Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph B)140 kmph C)160 kmph D)15 kmph
Answer: 15 kmph
Q. Shunting to be done in D/L block section
A)T-806 B)PLCT C)T-369(3b) D)Simple memo
Answer: T-806
Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20 B)10 C)15 D)None of these
Answer: 15
Q. Length of a BG ICF Coach is
A)21.337 meters B)22.089 meters C)21.494 meters D)None of these
Answer: 21.337 meters
Q. BSLB determines the limits of block section and ________ .
A)Station Limit B)Block Section C)Station Section D)None of these
Answer: Station Section
Q. By whom General Rule is prepared?
A)PCOM B)Railway Board C)Zonal Railway D)GM
Answer: Railway Board
Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
A)20 B)10 C)15 D)25
Answer: 10
Q. Modified lower quadrant signaling may be introduced only with section of
A)GM B)Railway Board C)CRS D)None of these
Answer: CRS
Q. D class stations are called as ________.
A)Station Limit B)Halt Station C)Class station D)None of these
Answer: Halt Station
Q. Isolation shall be provided at an interlocked station when the speed is
A)Above 50 kmph B)50 kmph C)75 kmph D)None of these
Answer: Above 50 kmph
Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third B)First C)Second D)Fourth
Answer: Fourth
Q. When was the first train steamed off in India?
A)1875 B)1848 C)1853 D)1880
Answer: 1853
Q. A material train may be divided outside station limit during emergency under the supervision of ________.