Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A
5
B
10
C
20
D
None of these
Correct Answer
10
More Questions on Indian Railway
Q. Where is the Research, Design and Standard Organisation situated?
A)Pune B)Lucknow C)Bangalore D)New Delhi
Answer: Lucknow
Q. How many systems of working in Indian Railways for train operation?
A)8 B)6 C)7 D)9
Answer: 6
Q. The maximum distance covered by a patrol man should not normally exceed
A)15 KM B)10 KM a day C)12 KM D)None of these
Answer: 10 KM a day
Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
A)Walkie-Talkie B)Walkie C)VHF D)None of these
Answer: Walkie-Talkie
Q. Apart from the regular store, Guard of material train must also possess ________.
A)Third aid box B)First aid box C)Second aid box D)None of these
Answer: First aid box
Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
A)North Korea B)Japan C)South Korea D)China
Answer: Japan
Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
A)ST 1-260 B)ST 1-400 C)1-400 or sleeper D)None of these
Answer: 1-400 or sleeper
Q. Maximum speed of B’ class ODC is ________ km/h.
A)60 B)50 C)40 D)75
Answer: 40
Q. Motorman shall give ________ beat to release the hand brakes.
A)00-00-00 B)00-0-00 C)0-0-0 D)0-00-00
Answer: 00-0-00
Q. BSLB determines the limits of block section and ________ .
A)Station Limit B)Block Section C)Station Section D)None of these
Answer: Station Section
Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
A)1200 B)600 C)800 D)None of these
Answer: 600
Q. When a goods train is working without brake can the speed is
A)25 kmph by day and 15 kmph by night B)15 kmph C)25 kmph D)None of these
Answer: None of these
Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
A)Third B)First C)Second D)None of these
Answer: Third
Q. At A class station, Neutral zone is the portion between starter and ________ signal.
A)Home signal B)Advance starter C)Starter D)None of these
Answer: Advance starter
Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm B)60 mm C)70 mm D)50 mm
Answer: 50 mm
Q. Maximum No. of ________ coaches can be attached in rear of SLR of passenger train.
A)4 B)2 C)3 D)6
Answer: 2
Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling B)ARS C)Tail Lamp D)None of these
Answer: ARS
Q. What is the maximum speed in block section during thick & foggy weather?
A)15 kmph B)30 kmph C)60 kmph D)Not to move
Answer: 60 kmph
Q. Termination indication board will be
A)Rectangular B)Square C)Round D)None of these
Answer: Round
Q. By whom the rear portion of train left behind in block section protected?
A)By engineearing official B)By Guard C)By LP D)No need to protect the load