- Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
A)8
B)5
C)2
D)4
Answer: 2
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
A)60
B)40
C)50
D)45
Answer: 45
- Q. Station limit is the portion between ________.
A)Both
B)Outermost signal
C)Innermost signal
D)None of these
Answer: Outermost signal
- Q. Loco pilot shall not take alcoholic drinks before ________ hours from signing on duty.
A)8
B)5
C)4
D)10
Answer: 8
- Q. When was the construction work for the first Railway line Started?
A)1823
B)1821
C)1828
D)1830
Answer: 1821
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
A)T/C-912
B)T/B-912
C)T/D-912
D)None of these
Answer: T/D-912
- Q. Intermediate Block home will be provided only on ________ Line.
A)Triple
B)Single
C)Double
D)None of these
Answer: Single
- Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph
B)30 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
A)1500 meters
B)200 meters
C)1000 meters
D)2000 meters
Answer: 1000 meters
- Q. The headquarters of South – Central Railways is situated at
A)Secunderabad
B)Mumbai (CST)
C)Chennai
D)Mumbai (Central)
Answer: Secunderabad
- Q. ISMD must be attached always
A)In the middle
B)Next to Engine
C)In rear
D)None of these
Answer: Next to Engine
- Q. The first locomotive which was manufactured in Chittaranjan on
A)Sep - 1949
B)Nov - 1950
C)Oct - 1950
D)Oct - 1954
Answer: Nov - 1950
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. Joint sighting committee shall inspect the visibility of signals once in
A)6 months
B)A month
C)3 months
D)None of these
Answer: 3 months