Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
A
North Korea
B
Japan
C
South Korea
D
China
Correct Answer
Japan
More Questions on Indian Railway
Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective B)Caution C)Cautiously D)None of these
Answer: Cautiously
Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph B)20 kmph C)25 kmph D)None of these
Answer: 30 kmph
Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological B)Logical C)Un-logical D)None of these
Answer: Chronological
Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
A)T/369(B) B)T/369(3b) C)T/369(2b) D)None of these
Answer: T/369(2b)
Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
A)15 km B)18 km C)10 km D)20 km
Answer: 15 km
Q. ________ must be issued during thick or foggy weather.
A)Reminder Caution Order B)Caution Order C)Nil Caution Order D)Minimum Caution Order
Answer: Caution Order
Q. Train is to be started from non signalled line
A)T/D 602 B)T-511 C)T-512 D)Simple memo
Answer: T-511
Q. The consumption of fuel during idle run per hour is
A)25 Lts B)15 Lts C)20 Lts D)None of these
Answer: 25 Lts
Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw B)Piyush Goyal C)Nirmala Sitharaman D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?