More Questions on Indian Railway
- Q. When water touches danger level mark, C.O. to be issued for speed – during day
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Motor Trolly can follow another motor trolly during
A)Day and Night clear weather
B)Day and Night
C)Day only
D)None of these
Answer: Day and Night clear weather
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. In automatic block area SL. The LSS shall not be taken of unless the line is clear upto
A)Automatic stop signal+180 Meters
B)next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: next automatic stop signal
- Q. The extended life of Detonator is ________ Years.
A)4
B)5
C)6
D)10
Answer: 10
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. Diesel locomotives are built in?
A)Perambur
B)Banglore
C)Varanasi
D)Hubli
Answer: Varanasi
- Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
A)2
B)1.5
C)1
D)None of these
Answer: 1.5
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. A material train may be divided outside station limit during emergency under the supervision of ________.
A)Driver
B)Guard
C)PWI
D)None of these
Answer: PWI
- Q. For how many days the 4500 kms BPC is valid?
A)45 days
B)12+3 days
C)30 days
D)No limit
Answer: 12+3 days
- Q. Maximum permissible speed is fixed by ________.
A)MT
B)CRS
C)GM
D)None of these
Answer: CRS
- Q. During TFC in double line which authority to serve the driver for train operation?
A)TC-602
B)TC-1425
C)TA-602
D)TD-1425
Answer: TC-602
- Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
A)650
B)700
C)725
D)760
Answer: 760
- Q. Nil Caution order number is ________
A)T/C409
B)T/A-409
C)T/B-409
D)None of these
Answer: T/A-409
- Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg
B)6 kg
C)10 kg
D)None of these
Answer: 7 - 10 kg
- Q. Where is the information about the Ruling Gradient of a section?
A)G & SR
B)SWR
C)WTT
D)Operating Manual
Answer: WTT
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State