- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
A)Both
B)UP
C)Falling
D)None of these
Answer: UP
- Q. At least how far will the final detonator be used to defend the train in broad gauge?
A)820 meters
B)180 meters
C)600 meters
D)1220 meters
Answer: 1220 meters
- Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
A)50 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 15 kmph
- Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
A)45 meters beyond the obstruction
B)At 1st facing point of station
C)Facing point of concern line
D)No need
Answer: 45 meters beyond the obstruction
- Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________
A)15/6
B)15/8
C)15/4
D)15/2
Answer: 15/8
- Q. Signal failure advised to the driver through the station in rear will be inform
A)T/369(3b)
B)T/369
C)T/370
D)None of these
Answer: T/369
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
A)Both are true
B)Only 1 is true
C)Only 2 is true
D)Neither is true
Answer: Both are true
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. Shunting speed of 5 box wagons is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 2
- Q. The headquarters of North – Eastern railway is situated at
A)Gorakhpur
B)Mumbai (CST)
C)Guwahati
D)New Delhi
Answer: Gorakhpur
- Q. W/L board will be provided at not less than ________ metres from the gate.
A)600
B)400
C)500
D)800
Answer: 600
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: Normal
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and ________ respectively.
A)4.5 kg/cm2
B)4.1 kg/cm2
C)4.2 kg/cm2
D)4.7 kg/cm2
Answer: 4.7 kg/cm2
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM