Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A
5
B
10
C
20
D
None of these
Correct Answer
10
More Questions on Indian Railway
Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3 B)1 2 3 4 C)1 2 4 3 D)3 1 4 2
Answer: 4 2 1 3
Q. It is the responsibility of SM to see that shunting is performed as per ________.
A)G&R B)WTT C)SWR D)None of these
Answer: SWR
Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph B)10 kmph C)15 kmph D)Normal speed
Answer: 15 kmph
Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
A)8 kmph B)15 kmph C)25 kmph D)None of these
Answer: 15 kmph
Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8 B)7 C)9 D)10
Answer: 9
Q. Goods train without brake van shall not be run during ________.
A)CCF B)BCF C)ACF D)None of these
Answer: ACF
Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one B)Non Tangible C)Tangible D)None of these
Answer: Tangible
Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be
A)No light B)White C)Red D)None of these
Answer: Red
Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal B)Calling-on Signal C)Home Signal D)None of these
Answer: Home Signal
Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow B)RED C)Green D)None of these
Answer: RED
Q. At A class station, Neutral zone is the portion between starter and ________ signal.
A)Home signal B)Advance starter C)Starter D)None of these
Answer: Advance starter
Q. Who has been appointed as the new Chairman of Railway Board?
A)P S Thakur B)V K Yadav C)A K Mittal D)Neelmani Reddy
Answer: V K Yadav
Q. The speed of Engine on Baharline is ________ kmph
A)16 B)10 C)15 D)None of these
Answer: 10
Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
A)2 & 3 Only B)1 & 2 Only C)3 Only D)1, 2 & 3
Answer: 1, 2 & 3
Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph B)30 kmph C)25 kmph D)Normal speed
Answer: 25 kmph
Q. In which year the practice of presenting the railway budget separate from the general budget (or vice versa in true sense) started in India?
A)1925 B)1920 C)1924 D)1930
Answer: 1924
Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI B)CI C)LI D)TI
Answer: PWI
Q. In case of ACP Guard shall proceed towards the front from ________ side.
A)Back B)Left C)Right D)Noe of these
Answer: Left
Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of