Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
    A)85
    B)60
    C)75
    D)90
    Answer: 90
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. Signal failure advised to the driver through the station in rear will be inform
    A)T/369(3b)
    B)T/369
    C)T/370
    D)None of these
    Answer: T/369
  • Q. By whom the rear portion of train left behind in block section protected?
    A)By engineearing official
    B)By Guard
    C)By LP
    D)No need to protect the load
    Answer: By Guard
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. Distance between two automatic signals is called as ________.
    A)Signalling Section
    B)Block section
    C)Mid Section
    D)None of these
    Answer: Signalling Section
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)35
    C)30
    D)35
    Answer: 30
  • Q. Number of the Nil caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 408
    D)None of these
    Answer: T/A 409
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
    A)ALP
    B)Driver
    C)Guard
    D)None of these
    Answer: Guard
  • Q. Rajasthan is under which of the following railway zones?
    A)North - Western region
    B)Northern region
    C)Western region
    D)Central Region
    Answer: North - Western region
  • Q. How many training institutions of Railways are in India?
    A)Five
    B)Three
    C)Four
    D)Six
    Answer: Five
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
    A)In Break van
    B)At Facing point
    C)On Engine
    D)At Anyplace
    Answer: In Break van
  • Q. No passenger train shall be started from a station before the ________ time
    A)Both
    B)Advertised
    C)Non-advertised
    D)None of these
    Answer: Advertised
  • Q. Normally material train will work during ________.
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day

Leave a Comment