More Questions on Indian Railway
- Q. Yearly coaching stock census is taken on ________.
A)31st January
B)31st December
C)31st October
D)31st March
Answer: 31st October
- Q. Block instrument and Advanced starter being failed after line clear?
A)T-369(3B) with P. NO. of line clear
B)T/C 1425
C)T/D 602 + T-511
D)T/D 1425
Answer: T-369(3B) with P. NO. of line clear
- Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
A)3
B)1
C)2
D)4
Answer: 3
- Q. Rajasthan is under which of the following railway zones?
A)North - Western region
B)Northern region
C)Western region
D)Central Region
Answer: North - Western region
- Q. Minimum depth of space for wheel flange from rail level in BG is
A)3"
B)2"
C)1 (1/2)"
D)None of these
Answer: 1 (1/2)"
- Q. Point indicator shows ________ light when the points are set for loop line.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. What is the maximum speed of 140 ton diesel hydraulic crane?
A)140 kmph
B)75 kmph
C)100 kmph
D)160 kmph
Answer: 75 kmph
- Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. The first locomotive which was manufactured in Chittaranjan on
A)Sep - 1949
B)Nov - 1950
C)Oct - 1950
D)Oct - 1954
Answer: Nov - 1950
- Q. During emergency, in the absence of tail board ________ can be used with the DRM.
A)Yellow flag
B)GREAN FLAG
C)RED FLAG
D)None of these
Answer: RED FLAG
- Q. Warner signal is of ________ shape in TALQ signalling system.
A)Both
B)Fish Tailed
C)Long
D)None of these
Answer: Fish Tailed
- Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
A)NTPC
B)ONGC
C)GAIL India
D)IOCL
Answer: GAIL India
- Q. What action should be taken by LP while observed Abnormal jurk in Ist block section of IBS?
A)If he failed to inform to SM, protection of the portion by Guard
B)Inform to SM through IBP phone
C)Check his train
D)All of above
Answer: All of above
- Q. Track maintenance machine is permitted to work during
A)Day clear weather
B)Day
C)Day and Night
D)None of these
Answer: Day and Night
- Q. India’s first – ever railways disaster management centre will come up in which city?
A)Lucknow
B)Kolkata
C)Bengaluru
D)Pune
Answer: Bengaluru
- Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
A)Counter circuit
B)Track circuit/axle counter
C)Circuit
D)None of these
Answer: Track circuit/axle counter
- Q. How many institutions do give suggestions for railways technology?
A)Three
B)One
C)Two
D)Four
Answer: Two
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State