Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. Reference of ________ is written by the side of the Rule if the Rule is corrected.
    A)No. and Item No. Correction Slip
    B)Number Slip
    C)Item Number
    D)None of these
    Answer: No. and Item No. Correction Slip
  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. When the train catches fire, that carriage must be ________.
    A)Both
    B)Isolated
    C)Non-isolated
    D)None of these
    Answer: Isolated
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. Staff of ________ department shall protect the material train while working in block section.
    A)Engineering
    B)Operation
    C)C & W
    D)None of these
    Answer: Engineering
  • Q. Where is the Railway Staff College located?
    A)Vadodara
    B)Pune
    C)Delhi
    D)Allahabad
    Answer: Vadodara
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. The headquarters of South – Central Railways is situated at
    A)Secunderabad
    B)Mumbai (CST)
    C)Chennai
    D)Mumbai (Central)
    Answer: Secunderabad
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
    A)01 long
    B)03 long
    C)02 long
    D)None of these
    Answer: 03 long
  • Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
    A)Both
    B)GDR
    C)TDR
    D)None of these
    Answer: GDR
  • Q. During prolonged failure of signals in automatic section, ________ authority is issued.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. ________ brake is not provided in the coach of passenger train.
    A)Minor
    B)Hand
    C)Non-hand
    D)None of these
    Answer: Hand
  • Q. What is shunting order number?
    A)T-806
    B)T-609
    C)T/A-602
    D)T-409
    Answer: T-806
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4