Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?

Correct Answer

Japan

More Questions on Indian Railway

  • Q. Hand shunting is performed at speed not exceeding
    A)05 kmph
    B)10 kmph
    C)08 kmph
    D)None of these
    Answer: 05 kmph
  • Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
    A)Assam and Maharashtra
    B)Manipur and Jammu & Kashmir
    C)Jammu & Kashmir & Assam
    D)Maharashtra and Jammu & Kashmir
    Answer: Manipur and Jammu & Kashmir
  • Q. SLB determines the limits of block section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. D class station board is placed ________ meters from the end of the platform.
    A)600
    B)400
    C)500
    D)800
    Answer: 500
  • Q. Trolley caution order no is ________.
    A)600
    B)400
    C)500
    D)800
    Answer: 400
  • Q. Yearly goods stock census is taken on ________.
    A)30st November
    B)31st December
    C)31st October
    D)31st March
    Answer: 30st November
  • Q. Derailment will come under accident class ________.
    A)C
    B)A
    C)B
    D)D
    Answer: D
  • Q. General Manger is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. Colour of the semaphore shunt signal is ________.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
    A)Both 1 & 2 are correct
    B)Only 1 is correct
    C)Only 2 is correct
    D)Neither 1 nor 2 is correct
    Answer: Both 1 & 2 are correct
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. While stabling box load, hand brakes of ________ wagons at both ends shall be pinned down.
    A)7 - 7
    B)8 - 8
    C)6 - 6
    D)8 - 8
    Answer: 6 - 6
  • Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
    A)1, 2 & 3
    B)Only 1
    C)1 & 2
    D)1, 2 , 3 & 4
    Answer: Only 1
  • Q. Colour of the semaphore distant signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)4
    B)10
    C)9
    D)3
    Answer: 10
  • Q. The number of line clear ticket in down direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/D 1425
    Answer: T/D 1425
  • Q. In which year Research, Design and Standard organization was established?
    A)1959
    B)1954
    C)1957
    D)1967
    Answer: 1957
  • Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
    A)20 days
    B)10 days
    C)15 days
    D)None of these
    Answer: 15 days
  • Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
    A)20 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph

Leave a Comment