Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Correct Answer

30

More Questions on Indian Railway

  • Q. Sand hump is a substitute to ________ and also a means of isolation.
    A)Over signal
    B)Signal
    C)Signal overlap
    D)None of these
    Answer: Signal overlap
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Red
  • Q. Colour of the semaphore distant signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. Goods warning board will be provided from FSS in BG at
    A)560 meters
    B)1400 meters
    C)1000 meters
    D)None of these
    Answer: 1400 meters
  • Q. IN the BD Spl, the water must be filled ________.
    A)Three Week
    B)Once a week
    C)Two week
    D)None of these
    Answer: Once a week
  • Q. In which country was flange wheel invented?
    A)Europe
    B)Germany
    C)Japan
    D)Russia
    Answer: Germany
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
    A)ST 1-800
    B)ST 1-600
    C)ST 1-700
    D)None of these
    Answer: ST 1-600
  • Q. Indian Railways has launched an integrated mobile app “Rail Saarthi” for railway passengers. What does “Saarthi” stands for?
    A)Synchronous Advanced Application Rail Travel Help and Information
    B)Synergised Advanced Application Rail Travel Help and Information
    C)Synchronic Advanced Application Rail Travel Help and Information
    D)Synergic Advanced Application Rail Travel Help and Information
    Answer: Synergised Advanced Application Rail Travel Help and Information
  • Q. What is the length of North-Eastern Frontier Railway (NFR)?
    A)4290 km
    B)4300 km
    C)3700 km
    D)5298 km
    Answer: 3700 km
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. When a Goods train is working without guard or BV or Guard and BV the speed is
    A)10
    B)25
    C)20
    D)None of these
    Answer: 25
  • Q. when form T/D 912 is issued the driver shall not exceed the speed
    A)25 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Sounding of ________ hooters means accident of goods train at home station.
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. Where is the extreme north of India a railway station?
    A)Pathankot
    B)Jammu Tawi
    C)Baramulla
    D)Guwahati
    Answer: Baramulla
  • Q. During serious accident, ________ will be the in-charge of control office.
    A)Sr. DOM
    B)DOM
    C)AOM
    D)None of these
    Answer: Sr. DOM
  • Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
    A)60
    B)40
    C)50
    D)45
    Answer: 45
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351