Q. Competency certificate of the gateman of interlocked engineering gate is issued by
A)SSE/C & W B)SSE/P.way C)SSE/Sig. D)None of these
Answer: SSE/P.way
Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
A)5 B)3 C)4 D)6
Answer: 3
Q. Metro Railway is functioning in which of the following Indian States?
A)West Bengal B)Gujarat C)Maharashtra D)Tamil Nadu
Answer: West Bengal
Q. For extinguished home signal, Loco Pilot will be issued ________ authority form the station in rear in MACLS system.
A)16 B)20 C)12 D)10
Answer: 16
Q. Goods warning board will be provided from FSS in BG at
A)560 meters B)1400 meters C)1000 meters D)None of these
Answer: 1400 meters
Q. Maximum permissible speed is fixed by ________.
A)MT B)CRS C)GM D)None of these
Answer: CRS
Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph B)25 kmph C)60 kmph D)Normal speed
Answer: 60 kmph
Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument B)Signal over lap C)Over lap D)None of these
Answer: Signal over lap
Q. D class station board is placed ________ meters from the end of the platform.
A)600 B)400 C)500 D)800
Answer: 500
Q. To attach the 12 coach EMU rake, ________ units are to be attached.
A)8 B)5 C)6 D)4
Answer: 4
Q. When was the first train steamed off in India?
A)1875 B)1848 C)1853 D)1880
Answer: 1853
Q. Maximum height above rail level for a low passenger platform in BG is
A)840 mm B)455 mm C)760 mm D)None of these
Answer: 455 mm
Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
A)Madhya Pradesh B)Tamil Nadu C)West Bengal D)Punjab
Answer: West Bengal
Q. ________ number of Guard wagons shall be attached in either direction of explosive wagons.
A)3 - 3 B)1 - 1 C)2 - 2 D)4 - 4
Answer: 2 - 2
Q. When a Train carrying passengers does not arrive within ________ minutes plus running time. The SM must take action.
A)15 B)10 C)20 D)None of these
Answer: 10
Q. In one train only system, information of lost of metal token is given to ________.
A)DRM B)DOM C)AOM D)None of these
Answer: DRM
Q. What is the speed of A class ODC in BG?
A)40 kmph B)15 kmph C)25 kmph D)Normal speed
Answer: Normal speed
Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
A)60 B)40 C)50 D)45
Answer: 45
Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph B)20 kmph C)25 kmph D)None of these
Answer: 30 kmph
Q. Maximum speed of the train while unloading ballast is ________ km/h.