More Questions on Indian Railway
- Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
A)Sutlej
B)Chenab
C)Jhelum
D)Indus
Answer: Chenab
- Q. Maximum speed of trains during day in case of OHE failure is ________
A)65 km
B)108 km
C)70 km
D)60 km
Answer: 60 km
- Q. The additional Hours in the case of Gate man C saloon attendant, care takers will be ________
A)24 Hours
B)12 Hours
C)08 Hours
D)16 Hours
Answer: 24 Hours
- Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
A)--0
B)0-0
C)-0-
D)---
Answer: 0-0
- Q. Minimum depth of space for wheel flange from rail level in BG is
A)3"
B)2"
C)1 (1/2)"
D)None of these
Answer: 1 (1/2)"
- Q. Corridor block is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)
- Q. Length of a standard BG loop line is
A)720 meters
B)686 meters
C)670 meters
D)None of these
Answer: 686 meters
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph
- Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
A)Germany
B)Sweden
C)Russia
D)Italy
Answer: Germany
- Q. Matheran Hill Railway is located in which state of India?
A)Odisha
B)Himachal Pradesh
C)Maharashtra
D)Meghalaya
Answer: Maharashtra
- Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
A)Not more than two bogies or their equivalent
B)Two Bogies
C)04 four wheelers only
D)None of these
Answer: Not more than two bogies or their equivalent
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
A)CSO
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
A)400
B)900
C)800
D)700
Answer: 400
- Q. Signal passed at danger is treated as ________ accident.
A)Indirection
B)Indicative
C)Direct
D)None of these
Answer: Indicative
- Q. EMU train has ________ type of couplings.
A)Shakuu
B)Shakau
C)Shakua
D)None of these
Answer: Shakau
- Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
A)15 minutes
B)10 minutes
C)5 minutes
D)No need
Answer: 15 minutes
- Q. Termination indication board will be
A)Rectangular
B)Square
C)Round
D)None of these
Answer: Round