More Questions on Indian Railway
- Q. What will be maximum speed during shunting of goods train?
A)25 kmph
B)8 kmph
C)15 kmph
D)30 kmph
Answer: 15 kmph
- Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)Only 3
Answer: Only 3
- Q. Reminder Caution Order is?
A)T/B409
B)T/409
C)T/A409
D)None of these
Answer: T/B409
- Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
A)100 meter
B)200 meter
C)250 meter
D)400 meters and more
Answer: 400 meters and more
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. Indian Railway Act means ________.
A)Part 23 of 1989
B)Part 22 of 1989
C)Part 24 of 1989
D)Part 21 of 1989
Answer: Part 24 of 1989
- Q. The White light in point indicator indicates?
A)Pass run through
B)Loop line is set
C)Main line set
D)All is right
Answer: Main line set
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters
- Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3
B)1 2 3 4
C)1 2 4 3
D)3 1 4 2
Answer: 4 2 1 3
- Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
A)1000 meters
B)400 meters
C)600 meters
D)None of these
Answer: 600 meters
- Q. During TFC in single line section what authority to proceed will be served to driver of Dn train during return.
A)TH-602
B)T/A-602
C)TG-602
D)TB-602
Answer: TH-602
- Q. Number of train signal register of single line is ________.
A)T/166 B
B)T/136 A
C)T/137 B
D)T/135
Answer: T/137 B
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. What is shunting order number?
A)T-806
B)T-609
C)T/A-602
D)T-409
Answer: T-806
- Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
A)In Break van
B)At Facing point
C)On Engine
D)At Anyplace
Answer: In Break van
- Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
A)600 meters
B)400 meters
C)500 meters
D)800 meters
Answer: 600 meters
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4
B)ACC2
C)ACC3
D)None of these
Answer: ACC4
- Q. What will be distance between fire affected train and rest of the train ?
A)50 meters
B)25 meters
C)45 meters
D)100 meters
Answer: 45 meters
- Q. No. of vehicles that can be attached to goods trains in rear of BV is
A)2 bogie or its equivalent
B)2 bogies
C)1 bogies
D)None of these
Answer: 2 bogie or its equivalent
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State