Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.

Correct Answer

Third

More Questions on Indian Railway

  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. Matheran Hill Railway is located in which state of India?
    A)Odisha
    B)Himachal Pradesh
    C)Maharashtra
    D)Meghalaya
    Answer: Maharashtra
  • Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
    A)60
    B)40
    C)50
    D)45
    Answer: 45
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Block section limit board provided at station?
    A)B class Single line TA
    B)B class Single line MAUQ
    C)B class Double line TA
    D)B class Double line MA
    Answer: B class Double line MA
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. Dead engine is attached at ________ position on a Mail / Express train.
    A)Both
    B)Engine to engine
    C)Next to engine
    D)None of these
    Answer: Next to engine
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. During failure of signals and communications in DL automatic area the authority to proceed is
    A)T/B 912
    B)T/D 912
    C)T/A 912
    D)None of these
    Answer: T/B 912
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 20 kmph
  • Q. What is the position of the Indian Railway in the world according to the length of rail lines?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Fourth
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. When did the first ignition engine develop?
    A)1900
    B)1890
    C)1892
    D)1904
    Answer: 1892
  • Q. Motor Trolley permit is ________
    A)T/1625
    B)T/1425
    C)T/1525
    D)None of these
    Answer: T/1525

Leave a Comment