Q. Diesel locomotives are built in?

Correct Answer

Varanasi

More Questions on Indian Railway

  • Q. Station Working Rules of Non-interlocked station is signed by ________.
    A)AOM & ADEN
    B)DOM & DEN
    C)Sr. DOM & Sr. DEN
    D)None of these
    Answer: Sr. DOM & Sr. DEN
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. Repeating signal shows ________ light in ON condition.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. The time taken for formation of a goods train in flat yard is
    A)3 kmph
    B)2 hrs
    C)1 hr
    D)None of these
    Answer: 2 hrs
  • Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
    A)T/A-912
    B)T/B-912
    C)T/C-912
    D)None of these
    Answer: T/B-912
  • Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
    A)4
    B)2
    C)3
    D)6
    Answer: 2
  • Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Red
  • Q. 2 states of North East India will be connected through Broad Gauge. They are:
    A)Meghalaya and Assam
    B)Manipur and Meghalaya
    C)Mizoram and Manipur
    D)Mizoram and Arunachal Pradesh
    Answer: Mizoram and Manipur
  • Q. TCAS full form is:
    A)Train Collision Avoidance Software
    B)Train Collision Advance System
    C)Train Complement Accident Software
    D)Traffic Collision Avoidance System
    Answer: Traffic Collision Avoidance System
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
    A)Shimla
    B)Lucknow
    C)Chandigarh
    D)Siliguri
    Answer: Siliguri
  • Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Nil caution order
    B)Caution order
    C)Reminder order
    D)None of these
    Answer: Caution order
  • Q. Which state government has recently signed MoU with Indian Railways to expand green cover?
    A)Maharashtra
    B)Kerala
    C)Uttar Pradesh
    D)Rajasthan
    Answer: Maharashtra
  • Q. The maximum distance covered by a patrol man should not normally exceed
    A)15 KM
    B)10 KM a day
    C)12 KM
    D)None of these
    Answer: 10 KM a day
  • Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
    A)15 kmph
    B)20 kmph
    C)Stop & Start
    D)Normal speed
    Answer: Normal speed
  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
    A)Received train
    B)Through
    C)Train parted
    D)None of these
    Answer: Train parted
  • Q. IBP is a Station in which class?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. The minimum BP pressure is requiring on engine before continuity test is?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2

Leave a Comment