More Questions on Indian Railway
- Q. Suburban Working time table is signed by ________ , COM and CPTM.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points
- Q. At the starting station, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. What is the width of broad gauge railway line in India?
A)4 feet 11 inches
B)5 feet 3 inches
C)5 feet 6 inches
D)5 feet 4 inches
Answer: 5 feet 6 inches
- Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
A)50 seconds
B)120 seconds
C)90 seconds
D)None of these
Answer: 120 seconds
- Q. During prolonged failure of signals in automatic section, ________ authority is issued.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. Signals are normally located to the ________ side of the line.
A)Both
B)Right
C)Left
D)None of these
Answer: Left
- Q. On which speed BG train should be run while speedometer failed in block section?
A)No need to reduced speed
B)10% less of sectional speed
C)10% less of booked speed
D)40 kmph
Answer: 10% less of sectional speed
- Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
A)Shunt
B)Repeating
C)Call-on
D)None of these
Answer: Repeating
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters
- Q. Motorman shall give ________ beat to release the hand brakes.
A)00-00-00
B)00-0-00
C)0-0-0
D)0-00-00
Answer: 00-0-00
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Where is RDSO Situated.
A)Chennai
B)Vadodara
C)Lucknow
D)New Delhi
Answer: Lucknow
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. Sounding of 5 hooters means ________.
A)ART, MRV required at out station
B)ART
C)MRV
D)None of these
Answer: ART, MRV required at out station
- Q. Sand hump is a substitute to ________ and also a means of isolation.
A)Over signal
B)Signal
C)Signal overlap
D)None of these
Answer: Signal overlap
- Q. Is general manager responsible for?
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)None of these
Answer: Railway Board
- Q. Depot in-charge is responsible to test the detonators once in ________.
A)Year
B)Monthly
C)Weekly
D)None of these
Answer: Year
- Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective
B)Restricted
C)Most restricted
D)Noe of these
Answer: Most restricted