Q. The speed of a Trolley is

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. Which of the following is the easternmost division of the Indian Railways?
    A)Rangiya
    B)Tinsukia
    C)Lumding
    D)Katihar
    Answer: Tinsukia
  • Q. A jumper is remote control and is used for ________.
    A)Control on Light, Fan etc.
    B)Light
    C)Fans
    D)None of these
    Answer: Control on Light, Fan etc.
  • Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
    A)20
    B)25
    C)15
    D)None of these
    Answer: 25
  • Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
    A)Chittranjan
    B)Varanasi
    C)Perambur
    D)Patiala
    Answer: Chittranjan
  • Q. The largest national enterprise of India is
    A)Airways
    B)Indian Railway
    C)Indian Shipyard
    D)Waterways
    Answer: Indian Railway
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Duplicate signal is ________.
    A)Co-acting signal
    B)Home Signal
    C)Warner Signal
    D)None of these
    Answer: Co-acting signal
  • Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
    A)Central India Railway
    B)Bombay Baroda Railway
    C)The Scindia Railway
    D)Great Indian Peninsula Railway
    Answer: Great Indian Peninsula Railway
  • Q. How many institutions do give suggestions for railways technology?
    A)Three
    B)One
    C)Two
    D)Four
    Answer: Two
  • Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
    A)T/A-912
    B)T/B-912
    C)T/C-912
    D)None of these
    Answer: T/B-912
  • Q. Maximum of ________ cranes can be attached in a passenger train.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: 10 kmph
  • Q. Booked speed is fixed by ________.
    A)Sr. DOM
    B)COM
    C)CCM
    D)None of these
    Answer: COM
  • Q. In which of the following cities, the first subway train was started?
    A)Kolkata
    B)Mumbai
    C)Delhi
    D)Chennai
    Answer: Kolkata
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. How many stations to be redeveloped through PPP?
    A)350
    B)100
    C)200
    D)600
    Answer: 600
  • Q. Written authority received to pass approach stop signal.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. At which of the following places Diesel Component Works is established?
    A)Perambur
    B)Jamshedpur
    C)Patiala
    D)Varanasi
    Answer: Patiala
  • Q. For which time Guard rough journal must be kept safe?
    A)Upto 3 Years
    B)Upto 1 Year
    C)Upto 2 Years
    D)Upto 6 Months
    Answer: Upto 3 Years

Leave a Comment