Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. Your train is first during TSL on double line.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. Which of the following has been adjudged as the cleanest railway station in category A1, as per recently released report by the Ministry of Railways?
    A)Secunderabad
    B)Vishakhapatnam
    C)Jammu Tawi
    D)Anand ViharTerminal
    Answer: Vishakhapatnam
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Goods warning board will be provided from FSS in BG at
    A)560 meters
    B)1400 meters
    C)1000 meters
    D)None of these
    Answer: 1400 meters
  • Q. Who has been appointed as the new Union Minister of Railways?
    A)Ashwini Vaishnaw
    B)Piyush Goyal
    C)Nirmala Sitharaman
    D)Mukhtar Abbas Naqvi
    Answer: Ashwini Vaishnaw
  • Q. Which authority shall be received to proceed for obstructed block section due to an Accident?
    A)T/A 602
    B)T-1425
    C)T-369(3b)+P.No.
    D)Simple memo
    Answer: T/A 602
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. Shatabdi Express train was started in ________.
    A)1990
    B)1984
    C)1988
    D)1985
    Answer: 1988
  • Q. Danger zone in 1500 DC traction is ________ meters from OHE.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. Amount of vaccum level required in high speed train loco is
    A)56 cm
    B)50 cm
    C)55 cm
    D)None of these
    Answer: 56 cm
  • Q. Staff of ________ department shall protect the material train while working in block section.
    A)Engineering
    B)Operation
    C)C & W
    D)None of these
    Answer: Engineering
  • Q. The maximum speed of the assistance train to be sent on T/A 602
    A)30 kmph
    B)10 kmph
    C)15 kmph
    D)40 kmph
    Answer: 15 kmph
  • Q. The Ministry of Railways has signed MoU with which Union Ministry to augment services in Railway hospitals?
    A)Ministry of Social Justice and Empowerment
    B)Ministry of Women and Child Development
    C)Ministry of Drinking Water and Sanitation
    D)Ministry of AYUSH
    Answer: Ministry of AYUSH
  • Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
    A)9
    B)10
    C)3
    D)4
    Answer: 10
  • Q. Interchange point of Central and Western railway is ________.
    A)Both
    B)Dadar
    C)Jalgaon
    D)None of these
    Answer: Both
  • Q. Booked speed of a train is ________ percent less than maximum permissible speed
    A)15
    B)5
    C)10
    D)20
    Answer: 10
  • Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)10
    B)3
    C)4
    D)20
    Answer: 20
  • Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
    A)80
    B)70
    C)75
    D)85
    Answer: 75

Leave a Comment