Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. In diesel engine, ignition is caused by
    A)Compression
    B)Spark
    C)Automatic starter
    D)Friction
    Answer: Compression
  • Q. ________ is measured with the help of anemometer.
    A)Both
    B)Wind
    C)Velocity
    D)None of these
    Answer: Both
  • Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
    A)Only 1 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 1, 3 & 4
    Answer: Only 1
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block?
    A)Memo + Hand Signal
    B)T-369(3b)
    C)PLCT
    D)Starter should be taken off
    Answer: T-369(3b)
  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. The numbers of A, B and C coaches are 72, ________ and 76.
    A)71
    B)72
    C)70
    D)75
    Answer: 70
  • Q. At A class station, Neutral zone is the portion between starter and ________ signal.
    A)Home signal
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. The time limit for starting BD special during day is ________.
    A)30 meters
    B)20 meters
    C)15 meters
    D)40 meters
    Answer: 30 meters
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second
  • Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
    A)20 days
    B)10 days
    C)15 days
    D)None of these
    Answer: 15 days
  • Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
    A)Walkie-Talkie
    B)Walkie
    C)VHF
    D)None of these
    Answer: Walkie-Talkie
  • Q. Which is the India’s first double Decker train?
    A)Guwahati Thiruvananthapuram Express
    B)Ahmedabad - Mumbai Central Double Decker Express
    C)Samjhauta Express
    D)Howrah – Dhanbad Double Decker Express
    Answer: Howrah – Dhanbad Double Decker Express
  • Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is
    A)Unrestricted
    B)75 kmph
    C)50 kmph
    D)None of these
    Answer: 75 kmph
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. Which railway station entered Limca Book of Records 2018 for having all – women staff?
    A)Hazrat Nizamuddin railway station
    B)Chhatrapati Shivaji Terminus railway station
    C)Matunga railway station
    D)Kolkata railway station
    Answer: Matunga railway station
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B

Leave a Comment