More Questions on Indian Railway
- Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
A)43
B)41
C)42
D)45
Answer: 45
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. In Material train, vehicles shall not be detached on gradient.
A)1-400
B)ST 1-260
C)1-100 or steeper
D)None of these
Answer: 1-100 or steeper
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light
- Q. Form number of disconnection and reconnection is ________.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
A)400
B)900
C)800
D)700
Answer: 400
- Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________
A)15/6
B)15/8
C)15/4
D)15/2
Answer: 15/8
- Q. What is the name of the first train of Indian Railways handed over to private players for operation?
A)Karnataka Express
B)Tejas Express
C)Shatabdi Express
D)Duronto Express
Answer: Tejas Express
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. BSLB determines the limits of Station section and ________.
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
A)40 kmph
B)15 kmph
C)30 kmph
D)Normal
Answer: 40 kmph
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. passing through station during day when running without brakevan and tail board.
A)25 kmph
B)10 kmph
C)20 kmph
D)Normal speed
Answer: 20 kmph
- Q. General Manger is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)None of these
Answer: Railway Board
- Q. On which authority relief train shall be dispatched for obstructed block section?
A)On memo
B)PLCT
C)T/A602
D)None of these
Answer: T/A602
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20
- Q. New freight corridors announced at ________
A)Kharagpur - Vijayawada
B)Delhi - Chennai
C)Kharagpur - Mumbai
D)Gujarat - Agra
Answer: Gujarat - Agra
- Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad
B)Kolkata
C)Secunderabad
D)Gorakhpur
Answer: Secunderabad
- Q. The number of private number sheet is ________.
A)T/99 D
B)T/99 F
C)T/99 A
D)T/99 E
Answer: T/99 F