)Central railway - Bhopal
    D)North Railway - New Delhi
    Answer: Central railway - Bhopal
  • Q. What will be the prescribed form for DMT Block?
    A)E/223
    B)T/409
    C)T/806
    D)E/233
    Answer: E/223
  • Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
    A)Block sectiond
    B)Next whole block section
    C)Back whole block section
    D)None of these
    Answer: Next whole block section