Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter B)1200 Meter C)1000 Meter D)500 Meter
Answer: 800 Meter
Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
A)1000 meters B)400 meters C)600 meters D)None of these
Answer: 600 meters
Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
A)8 B)3 C)5 D)10
Answer: 3
Q. The length of long welded rail under Indian conditions should be about
A)0.50 km B)1 km C)2 km D)None of these
Answer: 1 km
Q. IBS shows ________ light in normal condition.
A)Green B)White C)Red D)Yellow
Answer: Red
Q. When was the first train in India started?
A)1853 B)1851 C)1852 D)1854
Answer: 1853
Q. Speed of second train during temporary single line working is ________.
A)Both B)Normal C)Abnormal D)None of these
Answer: Normal
Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
A)10 kmph B)25 kmph C)15 kmph D)None of these
Answer: 25 kmph
Q. The number of private number sheet is ________.
A)T/99 D B)T/99 F C)T/99 A D)T/99 E
Answer: T/99 F
Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw B)Piyush Goyal C)Nirmala Sitharaman D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
Q. Block competency certificate is issued by ________.
A)AOM B)Principal ZRTI C)SM D)None of these
Answer: Principal ZRTI
Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective B)Caution C)Cautiously D)None of these