Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.

Correct Answer

30

More Questions on Indian Railway

  • Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
    A)Defective
    B)Caution
    C)Cautiously
    D)None of these
    Answer: Cautiously
  • Q. Who has been appointed as the new Union Minister of Railways?
    A)Ashwini Vaishnaw
    B)Piyush Goyal
    C)Nirmala Sitharaman
    D)Mukhtar Abbas Naqvi
    Answer: Ashwini Vaishnaw
  • Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
    A)ST 1-260
    B)ST 1-600
    C)1-400
    D)None of these
    Answer: ST 1-600
  • Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below:
    A)1, 2, 3, 4 & 5
    B)Only 2, 3 & 4
    C)Only 2, 3, 4, 5
    D)Only 2, 3 & 5
    Answer: 1, 2, 3, 4 & 5
  • Q. India’s first – ever railways disaster management centre will come up in which city?
    A)Lucknow
    B)Kolkata
    C)Bengaluru
    D)Pune
    Answer: Bengaluru
  • Q. On double line, when a running line is blocked by stabled load , the point to be set against are
    A)Advance point
    B)Either side points
    C)Rear points
    D)None of these
    Answer: Rear points
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. A jumper is remote control and is used for ________.
    A)Control on Light, Fan etc.
    B)Light
    C)Fans
    D)None of these
    Answer: Control on Light, Fan etc.
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
    A)9
    B)10
    C)3
    D)4
    Answer: 10
  • Q. Number of the Nil caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 408
    D)None of these
    Answer: T/A 409
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
    A)5
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
    A)0000-000
    B)000000-0000 0
    C)00000-0
    D)0000-0000
    Answer: 000000-0000 0
  • Q. Percentage of in operative cylinders that can be attached in goods train is
    A)5%
    B)15%
    C)10%
    D)None of these
    Answer: 15%
  • Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
    A)T/A-912
    B)T/B-912
    C)T/C-912
    D)None of these
    Answer: T/B-912