Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.

Correct Answer

One Long

More Questions on Indian Railway

  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes
  • Q. The numbers of A, B and C coaches are 72, ________ and 76.
    A)71
    B)72
    C)70
    D)75
    Answer: 70
  • Q. Who has been appointed the new Financial Commissioner (FC) of Indian Railways?
    A)Anand Mathur
    B)A K Prasad
    C)S K Bhagat
    D)Akhil Agrawal
    Answer: A K Prasad
  • Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
    A)30 kmph
    B)Normal speed
    C)15 kmph
    D)60 kmph
    Answer: 60 kmph
  • Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
    A)One long one short
    B)One Long Two Short
    C)Two long one short
    D)None of these
    Answer: One Long Two Short
  • Q. For which time Guard rough journal must be kept safe?
    A)Upto 3 Years
    B)Upto 1 Year
    C)Upto 2 Years
    D)Upto 6 Months
    Answer: Upto 3 Years
  • Q. A lorry shall be protected by banner flags and detonators if it remains stationary within the station yard for more than
    A)20 meters
    B)15 meters
    C)10 meters
    D)None of these
    Answer: 15 meters
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
    A)3
    B)1
    C)2
    D)4
    Answer: 3
  • Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
    A)Rajinder Sachar Committee
    B)Bibek Deberoy committee
    C)Rangarajan committee
    D)Mihir Shah Committee
    Answer: Bibek Deberoy committee
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. If the points are set for main line, point indicator gives ________ light in the night.
    A)Yellow
    B)red
    C)Green
    D)White
    Answer: White
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
    A)Uttarakhand
    B)Bihar
    C)Uttar Pradesh
    D)Delhi
    Answer: Uttar Pradesh
  • Q. What will be the maximum speedof train in case of failure of headlight of engine?
    A)60 kmph
    B)30 kmph
    C)40 kmph
    D)Normal speed
    Answer: 40 kmph
  • Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
    A)100 meters
    B)45 meters
    C)50 meters
    D)1000 meters
    Answer: 45 meters
  • Q. Sand hump is a substitute to ________ and also a means of isolation.
    A)Over signal
    B)Signal
    C)Signal overlap
    D)None of these
    Answer: Signal overlap

Leave a Comment