Q. The speed of a Trolley is

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. Visibility test object is placed at a distance of ________ meters from the station building.
    A)180
    B)108
    C)100M
    D)200
    Answer: 180
  • Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. For Block Back form ________ To be issued on DL.
    A)T/B-806+PN
    B)T/806+PN
    C)T/A806+PN
    D)None of these
    Answer: T/806+PN
  • Q. Block back are used at?
    A)Single/Double line both
    B)On Single line
    C)On Double line
    D)None of these
    Answer: Single/Double line both
  • Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
    A)ST 1-800
    B)ST 1-600
    C)ST 1-700
    D)None of these
    Answer: ST 1-600
  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
    A)Authority
    B)Private Number
    C)Cuation Number
    D)None of these
    Answer: Private Number
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
    A)Source of raw material and production centers
    B)Source of raw material and export centers
    C)Source of raw material and ports
    D)Source of raw material and markets
    Answer: Source of raw material and production centers
  • Q. Traffic gates are those located between ________.
    A)First signal
    B)Outermost stop signal
    C)Stop signal
    D)None of these
    Answer: Outermost stop signal
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)30 kmph
    Answer: 10 kmph
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
    A)Two
    B)Four
    C)Three
    D)Any one
    Answer: Three
  • Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
    A)100 meter
    B)200 meter
    C)250 meter
    D)400 meters and more
    Answer: 400 meters and more
  • Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
    A)1500 meters
    B)200 meters
    C)1000 meters
    D)2000 meters
    Answer: 1000 meters
  • Q. When was the nationalization of Indian Railways done?
    A)1951
    B)1952
    C)1950
    D)1954
    Answer: 1950
  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph

Leave a Comment