Q. The number of private number sheet is ________.

Correct Answer

T/99 F

More Questions on Indian Railway

  • Q. What is the means of EA in WTT?
    A)Extra recovery time
    B)Extra allowances
    C)Engineering allowances
    D)None of these
    Answer: Engineering allowances
  • Q. Who has been appointed as the new Union Minister of Railways?
    A)Ashwini Vaishnaw
    B)Piyush Goyal
    C)Nirmala Sitharaman
    D)Mukhtar Abbas Naqvi
    Answer: Ashwini Vaishnaw
  • Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
    A)1.5 Tonne
    B)2 Tonnes
    C)1 Tonne
    D)None of these
    Answer: 1 Tonne
  • Q. Where is the Indian Railways Institute of Civil Engineering Institute situated?
    A)Nasik
    B)Pune
    C)Chennai
    D)Secunderabad
    Answer: Pune
  • Q. Warning boards for neutral section shall be fixed at a distance of
    A)300 and 600 meters
    B)400 and 600 meters
    C)500 and 250 meters
    D)None of these
    Answer: 500 and 250 meters
  • Q. For how many days the 4500 kms BPC is valid?
    A)45 days
    B)12+3 days
    C)30 days
    D)No limit
    Answer: 12+3 days
  • Q. At what time the first train in Indian (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
    A)Chittranjan
    B)Varanasi
    C)Perambur
    D)Patiala
    Answer: Chittranjan
  • Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
    A)1, 2 & 3
    B)1 Only
    C)1 & 2 Only
    D)None
    Answer: 1, 2 & 3
  • Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Nil caution order
    B)Caution order
    C)Reminder order
    D)None of these
    Answer: Caution order
  • Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The distance between two automatic signals is normally
    A)3 km
    B)2 km
    C)1 km
    D)None of these
    Answer: 1 km
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. When was the Central Railway established?
    A)14th April 1951
    B)5th Nov 1951
    C)14th Nov 1951
    D)16th August, 1951
    Answer: 5th Nov 1951
  • Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
    A)1, 2 & 3
    B)Only 1
    C)1 & 2
    D)1, 2 , 3 & 4
    Answer: Only 1
  • Q. The length of long welded rail under Indian conditions should be about
    A)0.50 km
    B)1 km
    C)2 km
    D)None of these
    Answer: 1 km
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. On which of the following is the longest railway bridge in India located?
    A)River Brahmaputra
    B)River Ganges
    C)Vembanad Lake
    D)Chilka Lake
    Answer: River Brahmaputra
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15