- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. Second train during TSL will be dispatched after ________.
A)Both
B)Line clear
C)Without line clear
D)None of these
Answer: Line clear
- Q. Impact speed of shunting of one box wagon is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 5
- Q. The maximum speed of a train while passing through station of interlocking std III is?
A)140 kmph
B)50 kmph
C)110 kmph
D)160 kmph
Answer: 140 kmph
- Q. All automatic stop signals will have ________ marker plate.
A)G
B)B
C)A
D)None of these
Answer: A
- Q. ________ bogies can be attached in rear of SLR of Mail/Express train.
A)2
B)4
C)3
D)8
Answer: 2
- Q. ________ tail board will be used is EMU train.
A)Turn Over & Turn Flow
B)Turnover
C)Turn Flow
D)None of these
Answer: Turnover
- Q. Caution order is carried forward at stations on Monday at ________ hours.
A)12:00
B)10:00
C)11:00
D)09:00
Answer: 09:00
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. Not more than ________ persons including trollyman shall go on a trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. What is the speed of second train on double line section running on T/A602?
A)10 kmph
B)20 kmph
C)15 kmph
D)8 kmph
Answer: 8 kmph
- Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
A)1000 meters
B)400 meters
C)600 meters
D)None of these
Answer: 600 meters
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. How much minimum BP pressure is reduce to require to apply brake in a goods train?
A)1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
B)Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
C)1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
D)
Answer: Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
- Q. What does the Slip siding protects?
A)Block Section
B)Station Section
C)Station Limit
D)Siding
Answer: Block Section
- Q. Slip siding protects
A)Station section
B)Station limit
C)Block section
D)None of these
Answer: Block section
- Q. Signal failure advised to the driver through the station in rear will be inform
A)T/369(3b)
B)T/369
C)T/370
D)None of these
Answer: T/369
- Q. If the signal is continuously bobbing/flickering, the signal is treated as showing ________ aspect.
A)Rectified
B)Most Restrictive
C)Restrictive
D)None of these
Answer: Most Restrictive