Q. The wagon containing ISMD load shall be attached.

Correct Answer

Next to Engine

More Questions on Indian Railway

  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. What will be the maximum speedof train in case of failure of headlight of engine?
    A)60 kmph
    B)30 kmph
    C)40 kmph
    D)Normal speed
    Answer: 40 kmph
  • Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
    A)Germany
    B)Sweden
    C)Russia
    D)Italy
    Answer: Germany
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
    A)DOM
    B)ADRM/Sr.DSO/DSO
    C)Sr.DOM
    D)None of these
    Answer: ADRM/Sr.DSO/DSO
  • Q. In automatic block system SL, the signal that can be dispensed with is
    A)Automatic Stop signal
    B)Home
    C)Starter
    D)None of these
    Answer: Automatic Stop signal
  • Q. If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
    A)Received train
    B)Through
    C)Train parted
    D)None of these
    Answer: Train parted
  • Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
    A)139
    B)144
    C)123
    D)119
    Answer: 139
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
    A)50 seconds
    B)120 seconds
    C)90 seconds
    D)None of these
    Answer: 120 seconds
  • Q. In token territory, ________ is authority for shunting up to FSS.
    A)T/806
    B)Shunt Mental Token+T/806
    C)Shunt Mental
    D)None of these
    Answer: Shunt Mental Token+T/806
  • Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
    A)75 kmph
    B)140 kmph
    C)160 kmph
    D)15 kmph
    Answer: 15 kmph
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
    A)Sutlej
    B)Chenab
    C)Jhelum
    D)Indus
    Answer: Chenab
  • Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 3 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
    A)One short
    B)Two short
    C)Three short
    D)Noen of these
    Answer: Two short
  • Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
    A)Block sectiond
    B)Next whole block section
    C)Back whole block section
    D)None of these
    Answer: Next whole block section

Leave a Comment