Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Correct Answer

30

More Questions on Indian Railway

  • Q. In which year palace on wheels train inaugurated?
    A)1982
    B)1988
    C)1978
    D)1965
    Answer: 1982
  • Q. Hand shunting speed is ________
    A)8 kmph
    B)5 kmph
    C)10 kmph
    D)None of these
    Answer: 5 kmph
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
    A)40 kmph
    B)15 kmph
    C)30 kmph
    D)Normal
    Answer: 40 kmph
  • Q. Shunt signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: First stop signal
  • Q. Adequate distance mentioned in the automatic block system is ________ meters.
    A)105
    B)110
    C)120
    D)115
    Answer: 120
  • Q. Semi-automatic signal is identified by ________.
    A)Illuminated a marker
    B)Marker
    C)Semi marker
    D)None of these
    Answer: Illuminated a marker
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control,
    D)Unable to proceed, Guard protect the train in rear
    Answer: Unable to proceed, Guard protect the train in rear
  • Q. Where is the Indian Railways Institute of Civil Engineering Institute situated?
    A)Nasik
    B)Pune
    C)Chennai
    D)Secunderabad
    Answer: Pune
  • Q. In which institution the training of electric work is being given?
    A)Railway Staff College
    B)Indian Railways Institute of Mechanical and Electrical Engineering
    C)Indian Railways Institute of Electrical Engineering
    D)Indian Railways Institute of Civil Engineering
    Answer: Indian Railways Institute of Electrical Engineering
  • Q. The speed of cycle/moped trolley is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
    A)National Academy of Indian Railways
    B)Indian Railway Institute of Signal Engineering and Telecommunication
    C)Research Designs and Standards Organisation
    D)Indian Railway Service of Electrical Engineers
    Answer: Research Designs and Standards Organisation
  • Q. India’s first – ever railways disaster management centre will come up in which city?
    A)Lucknow
    B)Kolkata
    C)Bengaluru
    D)Pune
    Answer: Bengaluru
  • Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Load infringing standard moving dimensions (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. While pushing back, train shall be stopped at ________ stop signal.
    A)Slip
    B)Outermost
    C)Rear most
    D)None of these
    Answer: Outermost