Q. In case of ACP, Guard of EMU shall give ________ bell.

Correct Answer

00-0-00

More Questions on Indian Railway

  • Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
    A)80
    B)70
    C)75
    D)85
    Answer: 75
  • Q. While pushing back, train shall be stopped at ________ stop signal.
    A)Slip
    B)Outermost
    C)Rear most
    D)None of these
    Answer: Outermost
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. If the driver does not receive all right signal from the guard, he must call by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short
    D)None of these
    Answer: Two sharp whistles
  • Q. During TFC in double line which authority to serve the driver for train operation?
    A)TC-602
    B)TC-1425
    C)TA-602
    D)TD-1425
    Answer: TC-602
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. When the Loco pilot should contact with SM on telephone while IBS in “ON” position?
    A)Immediate
    B)After 5 minutes
    C)After 2 minutes
    D)After 1 miutes in day and 2 minutes in night
    Answer: After 1 miutes in day and 2 minutes in night
  • Q. At least how far will the final detonator be used to defend the train in broad gauge?
    A)820 meters
    B)180 meters
    C)600 meters
    D)1220 meters
    Answer: 1220 meters
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
    A)Gujarat
    B)Kerala
    C)Tamil Nadu
    D)Andhra Pradesh
    Answer: Kerala
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. What will be the prescribed form for DMT Block?
    A)E/223
    B)T/409
    C)T/806
    D)E/233
    Answer: E/223
  • Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. In which of the following cities are located 3 zonal headquarters of Indian Railways?
    A)New Delhi
    B)Guwahati
    C)Mumbai
    D)Kolkata
    Answer: Kolkata
  • Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
    A)T/A409
    B)T/369(1)
    C)T/409
    D)No Need of any Authority
    Answer: T/369(1)
  • Q. ________ number of Guard wagons shall be attached in either direction of explosive wagons.
    A)3 - 3
    B)1 - 1
    C)2 - 2
    D)4 - 4
    Answer: 2 - 2
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. Cycle trollies shall be treated as ________.
    A)Motor Trolley
    B)Push Trollies
    C)Trolley
    D)None of these
    Answer: Push Trollies
  • Q. What is the means of EA in WTT?
    A)Extra recovery time
    B)Extra allowances
    C)Engineering allowances
    D)None of these
    Answer: Engineering allowances