Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Correct Answer

30

More Questions on Indian Railway

  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. Goods train without brake van shall not be run during ________.
    A)CCF
    B)BCF
    C)ACF
    D)None of these
    Answer: ACF
  • Q. The length of sand hump is about ________ feet.
    A)170
    B)150
    C)120
    D)170
    Answer: 170
  • Q. A station where the rail lines end, is called
    A)Block station
    B)Junction station
    C)Way - side station
    D)Terminal station
    Answer: Terminal station
  • Q. Sounding of 4 hooters means ________.
    A)ART & MRV requirement at home Station
    B)ART
    C)MRV
    D)None of these
    Answer: ART & MRV requirement at home Station
  • Q. Launched World’s first Bio Toilet Train. Named as:
    A)Dirubharg Rajdhani Express
    B)Deen Dayalu Express
    C)Himsagar janshatabdi Express
    D)Shatabdi Express
    Answer: Dirubharg Rajdhani Express
  • Q. In one train only system, information of lost of metal token is given to ________.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
    A)1 - 890 meters
    B)1 - 98 meters
    C)1 - 830 meters
    D)None of these
    Answer: 1 - 98 meters
  • Q. The speed of the train over neutral section shall not be less than ________ kmph
    A)40
    B)20
    C)30
    D)None of these
    Answer: 30
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
    A)ST 1-260
    B)ST 1-400
    C)1-400 or sleeper
    D)None of these
    Answer: 1-400 or sleeper
  • Q. Whenever new signal is placed, caution order is issued to Loco Pilot for ________ days.
    A)35
    B)15
    C)20
    D)10
    Answer: 10
  • Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
    A)15 kmph
    B)30 kmph
    C)25 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
    A)25
    B)75
    C)15
    D)30
    Answer: 15
  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. How many officers may be attached with light engine?
    A)1
    B)2
    C)3
    D)None of these
    Answer: 3
  • Q. Diesel locomotives are built in?
    A)Perambur
    B)Banglore
    C)Varanasi
    D)Hubli
    Answer: Varanasi
  • Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
    A)600
    B)500
    C)400
    D)800
    Answer: 600
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train

Leave a Comment