Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
    A)75 kmph
    B)140 kmph
    C)160 kmph
    D)15 kmph
    Answer: 15 kmph
  • Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
    A)Army Head Quarter
    B)Railway Board
    C)Zonal HQ
    D)None of these
    Answer: Army Head Quarter
  • Q. How many stations to be redeveloped through PPP?
    A)350
    B)100
    C)200
    D)600
    Answer: 600
  • Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
    A)DOM
    B)ADRM/Sr.DSO/DSO
    C)Sr.DOM
    D)None of these
    Answer: ADRM/Sr.DSO/DSO
  • Q. The zone with the minimum length is
    A)South - East Railway
    B)North - Eastern Railway
    C)North - Eastern Frontier Railway
    D)South - Central Railway
    Answer: North - Eastern Frontier Railway
  • Q. The headquarters of North – East Frontier Railway (NFR) is
    A)Chennai
    B)Kolkata
    C)Maligaon (Guwahati)
    D)Gorakhpur
    Answer: Maligaon (Guwahati)
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. Departmental enquiry must be ordered by ________.
    A)DRM
    B)Sr. DPO
    C)COM
    D)Sr. DOM
    Answer: DRM
  • Q. In case of 1 in 100 rising gradient, ________ siding is provided.
    A)Slip
    B)Long
    C)Catch
    D)None of these
    Answer: Slip
  • Q. passing through station during day when running without brakevan and tail board.
    A)25 kmph
    B)10 kmph
    C)20 kmph
    D)Normal speed
    Answer: 20 kmph
  • Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Green
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. How many training institutions of Railways are in India?
    A)Five
    B)Three
    C)Four
    D)Six
    Answer: Five
  • Q. Modified lower quadrant signaling may be introduced only with section of
    A)GM
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. In which year Indian Railway was nationalized?
    A)1952
    B)1947
    C)1951
    D)1955
    Answer: 1951
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. To apply for Line block, the notice shall be given to DRM not less than
    A)12 hours
    B)48 hours
    C)24 hours
    D)None of these
    Answer: 24 hours
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters