More Questions on Indian Railway
- Q. Load table is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
A)50 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 15 kmph
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. Block instrument and Advanced starter being failed after line clear?
A)T-369(3B) with P. NO. of line clear
B)T/C 1425
C)T/D 602 + T-511
D)T/D 1425
Answer: T-369(3B) with P. NO. of line clear
- Q. What is the maximum speed in block section during thick & foggy weather?
A)15 kmph
B)30 kmph
C)60 kmph
D)Not to move
Answer: 60 kmph
- Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
A)Madhya Pradesh
B)Tamil Nadu
C)West Bengal
D)Punjab
Answer: West Bengal
- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. For how many days the 4500 kms BPC is valid?
A)45 days
B)12+3 days
C)30 days
D)No limit
Answer: 12+3 days
- Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
A)45
B)70
C)65
D)75
Answer: 75
- Q. During hand shunting only ________ Bogies can be hand shunted.
A)3
B)1
C)2
D)None of these
Answer: 1
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours
B)04 hours
C)08 hours
D)16 hours
Answer: 16 hours
- Q. Shunting restrictions of station is written in ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: SWR
- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. Station manager of a big station shall inspect the cabins at least once in ________.
A)Thrice in a week.
B)Once in a week
C)Twice in a week
D)None of these
Answer: Once in a week
- Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)10
B)3
C)4
D)20
Answer: 20
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. The White light in point indicator indicates?
A)Pass run through
B)Loop line is set
C)Main line set
D)All is right
Answer: Main line set
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State