Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. It is a Python Rake.
    A)15 kmph
    B)60 kmph
    C)25 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Maximum speed of the train while unloading ballast is ________ km/h.
    A)6
    B)8
    C)4
    D)10
    Answer: 8
  • Q. Reference of ________ is written by the side of the Rule if the Rule is corrected.
    A)No. and Item No. Correction Slip
    B)Number Slip
    C)Item Number
    D)None of these
    Answer: No. and Item No. Correction Slip
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Railway staff collage is situated at ________.
    A)Chennai
    B)Vadodara
    C)Kanyakumari
    D)New Delhi
    Answer: Vadodara
  • Q. To start a train from unsignalled line ________ authority is issued.
    A)T/511
    B)T/512
    C)T/515
    D)T/521
    Answer: T/511
  • Q. When four wheeler attached, speed of passenger train will be ________ km/h.
    A)85
    B)80
    C)75
    D)90
    Answer: 75
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. Consider the following sectors: 1)Plantation Sector 2)Mining and Exploration of Metal 3)Railway Infrastructure In which of the above, government has permitted 100% FDI through automatic route?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
    A)Stop his train and find the cause
    B)Proceed further with same speed up to next station
    C)Proceed further with normal speed
    D)None of these
    Answer: Stop his train and find the cause
  • Q. Which of the following is the easternmost division of the Indian Railways?
    A)Rangiya
    B)Tinsukia
    C)Lumding
    D)Katihar
    Answer: Tinsukia
  • Q. Stop signal is to be passed in On position.
    A)T-806
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(3b)
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. The headquarters of South – Central Railways is situated at
    A)Secunderabad
    B)Mumbai (CST)
    C)Chennai
    D)Mumbai (Central)
    Answer: Secunderabad
  • Q. Who of the following is known for having designed the first railway timetables?
    A)George Bradshaw
    B)George Bradman
    C)George Bernard Shaw
    D)George Brummel
    Answer: George Bradshaw
  • Q. Material train is a ________ train.
    A)Both
    B)Departmental
    C)Permanent
    D)None of these
    Answer: Departmental
  • Q. When was the first underground railway (Metro Railway) started?
    A)1984
    B)1982
    C)1989
    D)1992
    Answer: 1984
  • Q. In token territory, ________ is authority for shunting up to FSS.
    A)T/806
    B)Shunt Mental Token+T/806
    C)Shunt Mental
    D)None of these
    Answer: Shunt Mental Token+T/806