More Questions on Indian Railway
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. Time taken by train running at MPS is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Minimum running time
- Q. How an automatic stop signal can be recognized?
A)Eliminated A marker
B)A marker on white disk
C)No mark
D)Four aspects
Answer: A marker on white disk
- Q. Loco pilot must have ________ sets of spectacles in his personal store.
A)Three
B)Two
C)One
D)None of these
Answer: Two
- Q. Sounding of 5 hooters means ________.
A)ART, MRV required at out station
B)ART
C)MRV
D)None of these
Answer: ART, MRV required at out station
- Q. Approved special instructions are issued by ________.
A)PCOM
B)CRS
C)MT
D)None of these
Answer: CRS
- Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Verbally
B)Walkie-Talkie
C)Written Memo
D)None of these
Answer: Written Memo
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. Distant signal shows ________ light in normal condition in double distant signalling is provided.
A)Three yellow
B)One Yellow
C)Two yellow
D)Four yellow
Answer: Two yellow
- Q. Shatabdi Express train was started in ________.
A)1990
B)1984
C)1988
D)1985
Answer: 1988
- Q. Length of a BG ICF Coach is
A)21.337 meters
B)22.089 meters
C)21.494 meters
D)None of these
Answer: 21.337 meters
- Q. When was the new Harbour rail line inaugurated?
A)1931
B)1925
C)1928
D)1933
Answer: 1925
- Q. Consider the following statements about Railway Convention Committee: 1)The Chairman of the Committee is appointed by the Speaker from amongst the members of the Committee 2) The Committee reviews the rate of dividend which is payable by the Railway Undertaking to the General Revenues Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Both 1 & 2
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. When two trollies are working in section the gap between the two must be
A)400 Meters
B)100 meters
C)200 meters
D)None of these
Answer: 100 meters
- Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
A)Rail Wheel Factory
B)Modern Coach Factory
C)Integral Coach Factory
D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points
- Q. The speed of Motor Trolly over points and crossings is
A)15 kmph
B)10 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days
B)10 days
C)15 days
D)None of these
Answer: 15 days
- Q. The time limit for starting BD special during day is ________.
A)30 meters
B)20 meters
C)15 meters
D)40 meters
Answer: 30 meters