Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?

Correct Answer

Chenab

More Questions on Indian Railway

  • Q. Maximum speed of tower wagon is ________ km/h.
    A)40
    B)25
    C)20
    D)50
    Answer: 40
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. Flasher light is of ________ colour.
    A)Green
    B)Red
    C)Amber
    D)None of these
    Answer: Amber
  • Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
    A)A & B both
    B)Absent from his duty
    C)Indiscipline
    D)None of these
    Answer: Absent from his duty
  • Q. Competency certificate of the gateman of interlocked engineering gate is issued by
    A)SSE/C & W
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: SSE/P.way
  • Q. Written authority received to pass approach stop signal.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Time taken by train running at MPS is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Minimum running time
  • Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
    A)Automatic stop signal+180 Meters
    B)Next automatic stop signal
    C)Automatic stop signal+120 Meters
    D)None of these
    Answer: Next automatic stop signal
  • Q. IBP is a Station in which class?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. The validity of BCC is for ________ years
    A)01 years
    B)03 years
    C)02 years
    D)None of these
    Answer: 03 years
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. Signal sighting committee shall submit its report on form ________.
    A)T/101 B
    B)T/103 B
    C)T/102 B
    D)None of these
    Answer: T/102 B
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. Which among the following becomes the part of Consolidated Fund of India? 1)Capitation Taxes 2)Taxes on railway fares and freights 3)Taxes on sale and purchase of newspapers and advertisements therein Select the correct option from the codes given below:
    A)Only 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)None of them
    Answer: None of them
  • Q. A station where the rail lines end, is called
    A)Block station
    B)Junction station
    C)Way - side station
    D)Terminal station
    Answer: Terminal station
  • Q. Where is the wheel and axle plant of Indian Railways situated?
    A)Bangalore
    B)Chittranjan
    C)Kapurthala
    D)Perambur
    Answer: Bangalore
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
    A)15:30
    B)14:30
    C)12:30
    D)13:30
    Answer: 13:30