More Questions on Indian Railway
- Q. Cotton in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
A)Receive on loop line
B)Run through from station
C)Receive of Main line
D)None of these
Answer: Run through from station
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. Notice station notified in?
A)SR
B)SWR
C)GR
D)Working Time Table
Answer: Working Time Table
- Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
A)Stop his train and find the cause
B)Proceed further with same speed up to next station
C)Proceed further with normal speed
D)None of these
Answer: Stop his train and find the cause
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
A)6.8
B)7.8
C)5.8
D)4.8
Answer: 4.8
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third
B)First
C)Second
D)Fourth
Answer: Fourth
- Q. Length of a BG ICF Coach is
A)21.337 meters
B)22.089 meters
C)21.494 meters
D)None of these
Answer: 21.337 meters
- Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on
B)Shunt signal
C)Private No.
D)None of these
Answer: Private No.
- Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km
B)4300 Km
C)3700 Km
D)5298 km
Answer: 3700 Km
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Q. To apply for Line block, the notice shall be given to DRM not less than
A)12 hours
B)48 hours
C)24 hours
D)None of these
Answer: 24 hours
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Under approved special instructions, Distant signal can be placed along with the
A)Both
B)Last Stop
C)First Stop
D)None of these
Answer: Last Stop
- Q. Block back are used at?
A)Single/Double line both
B)On Single line
C)On Double line
D)None of these
Answer: Single/Double line both
- Q. The largest national enterprise of India is
A)Airways
B)Indian Railway
C)Indian Shipyard
D)Waterways
Answer: Indian Railway
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper