Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.

Correct Answer

15

More Questions on Indian Railway

  • Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
    A)Guwahati
    B)Kochi
    C)Chennai
    D)New Delhi
    Answer: New Delhi
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. Which of the following zones administers the Matheran Hill Railway?
    A)Central Railways
    B)Konkan Railways
    C)Western Railways
    D)Southern Railways
    Answer: Central Railways
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Second
  • Q. If the train passes through without headlight, SM shall give ________ bell code and advise the reason.
    A)0000-0
    B)000000-0
    C)00000-0
    D)0000-00
    Answer: 000000-0
  • Q. What will be the maximum speedof train in case of failure of headlight of engine?
    A)60 kmph
    B)30 kmph
    C)40 kmph
    D)Normal speed
    Answer: 40 kmph
  • Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
    A)100 meters
    B)45 meters
    C)50 meters
    D)1000 meters
    Answer: 45 meters
  • Q. BSLB determines the limits of block section and ________ .
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
    A)3
    B)6
    C)4
    D)2
    Answer: 6
  • Q. Illuminated A marker of semi-automatic signal means ________.
    A)Outer signal
    B)Working as automatic signal
    C)Semi signal
    D)None of these
    Answer: Working as automatic signal
  • Q. Calling on signal shows ________ light in off position in two aspect signalling system.
    A)Green
    B)White
    C)RED
    D)Yellow
    Answer: Yellow
  • Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
    A)CSO
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
    A)01 long
    B)03 long
    C)02 long
    D)None of these
    Answer: 03 long
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. In how many zones Indian Railway has been divided?
    A)17
    B)14
    C)16
    D)20
    Answer: 17
  • Q. Indian Railway Act means ________.
    A)Part 23 of 1989
    B)Part 22 of 1989
    C)Part 24 of 1989
    D)Part 21 of 1989
    Answer: Part 24 of 1989
  • Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
    A)South Western Railway
    B)North Eastern Railway
    C)South Central Railway
    D)North Central Railway
    Answer: South Central Railway
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT