Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
    A)Hyderabad
    B)Visakhapatnam
    C)Kolkata
    D)Bhubaneswar
    Answer: Bhubaneswar
  • Q. What is the maximum speed in block section during thick & foggy weather?
    A)15 kmph
    B)30 kmph
    C)60 kmph
    D)Not to move
    Answer: 60 kmph
  • Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?
    A)West Bengal ↔ Tripura
    B)Arunachal Pradesh ↔ Tripura
    C)Sikkim ↔ West Bengal
    D)Arunachal Pradesh ↔ Assam
    Answer: Sikkim ↔ West Bengal
  • Q. How many minimum BP pressure is require in engine to charge Goods train?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
    A)15
    B)10
    C)20
    D)40
    Answer: 15
  • Q. The White light in point indicator indicates?
    A)Pass run through
    B)Loop line is set
    C)Main line set
    D)All is right
    Answer: Main line set
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. Wagon with livestock shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Second
  • Q. A jumper is remote control and is used for ________.
    A)Control on Light, Fan etc.
    B)Light
    C)Fans
    D)None of these
    Answer: Control on Light, Fan etc.
  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4
  • Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Track maintenance machine is permitted to work during
    A)Day clear weather
    B)Day
    C)Day and Night
    D)None of these
    Answer: Day and Night
  • Q. In which institution the training of electric work is being given?
    A)Railway Staff College
    B)Indian Railways Institute of Mechanical and Electrical Engineering
    C)Indian Railways Institute of Electrical Engineering
    D)Indian Railways Institute of Civil Engineering
    Answer: Indian Railways Institute of Electrical Engineering
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. In the enroute, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. What is the length of North-Eastern Frontier Railway (NFR)?
    A)4290 km
    B)4300 km
    C)3700 km
    D)5298 km
    Answer: 3700 km
  • Q. On which speed BG engine shall be run while speedometer is defective during run?
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)Maximum 10% less of MPS
    Answer: Maximum 10% less of MPS

Leave a Comment