Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. Which of the following two countries have largest electrified railway network in the world?
    A)Russia & China
    B)Russia & US
    C)US & China
    D)India & US
    Answer: Russia & China
  • Q. Between which of the destinations the first Indian train was started?
    A)From Mumbai to Surat
    B)From Kolkata to Delhi
    C)From Mumbai to Thane
    D)From Mumbai to Madras
    Answer: From Mumbai to Thane
  • Q. Calling on signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
    A)Army Head Quarter
    B)Railway Board
    C)Zonal HQ
    D)None of these
    Answer: Army Head Quarter
  • Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
    A)DOM
    B)ADRM/Sr.DSO/DSO
    C)Sr.DOM
    D)None of these
    Answer: ADRM/Sr.DSO/DSO
  • Q. Sounding of 5 hooters means ________.
    A)ART, MRV required at out station
    B)ART
    C)MRV
    D)None of these
    Answer: ART, MRV required at out station
  • Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
    A)NTPC
    B)ONGC
    C)GAIL India
    D)IOCL
    Answer: GAIL India
  • Q. During power failure in automatic block section, on which authority relief engine will proceed?
    A)TC-912
    B)TA-912
    C)TB-912
    D)TD-912
    Answer: TC-912
  • Q. The length of sand hump is about ________ feet.
    A)170
    B)150
    C)120
    D)170
    Answer: 170
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Impact speed of shunting of one box wagon is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 5
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
    A)6
    B)10
    C)8
    D)4
    Answer: 6
  • Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
    A)15
    B)20
    C)25
    D)30
    Answer: 30
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI

Leave a Comment