Q. The number of private number sheet is ________.
A
T/99 D
B
T/99 F
C
T/99 A
D
T/99 E
Correct Answer
T/99 F
More Questions on Indian Railway
Q. Metro Railway is functioning in which of the following Indian States?
A)West Bengal B)Gujarat C)Maharashtra D)Tamil Nadu
Answer: West Bengal
Q. In double Distant signalling, outermost signal is called as ________.
A)Stop B)Distant C)Call-on D)None of these
Answer: Distant
Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W B)Engineering C)Mechanical D)None of these
Answer: Mechanical
Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours B)04 hours C)08 hours D)16 hours
Answer: 16 hours
Q. If the advanced starter and IBS are defective, SM shall issue T/369(3b) authority with private number of ________ station to pass both advanced starter and IBS.
A)Both B)Back C)Next D)None of these
Answer: Next
Q. Rake link book-let is prepared by COM and ________.
A)DPO B)CPTM C)CPO D)None of these
Answer: CPTM
Q. What will be maximum speed during shunting of goods train?
A)25 kmph B)8 kmph C)15 kmph D)30 kmph
Answer: 15 kmph
Q. When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.
A)10 B)5 C)7 D)None of these
Answer: 5
Q. First Train started in India?
A)1853 B)1851 C)1852 D)1854
Answer: 1853
Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
Q. When water level is just above top of rail speed of electric locomotive shall apply ?
A)15 kmph B)5 kmph C)10 kmph D)20 kmph
Answer: 10 kmph
Q. At the starting station, M/E train must have ________ % of brake power.
A)90 B)75 C)50 D)100
Answer: 100
Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16 B)20 C)12 D)10
Answer: 16
Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85 B)80 C)75 D)90
Answer: 75
Q. Termination indication board will be
A)Rectangular B)Square C)Round D)None of these
Answer: Round
Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
A)Yellow B)Red C)Green D)White
Answer: Green
Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20 B)10 C)15 D)None of these
Answer: 15
Q. The headquarters of North – Eastern railway is situated at
A)Gorakhpur B)Mumbai (CST) C)Guwahati D)New Delhi
Answer: Gorakhpur
Q. EMU trains of harbour line has ________ number of wooden wedges.
A)6 B)2 C)4 D)8
Answer: 4
Q. How many institutions do give suggestions for railways technology?