Q. The maximum distance covered by a patrol man should not normally exceed

Correct Answer

10 KM a day

More Questions on Indian Railway

  • Q. Where is the Research, Design and Standard Organization situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. When four wheeler attached, speed of passenger train will be ________ km/h.
    A)85
    B)80
    C)75
    D)90
    Answer: 75
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. In which Governor – General’s reign railway lines in India were established?
    A)Lord Kenning
    B)Lord William Bentick
    C)Lord Cornwallis
    D)Lord Dalhousie
    Answer: Lord Dalhousie
  • Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
    A)3
    B)1
    C)2
    D)4
    Answer: 2
  • Q. Which is the fastest train in India?
    A)Duronto Express
    B)Rajdhani Express
    C)Shatabdi Express
    D)Tejas Express
    Answer: E
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. Number of train signal register of double line is ________.
    A)T/66 B
    B)T/66 A
    C)T/66 C
    D)T/66
    Answer: T/66 B
  • Q. What will be the maximum speed of B-Class ODC in Broad guage?
    A)40 kmph
    B)15 kmph
    C)25 kmph
    D)75 kmph
    Answer: 40 kmph
  • Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
    A)Both
    B)Red Light
    C)Green Light
    D)None of these
    Answer: Red Light
  • Q. “Act” means the Railway Act is ________.
    A)1989 (22 of 1989)
    B)1989 (24 of 1989)
    C)1989 (23 of 1989)
    D)None of these
    Answer: 1989 (24 of 1989)
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
    A)National Academy of Indian Railways
    B)Indian Railway Institute of Signal Engineering and Telecommunication
    C)Research Designs and Standards Organisation
    D)Indian Railway Service of Electrical Engineers
    Answer: Research Designs and Standards Organisation
  • Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
    A)Rail Madad
    B)Rail Sathi
    C)Rail Dost
    D)Rail Neer
    Answer: Rail Madad
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. TCAS full form is:
    A)Train Collision Avoidance Software
    B)Train Collision Advance System
    C)Train Complement Accident Software
    D)Traffic Collision Avoidance System
    Answer: Traffic Collision Avoidance System
  • Q. If the points are set for main line, point indicator gives ________ light in the night.
    A)Yellow
    B)red
    C)Green
    D)White
    Answer: White

Leave a Comment