- Q. IBP is a Station in which class?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. No. of vehicles that can be attached to goods trains in rear of BV is
A)2 bogie or its equivalent
B)2 bogies
C)1 bogies
D)None of these
Answer: 2 bogie or its equivalent
- Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
A)600 meters
B)400 meters
C)500 meters
D)800 meters
Answer: 600 meters
- Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
A)Green
B)White
C)Red
D)NIL
Answer: NIL
- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. Where is the wheel and axle plant of Indian Railways situated ?
A)Mysore
B)Chennai
C)Bangalore
D)Chitradurga
Answer: Bangalore
- Q. What is the maximum speed over facing point in non-interlocked station?
A)15 kmph
B)50 kmph
C)75 kmph
D)25 kmph
Answer: 15 kmph
- Q. Reminder Caution Order is?
A)T/B409
B)T/409
C)T/A409
D)None of these
Answer: T/B409
- Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
A)ST 1-800
B)ST 1-600
C)ST 1-700
D)None of these
Answer: ST 1-600
- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. Which research arm of Indian Railways has launched “New Online Vendor Registration System”?
A)National Academy of Indian Railways
B)Indian Railway Institute of Signal Engineering and Telecommunication
C)Research Designs and Standards Organisation
D)Indian Railway Service of Electrical Engineers
Answer: Research Designs and Standards Organisation
- Q. Speed of train when whistle becomes defective is ________ km/h.
A)45/8
B)30/8
C)25/8
D)40/8
Answer: 25/8
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
A)15
B)10
C)20
D)40
Answer: 15
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
A)15 km
B)18 km
C)10 km
D)20 km
Answer: 15 km
- Q. Staff of ________ department shall protect the material train while working in block section.
A)Engineering
B)Operation
C)C & W
D)None of these
Answer: Engineering