More Questions on Indian Railway
- Q. Isolation shall be provided at an interlocked station when the speed is
A)Above 50 kmph
B)50 kmph
C)75 kmph
D)None of these
Answer: Above 50 kmph
- Q. Track maintenance machine is permitted to work during
A)Day clear weather
B)Day
C)Day and Night
D)None of these
Answer: Day and Night
- Q. When was the new Harbour rail line inaugurated?
A)1931
B)1925
C)1928
D)1933
Answer: 1925
- Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
A)T-1425
B)T-806 +Caution order
C)T/D 602 + T-511
D)None of these
Answer: T/D 602 + T-511
- Q. Which is the following pairs of regional Railways and their headquarters not true?
A)South Railway - Chennai
B)South-Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. What will be distance between fire affected train and rest of the train ?
A)50 meters
B)25 meters
C)45 meters
D)100 meters
Answer: 45 meters
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
A)10
B)20
C)30
D)None of these
Answer: 10
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
A)0-00
B)00-00
C)000-000
D)None of these
Answer: 00-00
- Q. Notice station notified in?
A)SR
B)SWR
C)GR
D)Working Time Table
Answer: Working Time Table
- Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
A)No light
B)White
C)Red
D)None of these
Answer: Red
- Q. It is a Python Rake.
A)15 kmph
B)60 kmph
C)25 kmph
D)Normal speed
Answer: 60 kmph
- Q. When baking a train from one line to the other line, it is necessary to present the train guard.
A)Break van
B)Point
C)Station
D)Any Place
Answer: Break van
- Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
A)1 - 890 meters
B)1 - 98 meters
C)1 - 830 meters
D)None of these
Answer: 1 - 98 meters
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. There is insufficient vacuum/pressure in engine.
A)_____00
B)___0___
C)0___0
D)00-----
Answer: 00-----
- Q. Percentage of in operative cylinders that can be attached in goods train is
A)5%
B)15%
C)10%
D)None of these
Answer: 15%
- Q. Read the Following Railway Headquarters and Identify which is False?
A)South Railway - Chennai
B)South - Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. Suburban Working time table is signed by ________ , COM and CPTM.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM