Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Correct Answer

30

More Questions on Indian Railway

  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. Termination indication board will be
    A)Rectangular
    B)Square
    C)Round
    D)None of these
    Answer: Round
  • Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
    A)16
    B)20
    C)12
    D)10
    Answer: 16
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. Consider the following statements about the Railway Convention Committee: 1)It consists of members from Lok Sabha only 2)Chairman of Railway Convention Committee is appointed by Lok Sabha speaker Which among the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. What is the maximum speed of a goods train pushed backed from block section ?
    A)15/8 kmph
    B)15 kmph
    C)8 kmph
    D)None of these
    Answer: 8 kmph
  • Q. Which of the following two countries have largest electrified railway network in the world?
    A)Russia & China
    B)Russia & US
    C)US & China
    D)India & US
    Answer: Russia & China
  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. Which is the India’s first double Decker train?
    A)Guwahati Thiruvananthapuram Express
    B)Ahmedabad - Mumbai Central Double Decker Express
    C)Samjhauta Express
    D)Howrah – Dhanbad Double Decker Express
    Answer: Howrah – Dhanbad Double Decker Express
  • Q. When water level is just above top of rail speed of electric locomotive shall apply ?
    A)15 kmph
    B)5 kmph
    C)10 kmph
    D)20 kmph
    Answer: 10 kmph
  • Q. Which of the following has been declared the cleanest railway station in the A1 category, as per 2018 cleanliness survey for Indian Railways?
    A)Jodhpur
    B)Jaipur
    C)Tirupati
    D)Warangal
    Answer: Jodhpur
  • Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. Which of the following zones administers the Matheran Hill Railway?
    A)Central Railways
    B)Konkan Railways
    C)Western Railways
    D)Southern Railways
    Answer: Central Railways
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. The validity of BCC is for ________ years
    A)01 years
    B)03 years
    C)02 years
    D)None of these
    Answer: 03 years
  • Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
    A)Received train
    B)Train Divided
    C)Thorugh train
    D)None of these
    Answer: Train Divided
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0
  • Q. If the driver does not receive all right signal from the guard, he must call by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short
    D)None of these
    Answer: Two sharp whistles
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal

Leave a Comment