Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph

Correct Answer

10

More Questions on Indian Railway

  • Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
    A)DOUBLE YELLOW
    B)RED
    C)GREEN
    D)YELLOW
    Answer: GREEN
  • Q. As per the recent survey conducted by the Quality Council of India, which railway stations have been named as the cleanest and dirtiest railway stations in India?
    A)Indore and Visakhapatnam
    B)Darbhanga and Allahabad
    C)Allahabad and Indore
    D)Visakhapatnam and Darbhanga
    Answer: Visakhapatnam and Darbhanga
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. The speed of cycle/moped trolley is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Loco pilot must have ________ sets of spectacles in his personal store.
    A)Three
    B)Two
    C)One
    D)None of these
    Answer: Two
  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
    A)Both
    B)Temporary Working Order.
    C)Permanent working order.
    D)None of these
    Answer: Temporary Working Order.
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. Patrolman becoming overdue during night.
    A)40 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 10 kmph
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
    A)Defective
    B)Caution
    C)Cautiously
    D)None of these
    Answer: Cautiously
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Which whistle code shall be used by loco pilot while Guard’s assistance is required?
    A)Three short
    B)Long continue
    C)Intermediate long continue
    D)Three long
    Answer: Three short
  • Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
    A)ST 1-260
    B)ST 1-600
    C)1-400
    D)None of these
    Answer: ST 1-600
  • Q. When a stream engine is running tender foremost the speed shall not exceed ________.
    A)30 kmph
    B)40 kmph
    C)20 kmph
    D)None of these
    Answer: 40 kmph
  • Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
    A)RailSilver
    B)RailSagar
    C)RailCloud
    D)RailBharat
    Answer: RailCloud
  • Q. Distant signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Permissive
  • Q. Which is the following pairs of regional Railways and their headquarters not true?
    A)South Railway - Chennai
    B)South-Central Railway - Secunderabad
    C)Central railway - Bhopal
    D)North Railway - New Delhi
    Answer: Central railway - Bhopal
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A