Q. If the driver does not received all right signal from the guard, he must call for is by giving.

Correct Answer

Two sharp whistles

More Questions on Indian Railway

  • Q. For how many days the 4500 kms BPC is valid?
    A)45 days
    B)12+3 days
    C)30 days
    D)No limit
    Answer: 12+3 days
  • Q. The speed of cycle/moped trolley is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. The Maitree Express connects India with which of the following countries?
    A)Bangladesh
    B)Myanmar
    C)Pakistan
    D)Nepal
    Answer: Bangladesh
  • Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
    A)Central Reserve Police Force
    B)Assam Rifles
    C)National Security Guard
    D)Sashastra Seema Bal
    Answer: National Security Guard
  • Q. In Material train, vehicles shall not be detached on gradient.
    A)1-400
    B)ST 1-260
    C)1-100 or steeper
    D)None of these
    Answer: 1-100 or steeper
  • Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
    A)15/10 km/h
    B)25/10 km/h
    C)20/10 km/h
    D)None of these
    Answer: 15/10 km/h
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Where did Chapman form the committee?
    A)Edimbara
    B)Glassgo
    C)London
    D)Lords
    Answer: London
  • Q. Derailment will come under accident class ________.
    A)C
    B)A
    C)B
    D)D
    Answer: D
  • Q. P marker is provided for a
    A)Semaphore warner
    B)Colour light distance
    C)Semaphore distant
    D)None of these
    Answer: Colour light distance
  • Q. Suburban Working time table is signed by ________ , COM and CPTM.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. ________ percent sub – quota for women under all reserved categories
    A)33
    B)30
    C)35
    D)40
    Answer: 33
  • Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.
    A)Executive
    B)Examine
    C)Next Examine
    D)None of these
    Answer: Next Examine
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Weight required minimum for testing IC Apparatus is the
    A)7 - 10 kg
    B)6 kg
    C)10 kg
    D)None of these
    Answer: 7 - 10 kg
  • Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: 10 kmph
  • Q. In how many zones Indian Railway has been divided?
    A)17
    B)14
    C)16
    D)20
    Answer: 17

Leave a Comment