More Questions on Indian Railway
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. During shunting, outer, home and ________ signals are not taken off.
A)Both
B)Last stop signal
C)First stop signal
D)None of these
Answer: First stop signal
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. passing through station during day when running without brakevan and tail board.
A)25 kmph
B)10 kmph
C)20 kmph
D)Normal speed
Answer: 20 kmph
- Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
A)400 meters
B)270 meters
C)90 meters
D)None of these
Answer: 90 meters
- Q. Length of a standard BG loop line is
A)720 meters
B)686 meters
C)670 meters
D)None of these
Answer: 686 meters
- Q. If the points are set for main line, point indicator gives ________ light in the night.
A)Yellow
B)red
C)Green
D)White
Answer: White
- Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
A)Army Head Quarter
B)Railway Board
C)Zonal HQ
D)None of these
Answer: Army Head Quarter
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
A)15 km
B)18 km
C)10 km
D)20 km
Answer: 15 km
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. Which train in India has the longest route length?
A)Kanyakumari - Dibrugarh Vivek Express
B)Howrah - Jammu Tawi Himgiri Express
C)Kanyakumari - Jammu Tawi Himsagar Express
D)Guwahati - Tiruvananthapuram Express
Answer: Kanyakumari - Dibrugarh Vivek Express
- Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
A)10
B)20
C)30
D)None of these
Answer: 10
- Q. Consider the following statements with respect to the Railway Convention Committee: 1)The committee consists of members only from Lok Sabha 2)Railway Minister is the ex – officio chairman of Railway Convention Committee Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Neither 1 nor 2
- Q. Under approved special instructions, Distant signal can be placed along with the
A)Both
B)Last Stop
C)First Stop
D)None of these
Answer: Last Stop
- Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. Station working rules of an interlocked station is prepared by Sr. DOM and ________.
A)Sr. DSTE
B)DOM
C)COM
D)None of these
Answer: Sr. DSTE
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State