More Questions on Indian Railway
- Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. Illuminated A marker of semi-automatic signal means ________.
A)Outer signal
B)Working as automatic signal
C)Semi signal
D)None of these
Answer: Working as automatic signal
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
A)NTPC
B)ONGC
C)GAIL India
D)IOCL
Answer: GAIL India
- Q. Which of the following is India’s first green railway corridor?
A)Chennai to Manamadurai
B)Barmer to Munawab
C)Manamadurai to Rameswaram
D)Puri to Visakhapatnam
Answer: Manamadurai to Rameswaram
- Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1)
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(1)
- Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Nil caution order
B)Caution order
C)Reminder order
D)None of these
Answer: Caution order
- Q. For block forwarded form ________ must be issued.
A)Both
B)T/806+LSSS
C)T/608
D)None of these
Answer: T/806+LSSS
- Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
A)3 man
B)02 man
C)04 man
D)None of these
Answer: 04 man
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. How much block overlap is required at the station equipped with single line MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
A)5
B)15
C)20
D)None of these
Answer: 15
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. Minimum radius for curves in BG is
A)20°
B)16°
C)10°
D)None of these
Answer: 10°
- Q. For ‘B’ Class ISMD load, permission must be granted by
A)CE
B)DRM
C)CRS
D)None of these
Answer: CE
- Q. Nil Caution order number is ________
A)T/C409
B)T/A-409
C)T/B-409
D)None of these
Answer: T/A-409
- Q. Which is the following pairs of regional Railways and their headquarters not true?
A)South Railway - Chennai
B)South-Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State