More Questions on Indian Railway
- Q. Maximum speed of shunting of wagons with explosives is ________ km/h.
A)15
B)8
C)10
D)20
Answer: 8
- Q. Loss of Railway property of ________ is treated as serious accident.
A)75 Lakhs
B)More than 50 lakhs
C)01 crore
D)More than 02 crore
Answer: More than 02 crore
- Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km
B)8 km
C)10 km
D)25 km
Answer: 25 km
- Q. Caution order is carried forward at stations on ________ at 09:00 hours.
A)Monday
B)Tueday
C)Sunday
D)None of these
Answer: Monday
- Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8
B)7
C)9
D)10
Answer: 9
- Q. When did the first ignition engine develop?
A)1900
B)1890
C)1892
D)1904
Answer: 1892
- Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
A)20
B)25
C)15
D)None of these
Answer: 25
- Q. Which of the following is the largest railway junction in India?
A)Mathura
B)Delhi
C)Bhatinda
D)Allahabad
Answer: E
- Q. IBP is a Station in which class?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
A)Authority
B)Private Number
C)Cuation Number
D)None of these
Answer: Private Number
- Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Nil caution order
B)Caution order
C)Reminder order
D)None of these
Answer: Caution order
- Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
A)Both
B)Track Circuit
C)Track
D)None of these
Answer: Track Circuit
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.
A)Executive
B)Examine
C)Next Examine
D)None of these
Answer: Next Examine
- Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
A)T/A 602
B)T-806
C)T/A 802
D)T-806 A
Answer: T-806
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. BSLB determines the limits of Station section and ________.
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State