More Questions on Indian Railway
- Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
A)150 meters
B)200 meters
C)180 meters
D)None of these
Answer: 150 meters
- Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
A)35
B)15
C)20
D)10
Answer: 10
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Not more than ________ persons including trollyman shall go on a 4 HP motor trolly.
A)9
B)10
C)7
D)4
Answer: 7
- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red
- Q. Introduced ________ in Konkan Railway to help old and disabled passengers.
A)Divyang Express
B)Sahayak Express
C)Viklang Seva Express
D)Sarathi Seva
Answer: Sarathi Seva
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. The turning out time off BD SPL. During day is ________ minutes
A)50
B)30
C)20
D)None of these
Answer: 30
- Q. The validity of BCC is for ________ years
A)01 years
B)03 years
C)02 years
D)None of these
Answer: 03 years
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. In which city is the Wheel and Axle Plant of the Indian Railways located?
A)Bangalore
B)Kapurthala
C)Varanasi
D)Rae Barelly
Answer: Bangalore
- Q. Where did Chapman form the committee?
A)Edimbara
B)Glassgo
C)London
D)Lords
Answer: London
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. Air pressure in the engine and brake van of a goods train with 58 N Boxes shall be 5.0 kg/cm2 and ________ respectively.
A)4.5 kg/cm2
B)4.1 kg/cm2
C)4.2 kg/cm2
D)4.7 kg/cm2
Answer: 4.7 kg/cm2
- Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
A)Block sectiond
B)Next whole block section
C)Back whole block section
D)None of these
Answer: Next whole block section
- Q. Joint sighting committee shall inspect the visibility of signals once in
A)6 months
B)A month
C)3 months
D)None of these
Answer: 3 months
- Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 1
- Q. Traffic gates are those located between ________.
A)First signal
B)Outermost stop signal
C)Stop signal
D)None of these
Answer: Outermost stop signal
- Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
A)15 minutes
B)10 minutes
C)5 minutes
D)No need
Answer: 15 minutes
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State