Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. In case of 1 in 100 rising gradient, ________ siding is provided.
    A)Slip
    B)Long
    C)Catch
    D)None of these
    Answer: Slip
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. While protecting the material train, banner flag is placed at a distance of
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. The number of line clear ticket in down direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/D 1425
    Answer: T/D 1425
  • Q. Distant signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Permissive
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Which state to have India’s first privately – run railway station?
    A)Kerala
    B)Tripura
    C)Odisha
    D)Madhya Pradesh
    Answer: Madhya Pradesh
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these
  • Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
    A)20 days
    B)10 days
    C)15 days
    D)None of these
    Answer: 15 days
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. The length of long welded rail under Indian conditions should be about
    A)0.50 km
    B)1 km
    C)2 km
    D)None of these
    Answer: 1 km
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 20 kmph
  • Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
    A)NTPC
    B)ONGC
    C)GAIL India
    D)IOCL
    Answer: GAIL India
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. During TFC in double line which authority to serve the driver for train operation?
    A)TC-602
    B)TC-1425
    C)TA-602
    D)TD-1425
    Answer: TC-602