Q. Diesel locomotives are built in?

Correct Answer

Varanasi

More Questions on Indian Railway

  • Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
    A)20
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
    A)Madhya Pradesh
    B)Tamil Nadu
    C)West Bengal
    D)Punjab
    Answer: West Bengal
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. No passenger train shall be started from a station before the ________ time
    A)Both
    B)Advertised
    C)Non-advertised
    D)None of these
    Answer: Advertised
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. When was the North-Eastern frontier Railway (NFR) established?
    A)2nd January, 1956
    B)15th January, 1958
    C)15th January, 1955
    D)14th April, 1952
    Answer: 15th January, 1958
  • Q. Validity of the competency certificate of the gateman is for ________ years.
    A)9
    B)10
    C)3
    D)4
    Answer: 3
  • Q. The length of sand hump is about ________ feet.
    A)170
    B)150
    C)120
    D)170
    Answer: 170
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. Which type Authority to proceed shall be used at without starter signal station on single line?
    A)Any one
    B)Non Tangible
    C)Tangible
    D)None of these
    Answer: Tangible
  • Q. What is the position of the Indian Railway in the world according to the length of rail lines?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Fourth
  • Q. Hand shunting of vehicles is prohibited in gradient
    A)1 - 400 or steeper
    B)1 - 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400 or steeper
  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. Material train is a ________ train.
    A)Both
    B)Departmental
    C)Permanent
    D)None of these
    Answer: Departmental
  • Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
    A)Gate opened and point is not set for main line
    B)Gate closed and point is set for main line
    C)Gate opened and point is set for main line
    D)Defective signal
    Answer: Defective signal
  • Q. The zone with the minimum length is
    A)South - East Railway
    B)North - Eastern Railway
    C)North - Eastern Frontier Railway
    D)South - Central Railway
    Answer: North - Eastern Frontier Railway
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
    A)--0
    B)0-0
    C)-0-
    D)---
    Answer: 0-0
  • Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
    A)1918
    B)1911
    C)1913
    D)1917
    Answer: 1911

Leave a Comment