More Questions on Indian Railway
- Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
A)RailSilver
B)RailSagar
C)RailCloud
D)RailBharat
Answer: RailCloud
- Q. “C” class ODC is run with the permission of ________.
A)Head Quarter
B)DOM
C)CRS
D)None of these
Answer: CRS
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. During emergency, in the absence of tail board ________ can be used with the DRM.
A)Yellow flag
B)GREAN FLAG
C)RED FLAG
D)None of these
Answer: RED FLAG
- Q. When water touches danger level mark, C.O. to be issued for speed – during day
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
A)National Academy of Indian Railways
B)Indian Railway Institute of Signal Engineering and Telecommunication
C)Research Designs and Standards Organisation
D)Indian Railway Service of Electrical Engineers
Answer: Research Designs and Standards Organisation
- Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
A)Save collision
B)Violation of block rules
C)Passingn danger signal
D)All of above
Answer: All of above
- Q. A material train may be divided outside station limit during emergency under the supervision of ________.
A)Driver
B)Guard
C)PWI
D)None of these
Answer: PWI
- Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
A)85
B)60
C)75
D)90
Answer: 90
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
A)CSO
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad
B)Kolkata
C)Secunderabad
D)Gorakhpur
Answer: Secunderabad
- Q. Signals are normally located to the ________ side of the line.
A)Both
B)Right
C)Left
D)None of these
Answer: Left
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. when form T/D 912 is issued the driver shall not exceed the speed
A)25 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km
B)4300 Km
C)3700 Km
D)5298 km
Answer: 3700 Km
- Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
A)Counter circuit
B)Track circuit/axle counter
C)Circuit
D)None of these
Answer: Track circuit/axle counter
- Q. General Manager is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)Finance Ministry
Answer: Railway Board
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State