Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
Correct Answer
10
More Questions on Indian Railway
- Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
A)90 meters
B)180 meters
C)120 meters
D)Zero
Answer: Zero
- Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
A)10
B)20
C)30
D)None of these
Answer: 10
- Q. After how much time Any goods train shall be treated as overdue train?
A)After 20 minutes
B)After 10 minutes
C)After 15 minutes
D)After 25 minutes
Answer: After 20 minutes
- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. Single line working inforce on double line.
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T/D 602
- Q. Warner signal is of ________ shape in TALQ signalling system.
A)Both
B)Fish Tailed
C)Long
D)None of these
Answer: Fish Tailed
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
A)1500 meters
B)200 meters
C)1000 meters
D)2000 meters
Answer: 1000 meters
- Q. Hand shunting is performed at speed not exceeding
A)05 kmph
B)10 kmph
C)08 kmph
D)None of these
Answer: 05 kmph
- Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. Colour of the semaphore shunt signal is ________.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. When was the first underground railway (Metro Railway) started?
A)1984
B)1982
C)1989
D)1992
Answer: 1984
- Q. When a running line is occupied ________ entry must be made in TSR.
A)Yellow Ink
B)Red Ink
C)Green Ink
D)None of these
Answer: Red Ink
- Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg
B)6 kg
C)10 kg
D)None of these
Answer: 7 - 10 kg
- Q. In the enroute, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. Motor Trolley permit is ________
A)T/1625
B)T/1425
C)T/1525
D)None of these
Answer: T/1525
- Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
A)35
B)20
C)25
D)30
Answer: 30
- Q. Approved special instructions are issued by ________.
A)PCOM
B)CRS
C)MT
D)None of these
Answer: CRS