More Questions on Indian Railway
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20
- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: Normal
- Q. SLB determines the limits of Station section and ________
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. When was the construction work for the first Railway line Started?
A)1823
B)1821
C)1828
D)1830
Answer: 1821
- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
A)50 seconds
B)120 seconds
C)90 seconds
D)None of these
Answer: 120 seconds
- Q. Which state government has recently signed MoU with Indian Railways to expand green cover?
A)Maharashtra
B)Kerala
C)Uttar Pradesh
D)Rajasthan
Answer: Maharashtra
- Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
A)T/369(1)
B)T/369(3b)
C)T/369(2)
D)T/409
Answer: T/409
- Q. Loss of Railway property of ________ is treated as serious accident.
A)75 Lakhs
B)More than 50 lakhs
C)01 crore
D)More than 02 crore
Answer: More than 02 crore
- Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
A)10
B)20
C)30
D)None of these
Answer: 10
- Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
A)1918
B)1911
C)1913
D)1917
Answer: 1911
- Q. Motor Trolley permit is ________
A)T/1625
B)T/1425
C)T/1525
D)None of these
Answer: T/1525
- Q. Repeating signal shows ________ light in ON condition.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
A)In Break van
B)At Facing point
C)On Engine
D)At Anyplace
Answer: In Break van
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. Which of the gauges is used in the hilly areas?
A)Narrow gauge
B)Broad gauge
C)Meter gauge
D)Special gauge
Answer: Narrow gauge
- Q. when form T/D 912 is issued the driver shall not exceed the speed
A)25 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State