Q. Diesel locomotives are built in?

Correct Answer

Varanasi

More Questions on Indian Railway

  • Q. Which Zone is the largest in Indian Railways?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Eastern Railway
  • Q. During TFC in single line section what authority to proceed will be served to driver of Dn train during return.
    A)TH-602
    B)T/A-602
    C)TG-602
    D)TB-602
    Answer: TH-602
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
    A)A & B both
    B)Absent from his duty
    C)Indiscipline
    D)None of these
    Answer: Absent from his duty
  • Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Nil caution order
    B)Caution order
    C)Reminder order
    D)None of these
    Answer: Caution order
  • Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
    A)50 kmph
    B)Booked
    C)Sectional
    D)None of these
    Answer: Sectional
  • Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
    A)Both
    B)Off
    C)On
    D)None of these
    Answer: On
  • Q. Adequate distance means the distance sufficient to ensure ________.
    A)Station Limit
    B)Safety
    C)Non-Safety
    D)None of these
    Answer: Safety
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. Which of the following zones administers the Matheran Hill Railway?
    A)Central Railways
    B)Konkan Railways
    C)Western Railways
    D)Southern Railways
    Answer: Central Railways
  • Q. Who has been appointed the new Financial Commissioner (FC) of Indian Railways?
    A)Anand Mathur
    B)A K Prasad
    C)S K Bhagat
    D)Akhil Agrawal
    Answer: A K Prasad
  • Q. Time taken by train running at MPS is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Minimum running time
  • Q. When did the first ignition engine develop?
    A)1900
    B)1890
    C)1892
    D)1904
    Answer: 1892
  • Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)10
    B)3
    C)4
    D)20
    Answer: 20
  • Q. In which year palace on wheels train inaugurated?
    A)1982
    B)1988
    C)1978
    D)1965
    Answer: 1982
  • Q. If the train passes through without headlight, SM shall give ________ bell code and advise the reason.
    A)0000-0
    B)000000-0
    C)00000-0
    D)0000-00
    Answer: 000000-0
  • Q. During power failure in automatic block section, on which authority relief engine will proceed?
    A)TC-912
    B)TA-912
    C)TB-912
    D)TD-912
    Answer: TC-912
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board