More Questions on Indian Railway
- Q. Impact speed of shunting of one box wagon is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 5
- Q. Maximum height above rail level for a low passenger platform in BG is
A)840 mm
B)455 mm
C)760 mm
D)None of these
Answer: 455 mm
- Q. Sounding of ________ hooters means accident of goods train at home station.
A)6
B)2
C)4
D)8
Answer: 2
- Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
A)145
B)45
C)90
D)150
Answer: 45
- Q. If Goods Train catches fire ________ Must be preserved and sent to DCM.
A)Non-Samples
B)Samples & Seal Cards
C)Samples
D)None of these
Answer: Samples & Seal Cards
- Q. How many institutions do give suggestions for railways technology?
A)Three
B)One
C)Two
D)Four
Answer: Two
- Q. Under approved special instructions, Distant signal can be placed along with the
A)Both
B)Last Stop
C)First Stop
D)None of these
Answer: Last Stop
- Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8
B)7
C)9
D)10
Answer: 9
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
A)One short
B)Two short
C)Three short
D)Noen of these
Answer: Two short
- Q. In which country was flange wheel invented?
A)Europe
B)Germany
C)Japan
D)Russia
Answer: Germany
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. The headquarters of North – Eastern railway is situated at
A)Gorakhpur
B)Mumbai (CST)
C)Guwahati
D)New Delhi
Answer: Gorakhpur
- Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
A)Two
B)Four
C)Three
D)Any one
Answer: Three
- Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
A)ALP
B)Driver
C)Guard
D)None of these
Answer: Guard
- Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
A)8 kmph
B)15 kmph
C)25 kmph
D)None of these
Answer: 15 kmph
- Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
A)One long
B)Three long
C)Short one long
D)None of these
Answer: Three long
- Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
A)1500
B)1200
C)1000
D)1800
Answer: 1000
- Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section
B)Station diary
C)Diary
D)None of these
Answer: Station diary