- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
A)Only 1, 2 & 4
B)Only 1 & 2
C)Only 1, 2 & 3
D)1, 2, 3 & 4
Answer: Only 1, 2 & 4
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600
B)500
C)400
D)800
Answer: 600
- Q. What is maximum width for 8-Wheeled Goods stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3050 mm
- Q. Termination indication board will be
A)Rectangular
B)Square
C)Round
D)None of these
Answer: Round
- Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
A)650
B)700
C)725
D)760
Answer: 760
- Q. While pushing back, train shall be stopped at ________ stop signal.
A)Slip
B)Outermost
C)Rear most
D)None of these
Answer: Outermost
- Q. Trap indicator is provided to indicate ________.
A)Provision Switch
B)Indication Switch
C)Derailing switch
D)None of these
Answer: Derailing switch
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. ISMD must be attached always
A)In the middle
B)Next to Engine
C)In rear
D)None of these
Answer: Next to Engine
- Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
A)40
B)45
C)30
D)35
Answer: 45
- Q. How much block overlap is required at the station equipped with single line MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958
- Q. Distance between two automatic signals is called as ________.
A)Signalling Section
B)Block section
C)Mid Section
D)None of these
Answer: Signalling Section
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. In one train only system, information of lost of metal token is given to ________.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3
B)1 2 3 4
C)1 2 4 3
D)3 1 4 2
Answer: 4 2 1 3
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph