More Questions on Indian Railway
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
A)1.5 Tonne
B)2 Tonnes
C)1 Tonne
D)None of these
Answer: 1 Tonne
- Q. W/L board will be provided at not less than ________ metres from the gate.
A)600
B)400
C)500
D)800
Answer: 600
- Q. Loco pilot must have ________ sets of spectacles in his personal store.
A)Three
B)Two
C)One
D)None of these
Answer: Two
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. What will be distance between fire affected train and rest of the train ?
A)50 meters
B)25 meters
C)45 meters
D)100 meters
Answer: 45 meters
- Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
A)1 - 890 meters
B)1 - 98 meters
C)1 - 830 meters
D)None of these
Answer: 1 - 98 meters
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third
B)First
C)Second
D)Fourth
Answer: Second
- Q. When was the first train in India started?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. The minimum distance from centre to centre of track in BG is
A)13 feet
B)14 feet
C)12 feet
D)None of these
Answer: 14 feet
- Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
A)15 kmph
B)8 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Consider the following sectors: 1)Plantation Sector 2)Mining and Exploration of Metal 3)Railway Infrastructure In which of the above, government has permitted 100% FDI through automatic route?
A)2 & 3 Only
B)1 & 2 Only
C)3 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
A)Received train
B)Through
C)Train parted
D)None of these
Answer: Train parted
- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958