More Questions on Indian Railway
- Q. Distant signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Permissive
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
A)Automatic stop signal+180 Meters
B)Next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: Next automatic stop signal
- Q. While pushing back, train shall be stopped at ________ stop signal.
A)Slip
B)Outermost
C)Rear most
D)None of these
Answer: Outermost
- Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third
B)First
C)Second
D)Fourth
Answer: Fourth
- Q. Which state to have India’s first privately – run railway station?
A)Kerala
B)Tripura
C)Odisha
D)Madhya Pradesh
Answer: Madhya Pradesh
- Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
A)Madhya Pradesh
B)Tamil Nadu
C)West Bengal
D)Punjab
Answer: West Bengal
- Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days
B)10 days
C)15 days
D)None of these
Answer: 15 days
- Q. What does the Slip siding protects?
A)Block Section
B)Station Section
C)Station Limit
D)Siding
Answer: Block Section
- Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
A)South Western Railway
B)North Eastern Railway
C)South Central Railway
D)North Central Railway
Answer: South Central Railway
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. What is the name of the first train of Indian Railways handed over to private players for operation?
A)Karnataka Express
B)Tejas Express
C)Shatabdi Express
D)Duronto Express
Answer: Tejas Express
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
A)15
B)20
C)25
D)30
Answer: 30
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports