More Questions on Indian Railway
- Q. BSLB determines the limits of Station section and ________.
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. Corridor block is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Each motor coach shall consist of ________ Traction motors.
A)4
B)2
C)3
D)5
Answer: 4
- Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
A)ST 1-260
B)ST 1-600
C)1-400
D)None of these
Answer: ST 1-600
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Verbally
B)Walkie-Talkie
C)Written Memo
D)None of these
Answer: Written Memo
- Q. On which authority relief train shall be dispatched for obstructed block section?
A)On memo
B)PLCT
C)T/A602
D)None of these
Answer: T/A602
- Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
A)15 kmph
B)20 kmph
C)Stop & Start
D)Normal speed
Answer: Normal speed
- Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. Which of the following stations was formerly known as Victoria Terminus?
A)Lokmanya Tilak Terminus
B)Churchgate Railway Station
C)Mumbai Central
D)Chhatrapati Shivaji Terminus
Answer: Chhatrapati Shivaji Terminus
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. To attach the 12 coach EMU rake, ________ units are to be attached.
A)8
B)5
C)6
D)4
Answer: 4
- Q. Train crew shall exchange alright hand signals upto ________ or last points.
A)Call-on
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. Reminder Caution order number is ________.
A)T/C-408
B)T/B-409
C)T/A-409
D)None of these
Answer: T/B-409