Q. The number of private number sheet is ________.

Correct Answer

T/99 F

More Questions on Indian Railway

  • Q. Metro Railway is functioning in which of the following Indian States?
    A)West Bengal
    B)Gujarat
    C)Maharashtra
    D)Tamil Nadu
    Answer: West Bengal
  • Q. In double Distant signalling, outermost signal is called as ________.
    A)Stop
    B)Distant
    C)Call-on
    D)None of these
    Answer: Distant
  • Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical
  • Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
    A)12 hours
    B)04 hours
    C)08 hours
    D)16 hours
    Answer: 16 hours
  • Q. If the advanced starter and IBS are defective, SM shall issue T/369(3b) authority with private number of ________ station to pass both advanced starter and IBS.
    A)Both
    B)Back
    C)Next
    D)None of these
    Answer: Next
  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.
    A)10
    B)5
    C)7
    D)None of these
    Answer: 5
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
    A)Uttar Pradesh
    B)Odisha
    C)West Bengal
    D)Chhattisgarh
    Answer: Uttar Pradesh
  • Q. When water level is just above top of rail speed of electric locomotive shall apply ?
    A)15 kmph
    B)5 kmph
    C)10 kmph
    D)20 kmph
    Answer: 10 kmph
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
    A)16
    B)20
    C)12
    D)10
    Answer: 16
  • Q. When four wheeler attached, speed of passenger train will be ________ km/h.
    A)85
    B)80
    C)75
    D)90
    Answer: 75
  • Q. Termination indication board will be
    A)Rectangular
    B)Square
    C)Round
    D)None of these
    Answer: Round
  • Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. The headquarters of North – Eastern railway is situated at
    A)Gorakhpur
    B)Mumbai (CST)
    C)Guwahati
    D)New Delhi
    Answer: Gorakhpur
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4
  • Q. How many institutions do give suggestions for railways technology?
    A)Three
    B)One
    C)Two
    D)Four
    Answer: Two