Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
    A)Gujarat
    B)Kerala
    C)Tamil Nadu
    D)Andhra Pradesh
    Answer: Kerala
  • Q. Who will be called Sahayak?
    A)Coolies
    B)New Superfast Train
    C)Upcoming Event made for Disabled Persons
    D)Railway Magazine (including Railway's upcoming ventures)
    Answer: Coolies
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Semi-automatic signal is identified by ________.
    A)Illuminated a marker
    B)Marker
    C)Semi marker
    D)None of these
    Answer: Illuminated a marker
  • Q. What is the width of broad gauge railway line in India?
    A)4 feet 11 inches
    B)5 feet 3 inches
    C)5 feet 6 inches
    D)5 feet 4 inches
    Answer: 5 feet 6 inches
  • Q. Normally the train with hot axle is admitted on ________.
    A)Main Line
    B)Loop Line
    C)Siding Line
    D)None of these
    Answer: Main Line
  • Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
    A)15 kmph
    B)30 kmph
    C)25 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. Station limit is the portion between ________.
    A)Both
    B)Outermost signal
    C)Innermost signal
    D)None of these
    Answer: Outermost signal
  • Q. For ‘B’ Class ISMD load, permission must be granted by
    A)CE
    B)DRM
    C)CRS
    D)None of these
    Answer: CE
  • Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
    A)1, 2 & 3
    B)1 Only
    C)1 & 2 Only
    D)None
    Answer: 1, 2 & 3
  • Q. The headquarters of Northern Railway is at
    A)Gorakhpur
    B)New Delhi
    C)Guwahati
    D)Mumbai (CST)
    Answer: New Delhi
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. Where is the Railway Staff College located?
    A)Vadodara
    B)Pune
    C)Delhi
    D)Allahabad
    Answer: Vadodara
  • Q. Repeating signal shows ________ light in ON condition.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
    A)Both
    B)UP
    C)Falling
    D)None of these
    Answer: UP
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters