Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Correct Answer

30

More Questions on Indian Railway

  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B
  • Q. BSLB determines the limits of block section and ________ .
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. Illuminated A marker of semi-automatic signal means ________.
    A)Outer signal
    B)Working as automatic signal
    C)Semi signal
    D)None of these
    Answer: Working as automatic signal
  • Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. During emergency, in the absence of tail board ________ can be used with the DRM.
    A)Yellow flag
    B)GREAN FLAG
    C)RED FLAG
    D)None of these
    Answer: RED FLAG
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
    A)10
    B)15
    C)20
    D)25
    Answer: 10
  • Q. Block competency certificate is issued by ________.
    A)AOM
    B)Principal ZRTI
    C)SM
    D)None of these
    Answer: Principal ZRTI
  • Q. The first Shatabdi express was introduced between which of the following locations?
    A)New Delhi and Jhansi
    B)Bombay and Thane
    C)Bombay and Kolkata
    D)New Delhi and Chennai
    Answer: New Delhi and Jhansi
  • Q. Normally material train will work during ________.
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day
  • Q. W/L board will be provided at not less than ________ metres from the gate.
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: 10 kmph
  • Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
    A)Normal
    B)20 kmph
    C)50 kmph
    D)Stop at every station
    Answer: 20 kmph
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. Which is the longest station name in Indian Railways?
    A)Kharagpur
    B)Kanyakumari
    C)Venkatanarasimharajuvaripeta
    D)Chhatrapati Shivaji Terminus
    Answer: Venkatanarasimharajuvaripeta
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes
  • Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
    A)National Academy of Indian Railways
    B)Indian Railway Institute of Signal Engineering and Telecommunication
    C)Research Designs and Standards Organisation
    D)Indian Railway Service of Electrical Engineers
    Answer: Research Designs and Standards Organisation
  • Q. In case of goods train without brake van, Guard is exempted from ________.
    A)Whistling
    B)ARS
    C)Tail Lamp
    D)None of these
    Answer: ARS
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25