Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A
5
B
10
C
20
D
None of these
Correct Answer
10
More Questions on Indian Railway
Q. Marshalling rules of passenger train are framed by ________.
A)DRM B)DOM C)COM D)AOM
Answer: COM
Q. To start the train from a line with common starter, ________ authority is issued.
A)T/512 B)T/516 C)T/517 D)T/511
Answer: T/512
Q. How many minimum BP pressure is require in engine to charge Goods train?
A)5.8 kg/cm2
D. 5.00 kg/cm2 B)4.8 kg/cm2
B. 6.00 kg/cm2
C. 5.8 kg/cm2
D. 5.00 kg/cm2 C)6.00 kg/cm2
C. 5.8 kg/cm2
D. 5.00 kg/cm2 D)5.00 kg/cm2
Answer: 5.00 kg/cm2
Q. The minimum BP pressure is requiring on engine before continuity test is?
A)5.8 kg/cm2
D. 5.00 kg/cm2 B)4.8 kg/cm2
B. 6.00 kg/cm2
C. 5.8 kg/cm2
D. 5.00 kg/cm2 C)6.00 kg/cm2
C. 5.8 kg/cm2
D. 5.00 kg/cm2 D)5.00 kg/cm2
Answer: 5.00 kg/cm2
Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912 B)TA-912 C)TB-912 D)TC-1425
Answer: TA-912
Q. While protecting the material train, banner flag is placed at a distance of
A)600 B)400 C)500 D)800
Answer: 600
Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph B)5 kmph C)8 kmph D)None of these
Answer: 5 kmph
Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
A)72 B)24 C)48 D)None of these
Answer: 72
Q. What is the width of broad gauge railway line in India?
Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200 B)600 C)800 D)None of these
Answer: 600
Q. The Driver of goods train must stop his train as close as possible to ________.
A)Both B)Starter C)Advance Starter D)None of these
Answer: Starter
Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
A)15:30 B)14:30 C)12:30 D)13:30
Answer: 13:30
Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
A)01 long B)03 long C)02 long D)None of these
Answer: 03 long
Q. Second train during TSL will be dispatched after ________.
A)Both B)Line clear C)Without line clear D)None of these
Answer: Line clear
Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both B)PN C)Non-PN D)None of these
Answer: PN
Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
A)Germany B)Sweden C)Russia D)Italy
Answer: Germany
Q. Material train is a ________ train.
A)Both B)Departmental C)Permanent D)None of these
Answer: Departmental
Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter B)Home, Starter C)Distance Home Starter D)None of these
Answer: Home, Starter
Q. The headquarters of Northern Railway is at
A)Gorakhpur B)New Delhi C)Guwahati D)Mumbai (CST)
Answer: New Delhi
Q. A material train may be divided outside station limit during emergency under the supervision of ________.