More Questions on Indian Railway
- Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
A)25
B)15
C)20
D)None of these
Answer: 15
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. What is the name of the first train of Indian Railways handed over to private players for operation?
A)Karnataka Express
B)Tejas Express
C)Shatabdi Express
D)Duronto Express
Answer: Tejas Express
- Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph
B)2 kmph
C)2.5 kmph
D)3.5 kmph
Answer: 2.5 kmph
- Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. Not more than ________ persons including trollyman shall go on a trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. What is the massage of 000 (three short) whistle sound by loco pilot?
A)Train parting
B)Signal Approaching
C)Train out of control
D)Unable to proceed
Answer: Train out of control
- Q. How many members did the railway board had?
A)4
B)3
C)5
D)8
Answer: 4
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters
- Q. Palace on Wheels train was inaugurated in which year?
A)1982
B)1988
C)1972
D)1965
Answer: 1982
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. Signal passed at danger is treated as ________ accident.
A)Indirection
B)Indicative
C)Direct
D)None of these
Answer: Indicative
- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958
- Q. What is the maximum speed of 140 ton diesel hydraulic crane?
A)140 kmph
B)75 kmph
C)100 kmph
D)160 kmph
Answer: 75 kmph
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. How many copies of caution order shall be prepared for a train provided with banking engine?
A)5
B)3
C)4
D)None of these
Answer: 5
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State