Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. The validity of BCC is for ________ years
    A)01 years
    B)03 years
    C)02 years
    D)None of these
    Answer: 03 years
  • Q. ISMD must be attached always
    A)In the middle
    B)Next to Engine
    C)In rear
    D)None of these
    Answer: Next to Engine
  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. Special instructions are issued by whom?
    A)Authorized officer
    B)CCM
    C)CRS
    D)None of these
    Answer: Authorized officer
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. In two aspects areas where shunting in the face of approaching train is not permitted, shunting can be permitted during ________ and under certain conditions (UP to FSS).
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day
  • Q. India’s first – ever railways disaster management centre will come up in which city?
    A)Lucknow
    B)Kolkata
    C)Bengaluru
    D)Pune
    Answer: Bengaluru
  • Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
    A)5
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Which of the following has become the India’s first railway station to have sanitary napkin vending machine?
    A)Kolkata railway station
    B)Thane railway station
    C)Hazrat Nizamuddin railway station
    D)Bhopal railway station
    Answer: Bhopal railway station
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. At which place the detonators shall be placed during thick & foggy weather on The Absolute block section?
    A)180-10 Meters from outermost signal
    B)270-10 Meters from outermost signal
    C)270-10 Meters from First stop signal
    D)No need to place detonators
    Answer: 270-10 Meters from First stop signal
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Intermediate Block home will be provided only on ________ Line.
    A)Triple
    B)Single
    C)Double
    D)None of these
    Answer: Single
  • Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
    A)0-00
    B)00-00
    C)000-000
    D)None of these
    Answer: 00-00
  • Q. A material train may be divided outside station limit during emergency under the supervision of ________.
    A)Driver
    B)Guard
    C)PWI
    D)None of these
    Answer: PWI
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. When was the nationalization of Indian Railways done?
    A)1951
    B)1952
    C)1950
    D)1954
    Answer: 1950
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van