More Questions on Indian Railway
- Q. Which of the gauges is used in the hilly areas?
A)Narrow gauge
B)Broad gauge
C)Meter gauge
D)Special gauge
Answer: Narrow gauge
- Q. Approved special instructions are issued by ________.
A)PCOM
B)CRS
C)MT
D)None of these
Answer: CRS
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. When ISMD attached train is allowed to run through on PF line the speed must be
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. At the starting station, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
A)Only 1 & 3
B)Only 1
C)Only 1 & 2
D)Only 1, 3 & 4
Answer: Only 1
- Q. EMU trains of harbour line has ________ number of wooden wedges.
A)6
B)2
C)4
D)8
Answer: 4
- Q. Booked speed of a train is ________ percent less than maximum permissible speed
A)15
B)5
C)10
D)20
Answer: 10
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
A)Rail Wheel Factory
B)Modern Coach Factory
C)Integral Coach Factory
D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
- Q. Load infringing standard moving dimensions (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
A)Maharashtra
B)Tamil Nadu
C)Himachal Pradesh
D)Meghalaya
Answer: Maharashtra
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. The headquarters of Northern Railway is at
A)Gorakhpur
B)New Delhi
C)Guwahati
D)Mumbai (CST)
Answer: New Delhi
- Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective
B)Restricted
C)Most restricted
D)Noe of these
Answer: Most restricted