Q. Diesel locomotives are built in?

Correct Answer

Varanasi

More Questions on Indian Railway

  • Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
    A)50
    B)50
    C)40
    D)60
    Answer: 60
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
    A)Defective
    B)Caution
    C)Cautiously
    D)None of these
    Answer: Cautiously
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. The headquarters of Northern Railway is at
    A)Gorakhpur
    B)New Delhi
    C)Guwahati
    D)Mumbai (CST)
    Answer: New Delhi
  • Q. Special instructions are issued by ________.
    A)Both
    B)COM
    C)Sr. DOM
    D)None of these
    Answer: COM
  • Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
    A)Power
    B)Electrical & Diesel
    C)Diesel
    D)None of these
    Answer: Electrical & Diesel
  • Q. TCAS full form is:
    A)Train Collision Avoidance Software
    B)Train Collision Advance System
    C)Train Complement Accident Software
    D)Traffic Collision Avoidance System
    Answer: Traffic Collision Avoidance System
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. Not more than ________ persons including trollyman shall go on a trolly.
    A)9
    B)10
    C)3
    D)4
    Answer: 10
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 2
  • Q. S mark on the EMU coach means ________.
    A)Scroll
    B)Release
    C)Spare
    D)None of these
    Answer: Spare
  • Q. Which of the following two countries have largest electrified railway network in the world?
    A)Russia & China
    B)Russia & US
    C)US & China
    D)India & US
    Answer: Russia & China
  • Q. The Driver of goods train must stop his train as close as possible to ________.
    A)Both
    B)Starter
    C)Advance Starter
    D)None of these
    Answer: Starter
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Competency certificate of the gateman of interlocked engineering gate is signed by
    A)Both
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: Both
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal