Q. Diesel locomotives are built in?

Correct Answer

Varanasi

More Questions on Indian Railway

  • Q. Sounding of 5 hooters means ________.
    A)ART, MRV required at out station
    B)ART
    C)MRV
    D)None of these
    Answer: ART, MRV required at out station
  • Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
    A)8
    B)5
    C)2
    D)4
    Answer: 2
  • Q. Minimum depth of space for wheel flange from rail level in BG is
    A)3"
    B)2"
    C)1 (1/2)"
    D)None of these
    Answer: 1 (1/2)"
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. For a passenger carrying train to stop with a few passengers vehicles beyond platform, it must be permitted by
    A)DOM
    B)DSO
    C)DRM
    D)None of these
    Answer: DRM
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?
    A)West Bengal ↔ Tripura
    B)Arunachal Pradesh ↔ Tripura
    C)Sikkim ↔ West Bengal
    D)Arunachal Pradesh ↔ Assam
    Answer: Sikkim ↔ West Bengal
  • Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
    A)ALP
    B)Driver
    C)Guard
    D)None of these
    Answer: Guard
  • Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
    A)1 - 890 meters
    B)1 - 98 meters
    C)1 - 830 meters
    D)None of these
    Answer: 1 - 98 meters
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: 10 kmph
  • Q. Train is to be passed through loop line.
    A)30 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. When ISMD attached train is allowed to run through on PF line the speed must be
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
    A)T/606
    B)T/605
    C)T/606
    D)T/609
    Answer: T/609
  • Q. Shatabdi Express train was started in ________.
    A)1990
    B)1984
    C)1988
    D)1985
    Answer: 1988
  • Q. Where is the Research, Design and Standard Organisation situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. Written authority received to pass approach stop signal.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. In which country was flange wheel invented?
    A)Europe
    B)Germany
    C)Japan
    D)Russia
    Answer: Germany
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. Where is the information about the Ruling Gradient of a section?
    A)G & SR
    B)SWR
    C)WTT
    D)Operating Manual
    Answer: WTT