More Questions on Indian Railway
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw
B)Piyush Goyal
C)Nirmala Sitharaman
D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
- Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
A)1.5 Tonne
B)2 Tonnes
C)1 Tonne
D)None of these
Answer: 1 Tonne
- Q. Where is the Indian Railways Institute of Civil Engineering Institute situated?
A)Nasik
B)Pune
C)Chennai
D)Secunderabad
Answer: Pune
- Q. Warning boards for neutral section shall be fixed at a distance of
A)300 and 600 meters
B)400 and 600 meters
C)500 and 250 meters
D)None of these
Answer: 500 and 250 meters
- Q. For how many days the 4500 kms BPC is valid?
A)45 days
B)12+3 days
C)30 days
D)No limit
Answer: 12+3 days
- Q. At what time the first train in Indian (and in Asia) flagged off?
A)Saturday, 03:35 PM
B)Saturday, 8:50 AM
C)Sunday, 10:00 AM
D)Sunday, 02:30 PM
Answer: Saturday, 03:35 PM
- Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
A)Chittranjan
B)Varanasi
C)Perambur
D)Patiala
Answer: Chittranjan
- Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
A)1, 2 & 3
B)1 Only
C)1 & 2 Only
D)None
Answer: 1, 2 & 3
- Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Nil caution order
B)Caution order
C)Reminder order
D)None of these
Answer: Caution order
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph
- Q. The distance between two automatic signals is normally
A)3 km
B)2 km
C)1 km
D)None of these
Answer: 1 km
- Q. At station which signal will be taken off for block line?
A)Shut
B)Repeating
C)Calling on
D)No Signal
Answer: No Signal
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. When was the Central Railway established?
A)14th April 1951
B)5th Nov 1951
C)14th Nov 1951
D)16th August, 1951
Answer: 5th Nov 1951
- Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
A)1, 2 & 3
B)Only 1
C)1 & 2
D)1, 2 , 3 & 4
Answer: Only 1
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. On which of the following is the longest railway bridge in India located?
A)River Brahmaputra
B)River Ganges
C)Vembanad Lake
D)Chilka Lake
Answer: River Brahmaputra
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15