Q. For disconnection of points S&T official must issue form ________

Correct Answer

T/351

More Questions on Indian Railway

  • Q. Guard’s assistance is required by LP.
    A)0
    B)0
    C)0
    D)____
    Answer: 0
  • Q. The Driver of goods train must stop his train as close as possible to ________.
    A)Both
    B)Starter
    C)Advance Starter
    D)None of these
    Answer: Starter
  • Q. What will be the maximum speedof train in case of failure of headlight of engine?
    A)60 kmph
    B)30 kmph
    C)40 kmph
    D)Normal speed
    Answer: 40 kmph
  • Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
    A)T/A-912
    B)T/B-912
    C)T/C-912
    D)None of these
    Answer: T/B-912
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
    A)50 seconds
    B)120 seconds
    C)90 seconds
    D)None of these
    Answer: 120 seconds
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. In case of 1 in 100 rising gradient, ________ siding is provided.
    A)Slip
    B)Long
    C)Catch
    D)None of these
    Answer: Slip
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
    A)Only 1 & 3
    B)Only 1 & 2
    C)Only 2 & 3
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. The length of long welded rail under Indian conditions should be about
    A)0.50 km
    B)1 km
    C)2 km
    D)None of these
    Answer: 1 km
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second
  • Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
    A)600
    B)500
    C)400
    D)800
    Answer: 600
  • Q. During power failure in automatic block section, on which authority relief engine will proceed?
    A)TC-912
    B)TA-912
    C)TB-912
    D)TD-912
    Answer: TC-912
  • Q. Sounding of 4 hooters means ________.
    A)ART & MRV requirement at home Station
    B)ART
    C)MRV
    D)None of these
    Answer: ART & MRV requirement at home Station
  • Q. Hand shunting speed is ________
    A)8 kmph
    B)5 kmph
    C)10 kmph
    D)None of these
    Answer: 5 kmph
  • Q. During failure of signals and communications in DL automatic area the authority to proceed is
    A)T/B 912
    B)T/D 912
    C)T/A 912
    D)None of these
    Answer: T/B 912
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B