Q. The speed of a Trolley is

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
    A)1500 meters
    B)200 meters
    C)1000 meters
    D)2000 meters
    Answer: 1000 meters
  • Q. Elphinstone Road suburban railway station which was recently renamed as Prabhadevi is situated in?
    A)Tamil Nadu
    B)Mumbai
    C)Bengaluru
    D)New Delhi
    Answer: Mumbai
  • Q. Which of the following stations was formerly known as Victoria Terminus?
    A)Lokmanya Tilak Terminus
    B)Churchgate Railway Station
    C)Mumbai Central
    D)Chhatrapati Shivaji Terminus
    Answer: Chhatrapati Shivaji Terminus
  • Q. A jumper is remote control and is used for ________.
    A)Control on Light, Fan etc.
    B)Light
    C)Fans
    D)None of these
    Answer: Control on Light, Fan etc.
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. Patrolman becoming overdue during night.
    A)40 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 10 kmph
  • Q. On which authority relief train shall be dispatched for obstructed block section?
    A)On memo
    B)PLCT
    C)T/A602
    D)None of these
    Answer: T/A602
  • Q. Track maintenance machine is permitted to work during
    A)Day clear weather
    B)Day
    C)Day and Night
    D)None of these
    Answer: Day and Night
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
    A)T/369(B)
    B)T/369(3b)
    C)T/369(2b)
    D)None of these
    Answer: T/369(2b)
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. After how much time Any goods train shall be treated as overdue train?
    A)After 20 minutes
    B)After 10 minutes
    C)After 15 minutes
    D)After 25 minutes
    Answer: After 20 minutes
  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. In which of the following cities is the National Rail Museum located ?
    A)Hyderabad
    B)Mumbai
    C)New Delhi
    D)Chennai
    Answer: New Delhi
  • Q. passing through station during day when running without brakevan and tail board.
    A)25 kmph
    B)10 kmph
    C)20 kmph
    D)Normal speed
    Answer: 20 kmph
  • Q. At A class station, Neutral zone is the portion between starter and ________ signal.
    A)Home signal
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
    A)25
    B)20
    C)15
    D)None of these
    Answer: 25

Leave a Comment