Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
A
Third
B
First
C
Second
D
None of these
Correct Answer
Third
More Questions on Indian Railway
Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore B)Chittranjan C)Kapurthala D)Perambur
Answer: Bangalore
Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25 B)30 C)20 D)50
Answer: 30
Q. In case of block forward, private number of ________ station is written on shunting authority.
A)T/809 B)T/806 C)T/809 D)T/810
Answer: T/806
Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
A)3 B)6 C)4 D)2
Answer: 6
Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
A)DOM B)ADRM/Sr.DSO/DSO C)Sr.DOM D)None of these
Answer: ADRM/Sr.DSO/DSO
Q. At the starting station, passenger train must have ________ % of brake power.
A)90 B)75 C)50 D)100
Answer: 100
Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
A)ST 1-260 B)ST 1-400 C)1-400 or sleeper D)None of these
Answer: 1-400 or sleeper
Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
A)10 B)15 C)20 D)25
Answer: 10
Q. Staff of ________ department shall protect the material train while working in block section.
A)Engineering B)Operation C)C & W D)None of these
Answer: Engineering
Q. The speed of shunting is ________.
A)10 kmph B)15 kmph C)20 kmph D)None of these
Answer: 15 kmph
Q. Maximum No. of ________ explosive wagons can be attached to a goods train.
A)6 B)5 C)4 D)10
Answer: 5
Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.
A)Three Long B)One Long C)Two Long D)None of these
Answer: One Long
Q. The headquarters of North – Eastern railway is situated at
A)Gorakhpur B)Mumbai (CST) C)Guwahati D)New Delhi
Answer: Gorakhpur
Q. Speed of following tower wagon in the block section is ________ km/h.
A)8 B)5 C)2 D)4
Answer: 8
Q. Trolley caution order no is ________.
A)600 B)400 C)500 D)800
Answer: 400
Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph B)25 kmph C)20 kmph D)None of these
Answer: 25 kmph
Q. The speed of Engine on Baharline is ________ kmph
A)16 B)10 C)15 D)None of these
Answer: 10
Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25 B)20 C)15 D)None of these
Answer: 25
Q. In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
A)Both B)Day C)Night D)None of these
Answer: Day
Q. Which is the shortest station name in Indian Railways?