Q. Diesel locomotives are built in?

Correct Answer

Varanasi

More Questions on Indian Railway

  • Q. It is the responsibility of SM to see that shunting is performed as per ________.
    A)G&R
    B)WTT
    C)SWR
    D)None of these
    Answer: SWR
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
    A)10
    B)20
    C)30
    D)None of these
    Answer: 10
  • Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
    A)RailSilver
    B)RailSagar
    C)RailCloud
    D)RailBharat
    Answer: RailCloud
  • Q. Goods train without brake van shall not be run during ________.
    A)CCF
    B)BCF
    C)ACF
    D)None of these
    Answer: ACF
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. Speed of second train during temporary single line working is ________.
    A)Both
    B)Normal
    C)Abnormal
    D)None of these
    Answer: Normal
  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B
  • Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. EMU trains of harbour line has ________ number of wooden wedges.
    A)6
    B)2
    C)4
    D)8
    Answer: 4
  • Q. What will be the minimum distance of 2 Towar Wagons in the same block section ?
    A)130 meters
    B)100 meters
    C)120 meters
    D)140 meters
    Answer: 120 meters
  • Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
    A)3 man
    B)02 man
    C)04 man
    D)None of these
    Answer: 04 man
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
    A)Army Head Quarter
    B)Railway Board
    C)Zonal HQ
    D)None of these
    Answer: Army Head Quarter
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
    A)ALP
    B)Driver
    C)Guard
    D)None of these
    Answer: Guard
  • Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25