Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
    A)ST 1-260
    B)ST 1-400
    C)1-400 or sleeper
    D)None of these
    Answer: 1-400 or sleeper
  • Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
    A)0-00
    B)00-00
    C)000-000
    D)None of these
    Answer: 00-00
  • Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
    A)50
    B)50
    C)40
    D)60
    Answer: 60
  • Q. How many minimum BP pressure is require in engine to charge Goods train?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
    A)1500
    B)1200
    C)1000
    D)1800
    Answer: 1000
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. Fog signal man must be on ________ Hrs duty.
    A)5
    B)3
    C)4
    D)None of these
    Answer: 3
  • Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
    A)540
    B)900
    C)580
    D)570
    Answer: 580
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
    A)DOUBLE YELLOW
    B)RED
    C)GREEN
    D)YELLOW
    Answer: GREEN
  • Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. Water over track is 90 mm.
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)25 kmph
    Answer: 10 kmph
  • Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
    A)10
    B)15
    C)20
    D)25
    Answer: 10
  • Q. Read the Following Railway Headquarters and Identify which is False?
    A)South Railway - Chennai
    B)South - Central Railway - Secunderabad
    C)Central railway - Bhopal
    D)North Railway - New Delhi
    Answer: Central railway - Bhopal
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)
  • Q. Booked speed of a train is ________ percent less than maximum permissible speed
    A)15
    B)5
    C)10
    D)20
    Answer: 10
  • Q. Stop signal is to be passed in On position.
    A)T-806
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(3b)
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways