More Questions on Indian Railway
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. The distance between two automatic signals is normally
A)3 km
B)2 km
C)1 km
D)None of these
Answer: 1 km
- Q. Time taken by train running at MPS is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Minimum running time
- Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
A)25
B)15
C)20
D)None of these
Answer: 15
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. Loco pilot must have ________ sets of spectacles in his personal store.
A)Three
B)Two
C)One
D)None of these
Answer: Two
- Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
A)DOM
B)ADRM/Sr.DSO/DSO
C)Sr.DOM
D)None of these
Answer: ADRM/Sr.DSO/DSO
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
A)Gate opened and point is not set for main line
B)Gate closed and point is set for main line
C)Gate opened and point is set for main line
D)Defective signal
Answer: Defective signal
- Q. Presentation of the first ever railway budget in India held in
A)1925
B)1853
C)1888
D)1905
Answer: 1925
- Q. Maximum speed of shunting of wagons with explosives is ________ km/h.
A)15
B)8
C)10
D)20
Answer: 8
- Q. In case of train parting ________ bell code is given on block instrument.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-000
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. How much distance was travelled by first train of India?
A)34 km
B)33 km
C)36 km
D)46 km
Answer: 34 km
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State