More Questions on Indian Railway
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25
B)20
C)15
D)30
Answer: 25
- Q. Station section available in which Class of Station?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: B-Class
- Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg
B)6 kg
C)10 kg
D)None of these
Answer: 7 - 10 kg
- Q. Hand shunting of wagons is totally prohibited in gradients
A)1 in 260
B)1 in 400 OR Steeper
C)ST 1- IN 400
D)None of these
Answer: 1 in 400 OR Steeper
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. When was the first train in India started?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. Presentation of the first ever railway budget in India held in
A)1925
B)1853
C)1888
D)1905
Answer: 1925
- Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
A)5
B)15
C)20
D)None of these
Answer: 15
- Q. Your train is first during TSL on double line.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 25 kmph
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
A)Red hand signal
B)Yellow signal
C)Green signal
D)None of these
Answer: Red hand signal
- Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below:
A)1, 2, 3, 4 & 5
B)Only 2, 3 & 4
C)Only 2, 3, 4, 5
D)Only 2, 3 & 5
Answer: 1, 2, 3, 4 & 5
- Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
A)15 km
B)8 km
C)10 km
D)20 km
Answer: 15 km
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
A)600 meters
B)400 meters
C)500 meters
D)800 meters
Answer: 600 meters
- Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph
B)140 kmph
C)160 kmph
D)15 kmph
Answer: 15 kmph
- Q. During TFC in single line section what authority to proceed will be served to driver of Dn train during return.
A)TH-602
B)T/A-602
C)TG-602
D)TB-602
Answer: TH-602