Q. The number of private number sheet is ________.
A
T/99 D
B
T/99 F
C
T/99 A
D
T/99 E
Correct Answer
T/99 F
More Questions on Indian Railway
Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter B)01 meter C)02 meter D)04 meter
Answer: 01 meter
Q. Which of the following two countries have largest electrified railway network in the world?
A)Russia & China B)Russia & US C)US & China D)India & US
Answer: Russia & China
Q. What is the speed of second train on double line section running on T/A602?
A)10 kmph B)20 kmph C)15 kmph D)8 kmph
Answer: 8 kmph
Q. Maximum No. of ________ track machines can be sent for working in a block section.
A)25 B)20 C)15 D)30
Answer: 25
Q. During hand shunting only ________ Bogies can be hand shunted.
A)3 B)1 C)2 D)None of these
Answer: 1
Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days B)10 days C)15 days D)None of these
Answer: 15 days
Q. When was the construction work for the first Railway line Started?
A)1823 B)1821 C)1828 D)1830
Answer: 1821
Q. W/L board will be provided at not less than ________ metres from the gate.
A)600 B)400 C)500 D)800
Answer: 600
Q. Shunting speed of 5 box wagons is ________ km/h.
A)6 B)2 C)5 D)8
Answer: 2
Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph B)140 kmph C)160 kmph D)15 kmph
Answer: 15 kmph
Q. In which year Research, Design and Standard organization was established?
A)1959 B)1954 C)1957 D)1967
Answer: 1957
Q. On which authority relief train shall be dispatched for obstructed block section?
A)On memo B)PLCT C)T/A602 D)None of these
Answer: T/A602
Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10 B)25 C)20 D)None of these
Answer: 25
Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30 B)10 C)20 D)None of these
Answer: 30
Q. Under approved special instructions, Distant signal can be placed along with the
A)Both B)Last Stop C)First Stop D)None of these
Answer: Last Stop
Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third B)First C)Second D)Fourth
Answer: Second
Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
A)6.8 B)7.8 C)5.8 D)4.8
Answer: 4.8
Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600 B)500 C)400 D)800
Answer: 600
Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph B)30 kmph C)40 kmph D)None of these
Answer: 40 kmph
Q. Which of the following zones administers the Matheran Hill Railway?