- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Time taken by train running at MPS is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Minimum running time
- Q. Through which of the following group of states does the Konkan Railways run?
A)Maharashtra - Karnataka - Kerala - Tamil Nadu
B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
C)Maharashtra - Karnataka - Goa
D)Karnataka - Goa - Kerala - Tamil Nadu
Answer: Maharashtra - Karnataka - Goa
- Q. A lorry shall be protected by banner flags and detonators if it remains stationary within the station yard for more than
A)20 meters
B)15 meters
C)10 meters
D)None of these
Answer: 15 meters
- Q. General Manager is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)Finance Ministry
Answer: Railway Board
- Q. ________ brake is not provided in the coach of passenger train.
A)Minor
B)Hand
C)Non-hand
D)None of these
Answer: Hand
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. In case of train parting ________ bell code is given on block instrument.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-000
- Q. In automatic block area SL. The LSS shall not be taken of unless the line is clear upto
A)Automatic stop signal+180 Meters
B)next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: next automatic stop signal
- Q. Signals are treated as ________ if connected points become defective.
A)Both
B)Defective
C)Restricted
D)None of these
Answer: Defective
- Q. Block overlap in multiple aspect signalling system is ________ meters.
A)180
B)200
C)300
D)208
Answer: 180
- Q. Speed of the following tower wagon is ________ km/h.
A)9
B)10
C)8
D)4
Answer: 8
- Q. Motor Trolley permit is ________
A)T/1625
B)T/1425
C)T/1525
D)None of these
Answer: T/1525
- Q. Loco pilot shall not take alcoholic drinks before ________ hours from signing on duty.
A)8
B)5
C)4
D)10
Answer: 8
- Q. Where is the extreme north of India a railway station?
A)Pathankot
B)Jammu Tawi
C)Baramulla
D)Guwahati
Answer: Baramulla
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. For Temporary diversions, the permission must be obtained from
A)CE
B)CRS
C)Railway Board
D)None of these
Answer: Railway Board
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters