Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. In double Distant signalling, outermost signal post is painted with ________.
    A)Green & Yellow
    B)White & yellow
    C)Black & Yellow
    D)None of these
    Answer: Black & Yellow
  • Q. The first locomotive which was manufactured in Chittaranjan on
    A)Sep - 1949
    B)Nov - 1950
    C)Oct - 1950
    D)Oct - 1954
    Answer: Nov - 1950
  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year
  • Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
    A)DOUBLE YELLOW
    B)RED
    C)GREEN
    D)YELLOW
    Answer: GREEN
  • Q. New freight corridors announced at ________
    A)Kharagpur - Vijayawada
    B)Delhi - Chennai
    C)Kharagpur - Mumbai
    D)Gujarat - Agra
    Answer: Gujarat - Agra
  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. What is the massage of 000 (three short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control
    D)Unable to proceed
    Answer: Train out of control
  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways
  • Q. No passenger train shall be started from a station before the ________ time
    A)Both
    B)Advertised
    C)Non-advertised
    D)None of these
    Answer: Advertised
  • Q. Block section limit board provided at station?
    A)B class Single line TA
    B)B class Single line MAUQ
    C)B class Double line TA
    D)B class Double line MA
    Answer: B class Double line MA
  • Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
    A)Both
    B)UP
    C)Falling
    D)None of these
    Answer: UP
  • Q. How many members did the railway board had?
    A)4
    B)3
    C)5
    D)8
    Answer: 4
  • Q. Guard of suburban train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)45
    C)30
    D)15
    Answer: 15
  • Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 3 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. BD special shall be turned out during night within
    A)30 meters
    B)25 meters
    C)45 meters
    D)None of these
    Answer: 45 meters
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph
  • Q. Through which of the following group of states does the Konkan Railways run?
    A)Maharashtra - Karnataka - Kerala - Tamil Nadu
    B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
    C)Maharashtra - Karnataka - Goa
    D)Karnataka - Goa - Kerala - Tamil Nadu
    Answer: Maharashtra - Karnataka - Goa

Leave a Comment