More Questions on Indian Railway
- Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
A)Chittranjan
B)Varanasi
C)Perambur
D)Patiala
Answer: Chittranjan
- Q. ________ and ‘C’ class ODC shall not be crossed in the block section on double line.
A)60
B)50
C)40
D)75
Answer: 40
- Q. Which of the following has been declared the cleanest railway station in the A1 category, as per 2018 cleanliness survey for Indian Railways?
A)Jodhpur
B)Jaipur
C)Tirupati
D)Warangal
Answer: Jodhpur
- Q. Consider the following sectors: 1)Plantation Sector 2)Mining and Exploration of Metal 3)Railway Infrastructure In which of the above, government has permitted 100% FDI through automatic route?
A)2 & 3 Only
B)1 & 2 Only
C)3 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. Fog signal man must be on ________ Hrs duty.
A)5
B)3
C)4
D)None of these
Answer: 3
- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. Shunt signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: First stop signal
- Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg
B)6 kg
C)10 kg
D)None of these
Answer: 7 - 10 kg
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block?
A)Memo + Hand Signal
B)T-369(3b)
C)PLCT
D)Starter should be taken off
Answer: T-369(3b)
- Q. The maximum speed of a train while passing through station of interlocking std III is?
A)140 kmph
B)50 kmph
C)110 kmph
D)160 kmph
Answer: 140 kmph
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Q. The time taken for formation of a goods train in flat yard is
A)3 kmph
B)2 hrs
C)1 hr
D)None of these
Answer: 2 hrs
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. Trolley caution order no is ________.
A)600
B)400
C)500
D)800
Answer: 400
- Q. Matheran Hill Railway is located in which state of India?
A)Odisha
B)Himachal Pradesh
C)Maharashtra
D)Meghalaya
Answer: Maharashtra
- Q. Yearly coaching stock census is taken on ________.
A)31st January
B)31st December
C)31st October
D)31st March
Answer: 31st October